₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,123 members, 8,448,799 topics. Date: Monday, 20 July 2026 at 08:31 PM

Toggle theme

Dredgerbuilders's Posts

Nairaland ForumDredgerbuilders's ProfileDredgerbuilders's Posts

1 2 3 4 5 6 7 8 9 10 (of 26 pages)

PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 6:40am On Jan 18
We are open to services 24/7 as our teams are efficient with enough equipment to deliver services st south, East and western region at same time.

Call or Whatsapp:
081-66244710 Whatsapp
080-85998064

Thank you.
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 1:53am On Jan 12
We presently at MAGODO , rounding up a soil test.

We await your service.

Bless you.
082-66244710
PropertiesRe: Land Reclamation, Equipment And Expertrates by dredgerbuilders(op): 1:47am On Jan 12
DREDGER FOR HIRE

24/24 DREDGER FOR LEASE IN LAGOS #7000 PER CUBIC

Inspection Functionality test FEE. N300K

Technical Operational Details of 24 Inches Conventional Beaver Dredger
Dredging Specifications
- Suction Diameter. 24 inches (610 mm)
- Discharge Diameter. 22 inches (559 mm)
- Dredging Depth. Up to 15-20 meters (49-66 feet), depending on the configuration and soil conditions
- Dredging Method. Cutter Suction Dredging (CSD)

Dredge Pump
- Type. Centrifugal pump
- Power. Driven by a diesel engine (e.g. CAT 3516)
- Capacity. 2600-3000 m3/h (3400-3900 yd3/h)
- Head. Depends on the pump configuration and system requirements

Cutter Head
- Type. Conventional cutter head with blades and knives
- Power. riven by an electric or hydraulic motor
- Rotation Speed. Variable, depending on the material being dredged
- Cutter Suction Inlet. Designed to optimize material intake and minimize wear

Ladder and Spuds
- Ladder. Structural framework that supports the dredge pump and cutter head
- Spuds. Steel poles that anchor the dredger to the seabed or riverbed, allowing for controlled movement
- Spud Carriage. mechanism that moves the spuds up and down, enabling the dredger to adjust its position

Operational Controls
- *Dredge Control System*: regulates the dredge pump speed, cutter head rotation, and spud movement
- *Monitoring Systems*: instruments that track dredging performance, including production rates, pressure, and vacuum

Performance Characteristics
- *Production Rate*: depends on the material being dredged, dredging depth, and system configuration (typically 1000-3000 m3/h)
- *Dredging Efficiency*: optimized by adjusting cutter head rotation speed, dredge pump speed, and spud movement

Safety Features
- *Emergency Stop System*: allows for quick shutdown of the dredge pump and cutter head in case of an emergency
- *Warning Systems*: alerts operators to potential hazards, such as high pressure or vacuum levels

Maintenance Requirements
- *Regular Inspections*: scheduled inspections of the dredge pump, cutter head, and other critical components
- *Wear Part Replacement* regular replacement of wear parts, such as cutter head blades and pump impellers
- Lubrication and Cleaning. Regular lubrication and cleaning of moving parts to prevent wear and corrosion

These technical operational details provide a comprehensive overview of the 24-inch Conventional Beaver Dredger's capabilities and requirements.

Engr. Joseph Abe
081-66244710
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 6:09am On Jan 11
DREDGER FOR HIRE

24/24 DREDGER FOR LEASE IN LAGOS #7000 PER CUBIC

Inspection Functionality test FEE. N300K

Technical Operational Details of 24 Inches Conventional Beaver Dredger
Dredging Specifications
- Suction Diameter. 24 inches (610 mm)
- Discharge Diameter. 22 inches (559 mm)
- Dredging Depth. Up to 15-20 meters (49-66 feet), depending on the configuration and soil conditions
- Dredging Method. Cutter Suction Dredging (CSD)

Dredge Pump
- Type. Centrifugal pump
- Power. Driven by a diesel engine (e.g. CAT 3516)
- Capacity. 2600-3000 m3/h (3400-3900 yd3/h)
- Head. Depends on the pump configuration and system requirements

Cutter Head
- Type. Conventional cutter head with blades and knives
- Power. riven by an electric or hydraulic motor
- Rotation Speed. Variable, depending on the material being dredged
- Cutter Suction Inlet. Designed to optimize material intake and minimize wear

Ladder and Spuds
- Ladder. Structural framework that supports the dredge pump and cutter head
- Spuds. Steel poles that anchor the dredger to the seabed or riverbed, allowing for controlled movement
- Spud Carriage. mechanism that moves the spuds up and down, enabling the dredger to adjust its position

Operational Controls
- *Dredge Control System*: regulates the dredge pump speed, cutter head rotation, and spud movement
- *Monitoring Systems*: instruments that track dredging performance, including production rates, pressure, and vacuum

Performance Characteristics
- *Production Rate*: depends on the material being dredged, dredging depth, and system configuration (typically 1000-3000 m3/h)
- *Dredging Efficiency*: optimized by adjusting cutter head rotation speed, dredge pump speed, and spud movement

Safety Features
- *Emergency Stop System*: allows for quick shutdown of the dredge pump and cutter head in case of an emergency
- *Warning Systems*: alerts operators to potential hazards, such as high pressure or vacuum levels

Maintenance Requirements
- *Regular Inspections*: scheduled inspections of the dredge pump, cutter head, and other critical components
- *Wear Part Replacement* regular replacement of wear parts, such as cutter head blades and pump impellers
- Lubrication and Cleaning. Regular lubrication and cleaning of moving parts to prevent wear and corrosion

These technical operational details provide a comprehensive overview of the 24-inch Conventional Beaver Dredger's capabilities and requirements.

Kindly call for further enquiry

Engr. Joseph Abe

98166244710
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 12:28am On Jan 05
Sir,

100 pieces of slightly used Howo truck available for sakes in Sound state by chamise company.

PRICE: #30m each
QUALITY: 100 pieces

Call 081-6624-4710 Whatsapp
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 1:17pm On Jan 03
Happy new day
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 12:59pm On Jan 03
Happy new year, happy new day
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 9:35pm On Dec 26, 2025
Happy Christmas
PropertiesRe: Land Reclamation, Equipment And Expertrates by dredgerbuilders(op): 10:51pm On Dec 20, 2025
Happy weekend
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 6:30pm On Dec 18, 2025
Good day investors,
.Note it in mind that all your dredging investment has his foundational success on on Sand search report on your Dredging site because it will give you : peace of mind on either you have a commercial quantities of sand on the wand and the type of soil or sand there in

This will guide everyone on the type of dredger needed to do the project without guessing or making mistakes .

For your sand search work and other services relating to Dredging, l will always be available to serve you .

Thanks
.engr. Joseph Abe
081-66244710.
080-85998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 1:52am On Dec 15, 2025
Dear investors,

Make regular income investing your money in Dredging, see what we make in one of our client site we manage very well.

Pricing (first 2 cycles)*
- Dredger 14/12 × 2: ₦50,000,000
- Diesel (49,920 L × ₦1,200): ₦59,904,000
- Mob/Demob: ₦10,000,000
- Swamp‑buggy + diesel: ₦5,900,000
- Excavator + diesel mob/demob: ₦11,400,000
- Crew allowance: ₦1,500,000
- Contingency: ₦3,000,000
- Accommodation: ₦5,000,000
- Community settlement: ₦2,700,000

*Total cost:* ₦149,404,000

*Production (2 cycles)*

- 150 m³ × 8 h =
 1,200 m³/day
- 1,200 m³ × 26 days =
 31,200 m³, x2 cycle → 62,400 m³ total
- 62,400 m³ × 1.5 t/m³ = 93,600 t
- 93,600 t ÷ 25 t/

No of Truck 3,744 Cost per Truck:#70,000

Total: #262,080,000

*Third‑cycle cost*
- Dredger: ₦25,000,000
- Diesel: ₦29,952,000
- Excavator: ₦10,400,000
- Allowances: ₦750,000
- Contingency: ₦3,000,000

*Third‑cycle total:* ₦69,102,000

ENGR. Joseph Abe
Call 08166244710
08085998064
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 10:57pm On Dec 09, 2025
Dear sirs,

Dear sir,
ANALYSIS OF GEOLOGICAL SURVEY/SAND SEARCH OF YOUR LAKE

* We are going to use exclusively geological survey to identify commercial quantity visible sharp sand deposits within the project areas.
* We will give distance of water surface to sand depth to determine dredger lader length needed to do the dredging .
* We are going to give equator location and Co-ordinate to determine distance of borrow pit to sand field where sand is going to stockpiled.
* We are going to give a standard report to NIWA Standard for dredging permit processing approval.
* We will also be available (if called upon) for setting up the sites , coordinating equipment for maximal production and target goal.
* The exercise takes 3days for mobilization of equipment to site, geological sand search, co-ordinating report and submission .
* Total cost is between #1,000,000 and #1,500,000 for report of 8-10 borrow pits to Niwa approver depending on locations.

Thank you for your interest in our service.

Engr. Joseph Abe
A-Z Dredging equipment Ltd.
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 5:04am On Dec 09, 2025
Compliments
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 5:03am On Dec 09, 2025
Good day sirs, .
As an investors, why not think to do business in Dredging of sand PUMP AND SELL.

Hear in Lagos, we have off takers of sand in volumes been purchased for general contractors and masix road project for Lagos to Calabar coaster road ongoing project.

You can key into it and triple your investment in no time.

Thanks for considering our offer

Engr. Abey Joseph
08166244710
98985998064
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 5:43am On Dec 02, 2025
Happy new months, and have a wise investment decision.
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 5:25am On Nov 27, 2025
Happy sunrise House
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 5:32am On Nov 25, 2025
Good days,
We do a good topographic survey, sand search and soil test for miner anywhere within Nigeria.

Kindly contact us for your trusted services and report.

We also provide Dredging and other mining equipment for your use.

Do have a wise investment decision

Engr. Abe Joseph
08166244710, 0808599804
PropertiesRe: What You Benefit When We Manage Your Dredgers by dredgerbuilders(op): 12:31pm On Nov 24, 2025
Dear investors,
We have 10 acres water front of Land available for dredging in SHIRIWAN After Danhote refinery , Ibeju Lekki - Lagos

Also available is offtakers of your sand to Hiech project and LPO.

Call 08166244710 for more details
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 4:16pm On Nov 23, 2025
Happy day investoi,
If you are looking for type of investment good for you, consider dredging - pump and sell.

You can also dredge for HITECH contruction compay doing coaster road running from Lagos to Calabar.
This is a very profitsble contract .

Fir more inquiry, call engr. Joseph Abe on
081-66244710
08085998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 2:21am On Nov 21, 2025
Happy weekend to you all.

Do have a wise investment decision
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 6:15am On Nov 19, 2025
Good day sirs,

For any of your soil test, sand search , topographic survey and water front to do dredging business and update in profitable dredging contracts both from state and federal projects JOB ORDER, do contact us on

081-66244710
080-85998064
Engr. Joseph Abe
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 5:35am On Nov 16, 2025
DREDGING PROJECT UPDATE: STOCK PILING PROJECT*
We are pleased to report that our Stock Piling project is moving forward as planned. We have successfully secured a site and received a Local Purchase Order (L.P.O) from Hi-Tech to commence pumping operations.

*CURRENT STATUS:*

- Site secured and ready for operations
- L.P.O received from Hi-Tech
- Ready to commence pumping operations pending arrival of dredger

*INVESTMENT OPPORTUNITY:*
We are seeking an investor to provide the necessary funding to bring a dredger to site and commence pumping operations. This is a lucrative opportunity for the right investor, with a high potential for returns.

*PROJECT DETAILS:*

- Project location: Lagos
- Project scope: Stock piling
- Client: Hi-Tech
- Contract value: To be disclosed upon request

*INVESTMENT REQUIREMENTS:*

- Provision of dredger and necessary equipment
- Funding for operational costs

If you're interested in this investment opportunity, please contact us to discuss further.

*CONTACT DETAILS:*
AZ- DREDGINGS INVESTMENT LTD.
081-66244710
080-85998064

We look forward to hearing from you.
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 5:35am On Nov 16, 2025
DREDGING PROJECT UPDATE: STOCK PILING PROJECT*
We are pleased to report that our Stock Piling project is moving forward as planned. We have successfully secured a site and received a Local Purchase Order (L.P.O) from Hi-Tech to commence pumping operations.

*CURRENT STATUS:*

- Site secured and ready for operations
- L.P.O received from Hi-Tech
- Ready to commence pumping operations pending arrival of dredger

*INVESTMENT OPPORTUNITY:*
We are seeking an investor to provide the necessary funding to bring a dredger to site and commence pumping operations. This is a lucrative opportunity for the right investor, with a high potential for returns.

*PROJECT DETAILS:*

- Project location: Lagos
- Project scope: Stock piling
- Client: Hi-Tech
- Contract value: To be disclosed upon request

*INVESTMENT REQUIREMENTS:*

- Provision of dredger and necessary equipment
- Funding for operational costs

If you're interested in this investment opportunity, please contact us to discuss further.

*CONTACT DETAILS:*
AZ- DREDGINGS INVESTMENT LTD.
081-66244710
080-85998064

We look forward to hearing from you.
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 5:34am On Nov 16, 2025
DREDGING PROJECT UPDATE: STOCK PILING PROJECT*
We are pleased to report that our Stock Piling project is moving forward as planned. We have successfully secured a site and received a Local Purchase Order (L.P.O) from Hi-Tech to commence pumping operations.

*CURRENT STATUS:*

- Site secured and ready for operations
- L.P.O received from Hi-Tech
- Ready to commence pumping operations pending arrival of dredger

*INVESTMENT OPPORTUNITY:*
We are seeking an investor to provide the necessary funding to bring a dredger to site and commence pumping operations. This is a lucrative opportunity for the right investor, with a high potential for returns.

*PROJECT DETAILS:*

- Project location: Lagos
- Project scope: Stock piling
- Client: Hi-Tech
- Contract value: To be disclosed upon request

*INVESTMENT REQUIREMENTS:*

- Provision of dredger and necessary equipment
- Funding for operational costs

If you're interested in this investment opportunity, please contact us to discuss further.

*CONTACT DETAILS:*
AZ- DREDGINGS INVESTMENT LTD.
081-66244710
080-85998064

We look forward to hearing from you.
PropertiesRe: What You Benefit When We Manage Your Dredgers by dredgerbuilders(op): 5:33am On Nov 16, 2025
DREDGING PROJECT UPDATE: STOCK PILING PROJECT*
We are pleased to report that our Stock Piling project is moving forward as planned. We have successfully secured a site and received a Local Purchase Order (L.P.O) from Hi-Tech to commence pumping operations.

*CURRENT STATUS:*

- Site secured and ready for operations
- L.P.O received from Hi-Tech
- Ready to commence pumping operations pending arrival of dredger

*INVESTMENT OPPORTUNITY:*
We are seeking an investor to provide the necessary funding to bring a dredger to site and commence pumping operations. This is a lucrative opportunity for the right investor, with a high potential for returns.

*PROJECT DETAILS:*

- Project location: Lagos
- Project scope: Stock piling
- Client: Hi-Tech
- Contract value: To be disclosed upon request

*INVESTMENT REQUIREMENTS:*

- Provision of dredger and necessary equipment
- Funding for operational costs

If you're interested in this investment opportunity, please contact us to discuss further.

*CONTACT DETAILS:*
AZ- DREDGINGS INVESTMENT LTD.
081-66244710
080-85998064

We look forward to hearing from you.
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 11:34pm On Nov 15, 2025
Dear investors,

IKOYI RECLAMATION PROJECTS

A brief introduction to the Ikoyi Island Reclamation Dredging Project:

*Project Name:* Ikoyi Island Reclamation Dredging Project

*Project Overview:*

We invite investors to participate in a joint venture for the Ikoyi Island Reclamation Dredging Project, a collaboration between investors, stakeholders, and the Federal and State Governments. The project involves reclaiming 240 hectares of land, with 60 hectares allocated to this joint venture.

*Key Highlights:*

- Total area: 240 hectares (8 slots of 30 hectares each)

- Joint venture portion: 60 hectares (900 plots of land, approximately 585,000 square meters)

- Depth of dredging: up to 4 meters

- Distance of sand dredging: maximum 3 kilometers

- Estimated sand volume: approximately 2,340,000 cubic meters

*Financial Projections:*

- Estimated return on investment: ₦1.17 trillion (conservative estimate of ₦2 million per square meter)

- Investment:
- Dredging costs: approximately ₦58.5 billion
- Payment to Federal Ministry of Housing: ₦5 billion
- Total investment: ₦63.5 billion

- Return on investment: 40% of total project revenue (₦468 billion minimum)

*Terms:*

- Joint venture partnership between investors, stakeholders, and government agencies

- 40% share of project revenue for investors and stakeholders

- Funding secured from off-taker, no investor funds required

*Opportunity:*

This project offers a lucrative investment opportunity with significant returns, backed by thorough preparation and documentation. We look forward to discussing the details with interested parties.
........,.............,...........,.......

LIKELY QUESTIONS ASK BY AN INTERNATIONAL INVESTORS
What they want to take(Let define it from the onset)
Who is paying us
We don’t want land
We want payment &
Let get right rate per cubic from their calculation on that 2slot and can we get more
because that is not effort to bring them down to Nija
We work with expatriate and they earns in USD(dollar)
And no defer payment
So can we be mobilized
Immediately we move equipment to site
...,.....................,.................

To answer the question one after another.

1. What they want to take?(Let define it from the onset).
Answer: the company that own will two slots will take 30% of the 468 billion Naira.

2. Who is paying us?.
Answer: The office takers pays to you directly as soon you start something there.

3. We don’t want land!
Answer: That's fine there is lots of takers on ground we are talking about an independent Island such as Banana Island.

4. We want payment &
Let get right rate per cubic?
Answer: It depends on you, but for our calculations we are projecting 20,000 to Naira 25,000 per cubic.

5. from their calculation on that 2slot and can we get more!
Answer: The companies take 30% you and the Investors have the remaining funds.

6. because that is not effort to bring them down to Nija

We work with expatriate and they earns in USD(dollar)
And no defer payment
So can we be mobilized
Immediately we move equipment to site?

Answer: The off takes are on unground so once you something you will start getting pay by then.

This deal is Joint venture
Reclaim the island and 40%

This is an independent Island just like Banana Island

For diether inquiry call o Whatsapp

081-66244710, 08085998064
Engr. Joseph Abe
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 9:02am On Nov 10, 2025
Happy New week, do have a wise investment decision.

081-66244710
Engr. Joseph Abe
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 7:40pm On Nov 08, 2025
Happy weekend,

Urgent: Stock Pile Dredging Job in Lagos

We are pleased to announce a private dredging job in Lagos with with a pumping distance of less than 500 meters. The job involves dredging and stock pile, and we invite interested clients to participate.

*Equipment Requirements:*
Any size dredging machine is acceptable, including:
8"-10" dredgers
12"-14" dredgers
Jagaban dredgers

*Contract Details:*
Contract starts from 500,000 cubic meters (revolving)

*How to Participate:*
Interested clients should submit a letter of interest immediately, as the offer is available on a limited basis.

Contact us to express your interest and discuss further details.

We look forward to working with you.

The job is available now, and we encourage interested parties to act quickly

Thanks

For any inquiry, kindly Whatsapp 081-66244710

Engr Abe Joseph
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 7:37pm On Nov 08, 2025
Happy sun rise,

Urgent: Stock Pile Dredging Job in Lagos

We are pleased to announce a private dredging job in Lagos with with a pumping distance of less than 500 meters. The job involves dredging and stock pile, and we invite interested clients to participate.

*Equipment Requirements:*
Any size dredging machine is acceptable, including:
8"-10" dredgers
12"-14" dredgers
Jagaban dredgers

*Contract Details:*
Contract starts from 500,000 cubic meters (revolving)

*How to Participate:*
Interested clients should submit a letter of interest immediately, as the offer is available on a limited basis.

Contact us to express your interest and discuss further details.

We look forward to working with you.

The job is available now, and we encourage interested parties to act quickly

Thanks

For fu there inquiry, kindly Whatsapp

081-66244710
Engr. Abe Joseph
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 6:11am On Nov 07, 2025
Happy sun rise to you all,
As the year comes to an end, as a good investor, this is the time to think of profitable and secure investment to invest in. Dredging of sand ,Pump and sell remains a global secure physical business you should consider because, sand is a construction Mable material oh high demand through out the year that investors does not run out of souce of materials or run off buyers and suppy .
We have the experience, we have the water front site with bank of sand and in highly demand of sand and suppoy both for road contractions demand, individual supplies and private Investors and builders that will buy sand from your site.

For your interest and start up , kindly call: Engr ABE JOSEPH 081-66244710, 080-85998064

Do have a wise investment decisions
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 1:05pm On Nov 04, 2025
A brief introduction to the Ikoyi Island Reclamation Dredging Project:

*Project Name:* Ikoyi Island Reclamation Dredging Project

*Project Overview:*

We invite investors to participate in a joint venture for the Ikoyi Island Reclamation Dredging Project, a collaboration between investors, stakeholders, and the Federal and State Governments. The project involves reclaiming 240 hectares of land, with 60 hectares allocated to this joint venture.

*Key Highlights:*

- Total area: 240 hectares (8 slots of 30 hectares each)
- Joint venture portion: 60 hectares (900 plots of land, approximately 585,000 square meters)
- Depth of dredging: up to 4 meters
- Distance of sand dredging: maximum 3 kilometers
- Estimated sand volume: approximately 2,340,000 cubic meters

*Financial Projections:*

- Estimated return on investment: ₦1.17 trillion (conservative estimate of ₦2 million per square meter)
- Investment:
- Dredging costs: approximately ₦58.5 billion
- Payment to Federal Ministry of Housing: ₦5 billion
- Total investment: ₦63.5 billion
- Return on investment: 40% of total project revenue (₦468 billion minimum)

*Terms:*

- Joint venture partnership between investors, stakeholders, and government agencies
- 40% share of project revenue for investors and stakeholders
- Funding secured from off-taker, no investor funds required

*Opportunity:*

This project offers a lucrative investment opportunity with significant returns, backed by thorough preparation and documentation. We look forward to discussing the details with interested parties.

Call Engr. Joseph Abe
081-66244710
080-85998064

1 2 3 4 5 6 7 8 9 10 (of 26 pages)