We are progressing
|
Ground floor layout... Forming
|
Irons ready but at an increased rate now... Formal rate was 265K per Ton. Now we bought at 310 Per Ton.. 7 Tons for now...
|
We are here now to resume... Stay tuned and follow up with us.
|
We went on a short break. Resuming ASAP. Stay tuned. |
Work update today. Dining section
|
From our desk.
|
We are individually installing drains in each of the toilets... Brand new WC sets too...
|
Resuming this ASAP |
Will be uploading more updates today. We are just Day 3 into this renovation... |
Good morning all. We have a new renovation work here to do. Areas to renovate. Dinning. Sitting room Lobby New TV stand area. New Conduit piping. Find the picture below and follow up with us on it. Let's transform this space. Location: Oke Ira, Ogba Lagos State. We handle things and make them possible when you least expect it.
|
Good morning |
More pictures from the plumbing works which is a major component of what we are doing here... Piping for Wash Hands, Taps and Urinals on the new introduced screenwall... Also we are introducing floor drains to them. Side by side.
|
Horlardorjah:Thanks for your contributions so far. Keep it coming. It makes the thread interesting.
|
Horlardorjah:When we do the final work. You will see how it would look. We already put alot into consideration as well for the area. |
kopell:Thanks very much Sir |
For Bungalow Lovers |
More Designs coming here |
More construction pictures below. New Lintel Introduced on the structure to create room for a standard door height.
|
Horlardorjah:Its possible but the overhang on the structure wouldn't allow for that and also the distance between the screen Wall and the building itself. I would upload the one we are doing here...
|
More photo updates on the introduction of pillars to carry the newly introduced lintel.
|
We have completed yet another Bungalow Design for another client. Construction � to commence soon... 3 Bedroom Executive Bungalow Design
|
Counting down days to the resumption of this |
Keep following up with us for more updates... |
We are introducing new door heights. The existing one was very low. Just 1.6m. So we are making them 2.3m height with a 200mm clearance to elevate the floor for new tiling.
|
Timothyoj:Sure sir. Definitely posting them here on this project. |
Plumbing work update...
|
Taking delivery of plumbing piping materials for the facility... We are introducing floor drains to each of the toilet for waste water and ease of cleaning... Something it never had though... Keep following up with us for update on this.
|
Construction update...
|
Fast Forward to Start Up. We removed the existing roof completely. Introduced a screen wall to create privacy for the students. Coz at it is, no privacy at all for the facility. The screenwall also would have new features like the wash hand basins and taps too. We proceed with the foundation of it below...
|
Find attached the existing pictures of the School Toilet before we came here...
|
Hello great Nairaland followers... Thank you for finding time on our thread. We have always promised to bring to you up to speed our work progress in different locations. This project is a community project by Rotary Club Who contacted us to carry on this task. Currently, the school Toilet facility for the student is pit toilet which is very much delapidated and out of use for a while. Our task here is to completely change it to water cistern and introduce good sanitary system for both girls and boys. Total number of toilets is 10... To be upgraded from pot toilet to water cistern and wash hands with urinals and water taps introduced... Find attached the picture gallery of the work stages. First, we would be sharing the 3D model designed by Dennis3D ™ who us the contractor on this project... You can call it a community project carried out by Rotary Club of Ojodu in fulfillment of its role to touching lives of people... This project is been done in the tenure of the Opportunity President during the Opportunity Year of Rotary.
|