₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,057 members, 8,448,451 topics. Date: Monday, 20 July 2026 at 11:15 AM

Toggle theme

Dredgerbuilders's Posts

Nairaland ForumDredgerbuilders's ProfileDredgerbuilders's Posts

1 2 3 4 5 6 7 8 9 10 (of 26 pages)

PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 4:29pm On Sep 09, 2025
UPDATE ON The ongoing coastal road project in Nigeria is the Lagos-Calabar Coastal Highway, a 700 km road that will traverse nine states along the country's shoreline, connecting Lagos to Cross River State. Here's what we know about the project so far ¹ ²:

- *Project Overview*: The highway will include two spurs leading to Northern Nigeria, enhancing connectivity and trade between the north and south. It will also feature a train track in the middle and be built using concrete pavement.

- *Phases*: The project is being implemented in phases, with the first phase covering a 47.47 km dual carriageway from Victoria Island to Lekki Deep Seaport, costing N1.067 trillion. The second phase will cover another 57 km from Lekki Deep Seaport to the boundary between Ogun and Lagos states.

- *Contractor*: Hitech Construction Company Limited has been awarded the contract, and they've made significant progress, completing 1.3 km of the required filling.

- *Expected Completion Time*: The project is expected to take eight years to complete and will cost approximately $3.2 million per kilometer.

- *Benefits*: The highway is expected to revolutionize transportation in Nigeria, boost tourism, increase economic opportunities, and provide direct employment for thousands of people. It will also enhance connectivity between states, facilitating trade and commerce.

- *Challenges*: Some concerns have been raised about the project's impact on the environment and local communities, particularly regarding land reclamation and potential displacement of people.

- *Funding*: The Federal Government is seeking funding from the African Development Bank (AfDB) for the project, and the bank has expressed willingness to provide both financial and technical support ³ ⁴ ².
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 5:55pm On Sep 08, 2025
Fear investors,
Opportunity to partner with our 14/12 suction dredger and water front with material to dredge and supply Hi-Tech for ongoing road construction project running from Lagos to Calabar -Nigeria is still available to individual investors.

This is a small scall business that gives about $800,000 monthly .

Also any investorwith Dewsger and dry plant has opportunity of my Land to dresge and atockboile sand to offtakers .
Thanks for your interest doing business with us .

Engr. Abe Joseph
081-66244710 Whatsapp
080-85998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 5:38pm On Sep 08, 2025
Opportunity to partner with our 14/12 suction dredger and water front with material to dredge and supply Hi-Tech for ongoing road construction project running from Lagos to Calabar is still available to individual investors.

Also any investorwith Dewsger and dry plant has opportunity of my Land to dresge and atockboile sand to offtakers .
Thanks for your interest doing business with us .

Engr. Abe Joseph
081-66244710 Whatsapp
080-85998064
PropertiesRe: Joint Ventures In Lagoon Dredging Business by dredgerbuilders(op): 6:15am On Sep 05, 2025
Dear investor, Do you mind to come in and partner with our 14/12 suction DREDGER to do Dredging and stock pilling of dand for supply this ongoing Lagos to Calabar coaster road project .

if yes, we should mobilize to site site by next week then because :

* Site is available at lbeju Lekki around Dangote refinery where we have sand in the river and enough off takers of our

* Offtakerd available

* Dredger is available

* Only #40 remains to mobilize equipment to site andother #40m for operation and logistic

The very point is that if the dredger is mibilized to site snd we start dredging, hitech contractors and other Sand offtskers are ready to make upfront deposits to book for the sand. .

If we have an understanding, it's a good landing to have a good starting

I believe a team work is better.

Every other person can expand individually in no time if there is a strong base of regular income which will serve a source of regular feader financing.

Because l have already signed an MOU with the Dredger all is needed now is mob/Demob

If you are interested and can partner with us with #80m , get back to discuss terms .

I believe in team work

Thank you.

Engr. Joseph Abe
081-66244710 Whatsapp
08085998064
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 4:08pm On Sep 03, 2025
Have a nice day
PropertiesRe: What You Benefit When We Manage Your Dredgers by dredgerbuilders(op): 5:39pm On Aug 31, 2025
Happy Sunday
PropertiesRe: What You Benefit When We Manage Your Dredgers by dredgerbuilders(op): 8:33pm On Aug 30, 2025
Do you mind to come in and partner with our 14/12 suction DREDGER .

if yes, we should mobilize to site site by next week then because :

* Site is available at Lekki town where we have sand in the river and enough off takers of our

* Offtakwea available

* Dredger is available

* Dieale is available

* Only #40 remains to mobilize equipment to site and other logistic

The very point is that if the dredger is mibilized to site other funds already in process will come in .

If we have an understanding, it's a good landing to have a good starting

I believe a team work is better.

Every other person can expand individually in no time if there is a strong base of regular income which will serve a source of regular feader financing.

Because l have already signed an MOU with the Dredger all is needed now is mob/Demob

If you are interested and can partner with us with #40m , get back to discuss terms .

I believe in team work

Thank you.

Engr. Abe Joseph
08166244710
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 2:53pm On Aug 29, 2025
Do have a great weekend
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 2:24pm On Aug 28, 2025
Dear Investors,

ESTIMATE INCOME ON PARTNERING WITH OUR DREDGER WITH HIGHTECH SAND DREDGING FOR COASTER ROAD PROJECT.

Do you have anyone with #80m to invest into dredging.

I have a 14/12 suction dredger in my Care which be allowed for sand dredging on Joint venture .

One of most important thing is Demob of #10,000 which must be dropped down to dredge owner to mob his DREDGER if we do not perform

Also #10,00,00 mobing the DREDGER from present location with Crain to load on lowbed and hiyab to transport the dredger to operation site
Total #20m

About #20,000 for site preparation stock pulling of sand for bond wall area before sand off taking for sales

Other #30,000,000 will be used the buy Diesel, excavator and payloader to sell sand.

I have Hi-Tech contractors ready to drop #100,000,000 upon siting sand hip up on the site .

The Dredging site is at most lucrative place with ibeju Lekki close to coaster road pick up sand for road construction by other suppliers and contractors

The DREDGER can produce 200 cubic per hour x 10hrs = 2,000 cubic per day / by 15tons truck = 133 trucks
+- 100trucka #80,000 per truck = #8,000,000 gross income per day.

And = #160,000,000 monthly

There is no way after all running cost there is not going to be 50% of the income available to be shared by partners.

This worth investing in Man.

Call 081-66244710,
08085998064
ENGR Abe Joseph
Director
PropertiesRe: Joint Ventures In Lagoon Dredging Business by dredgerbuilders(op): 7:43am On Aug 25, 2025
FOR TOP INVESTORS ONLY,

COST AND INCOME FOR DREDGING AND STOCK PILLING FOR 22/20 DREDGER

FIX COST:
* Yearly hire or 6plots =#10M

* Site clearing and Bond wall preparation before sales = #15,000,000
* G
* Crew Accomodations and office cabin /logistics = #3,000,000

DEDUCTABLE PRODUCTION COST:
* Monthly Hire of Excavator, payloader, Diesel and allowances for 26days stock pulling = #55,000,000

* DREDGER MONTHLY DIESLE CONSUMPTION: = 1,500lts X #1,200/let X 26days = #46,800,000
* D
* Monthly impress all equipment services = #1,500,000

TOTAL MONTHLY PRODUCTION COST = #55M + #46.8M + #1.5m = #103,300,000
Monthly running expenses
* DREDGER MONTHLY OUTPUT: is between 350 -500cb/hr

* Let peg 400cb/hr x 10hr = 4,000cb per day

* Selling rate is #5,000/ c by 4,000cb= #20,000,000 daily
* And #20,000,000 X 26days = #520,000,000 monthly gross income

Less Monthly production expenses = #520,000,000 - #103,300,000
Projected income = #416,700,000

Sharing formula of JV proposing :
* Dredger owner 60%= #250,020,000
* Sponsor 30% = #125,010,000
* All consultant and facilitators 10% = #41,670,000

Monthly logistics impress will be determined and reserved as will be agreed

For your interest and other clarifications
Whatsapp 08166244710

Engr. Abe Joseph
Consultant
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 7:13am On Aug 25, 2025
Good morning sirs,
Are you an investor, are you interested investing Sand dredging and selling business.

We are expert and consultant in Dredging and reclamation business

We help to secure contracts in different construction companies for your Job orders.
Do you have a DREDGER, excavator and oayloader , the Job order is sweet for a dredge owners or investor with fund to hire a good equipment.

A payable LPO from Hi-Tech construction company, Dredging and stick oilling to alignment of coaster road aarea for road project along coaster road from Lagos to Calabar is a project we have in our perms which we can collect for you in Lagos, Akwam ibom or Bayesa.

Let us know your interest, you will submit documents and we secure the deal for you.

Do chart me up on:
08166244710
. Abe Joseph
Partner consultants


Do have a great day.
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 9:44pm On Aug 22, 2025
COST AND INCOME FOR DREDGING AND STOCK PILLING FOR 22/20 DREDGER

FIX COST:
* Yearly hire or 6plots =#10M

* Site clearing and Bond wall preparation before sales = #15,000,000
* G
* Crew Accomodations and office cabin /logistics = #3,000,000

DEDUCTABLE PRODUCTION COST:
* Monthly Hire of Excavator, payloader, Diesel and allowances for 26days stock pulling = #55,000,000

* DREDGER MONTHLY DIESLE CONSUMPTION: = 1,500lts X #1,200/let X 26days = #46,800,000
* D
* Monthly impress all equipment services = #1,500,000

TOTAL MONTHLY PRODUCTION COST = #55M + #46.8M + #1.5m = #103,300,000
Monthly running expenses
* DREDGER MONTHLY OUTPUT: is between 350 -500cb/hr

* Let peg 400cb/hr x 10hr = 4,000cb per day

* Selling rate is #5,000/ c by 4,000cb= #20,000,000 daily
* And #20,000,000 X 26days = #520,000,000 monthly gross income

Less Monthly production expenses = #520,000,000 - #103,300,000
Projected income = #416,700,000

Sharing formula of JV proposing :
* Dredger owner 60%= #250,020,000
* Sponsor 30% = #125,010,000
* All consultant and facilitators 10% = #41,670,000

Monthly logistics impress will be determined and reserved as will be agreed

For more clearification , Whatsapp or call 08166244710
08085998084
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 9:37pm On Aug 19, 2025
I need an investor to partner and sponsor coaster road sand dredging running from Lagos to Calabar under Hi-Tech construction company Lagos .

Any interested investor should call

The consultant
Engr. Abe Joseph
081-66244710
080-85998064
More details of profit and lose proposal is sent below
PropertiesRe: Joint Ventures In Lagoon Dredging Business by dredgerbuilders(op): 9:18pm On Aug 15, 2025
Daer investors,

We have coaster road sand and contract you can I vest in, we presently have a dresger 22/20 available for joint venture which you can sponsor to dredging site to do the dredging with below income.

Kindly study below valuation cost and income with your partnership investment.

COST AND INCOME FOR DREDGING AND STOCK PILLING FOR 22/20 DREDGER

FIX COST:
* Yearly hire or 6plots =#10M

* Site clearing and Bond wall preparation before sales = #15,000,000
* G
* Crew Accomodations and office cabin /logistics = #3,000,000

DEDUCTABLE PRODUCTION COST:
* Monthly Hire of Excavator, payloader, Diesel and allowances for 26days stock pulling = #55,000,000

* DREDGER MONTHLY DIESLE CONSUMPTION: = 1,500lts X #1,200/let X 26days = #46,800,000
* D
* Monthly impress all equipment services = #1,500,000

TOTAL MONTHLY PRODUCTION COST = #55M + #46.8M + #1.5m = #103,300,000
Monthly running expenses
* DREDGER MONTHLY OUTPUT: is between 350 -500cb/hr

* Let peg 400cb/hr x 10hr = 4,000cb per day

* Selling rate is #5,000/ c by 4,000cb= #20,000,000 daily
* And #20,000,000 X 26days = #520,000,000 monthly gross income

Less Monthly production expenses = #520,000,000 - #103,300,000
Projected income = #416,700,000

Sharing formula of JV proposing :
* Dredger owner 60%= #250,020,000
* Sponsor 30% = #125,010,000
* All consultant and facilitators 10% = #41,670,000

Monthly logistics impress will be determined and reserved as will be agreed
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 7:41am On Aug 07, 2025
Happy new week,

Should you be interested in Dredging and stock pilling of sand or Sand pump and sell for coaster road construction project in : Lagos, Akwam ibom or Bayesa, kindly contact me on 08166244710, 080-85998064.

Direct Job order can be processed in your company name within few weeks , provided you meet the creterials.

Also Ready out Job order you can take over or partner with is available for you to just move your equipment to site after we sign MOU under one day.

For any other information or inquiry, call or Whatsapp me:

081-66244710
080-85998064
Engr. Abe Joseph
Consultant
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op):
Good day sir,

Bel You can benefit so much investing in the ongoing Lagos CALABA Costal road project.

If you should have access to required capital, you just join existing projects alignment and positioned your dredger under a new MOU without any stress , pump sand and start making huge done of money in kess than 30days.

You can inspect on any of our existing performing site in Ibeju Lekki. We still have space in our cadastral to accommodate you, what Hi-Tech needs is performance, volume sand productions, no room stranger's Iallocation.

If you have any strong financial capable client who can part witb the project on the to of #600m or has a good relationship with his bank on APG can still do the project with #300m.

The monthly income in this projects worth the consideration :
Daily Minimum target pumping rate of 5,000 cubic X 28days. X #7,000 Per cubic to investor monthly . = #980,000,000

The contract is a roll over of 1,000,000 cubic production milestone roll over = 1,000,000 X #7,000 = #7,000,000,000 (#7billion) income in a shortest time if you have more than a DREDGER on site or your capable DREDGER can do day and night.

DM Mee for more information on 08166244710
08085998064
08133056065

Attach below is break down of our contractor team to join the success moving train .
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 8:23pm On Jul 07, 2025
Good day investors,

If you have opportunity of racing an APG of up to #500m from your bank to sponsored DREDGER to assign site for coaster road project, you stand to make over #200m monthly in a roll over dredging contract.

Call engr. Joseph Abe for more information

08166244710, 08085998064
PropertiesRe: What You Benefit When We Manage Your Dredgers by dredgerbuilders(op): 8:04pm On Jun 21, 2025
LET US MANAGE YOUR DREDGER FOR CONSISTENCY INCOME

WE HAVE DREDGING CONTRACTS MD NEED DREDGERS TO MANAGE

A joint venture between your company and Excellent Glitt Global Limited:

Dear [Partner's Representative],

Proposal for Joint Venture: Dredging Contract with HI-TECH Construction Company Limited
We are excited to present a proposal for a joint venture between [Your Company Name] and Excellent Glitt Global Limited to secure a direct dredging contract with HI-TECH Construction Company Limited. This partnership will leverage our combined strengths to deliver high-quality services and ensure mutual benefits.

Contract Overview
- Client: HI-TECH Construction Company Limited
- Project Location: Lagos to Calabar
- Scope of Work: Dredging of sharp sand direct to the coaster highway and spreading of the sand
- Quantity Required: Average of 60,000 cubic meters per week, Minimum of 5,000 cubic meters per day
- Contract Price: N8,500 per cubic meter for Lagos area
- other states price may be different

Joint Venture Terms
-Your company and Excellent Glitt Global Limited will jointly undertake the project, with both companies' names reflected on the contract.
-You will provide a dredging machine (20" and above) positioned in Lagos for physical inspection.
- Commitment fee: N5,000,000 will be paid at the point of signing the MoU for proper facilitations.
- Payment terms: after 30 working days payment process will be initiated by HI-TECH Construction Company Limited with subsequent payments made monthly.

Revenue Sharing
- N500 per cubic meter will be allocated to the official who makes it possible
- N1,000 per cubic meter will be allocated to the party's that brings out the contract.
- Our Companies will receive N7,000 per cubic meter to execute the job.
- EXCELLENT GLITT GLOBAL LIMITED and the Facilitators will keep N1000 Naira.
- Your Company will 70% of the total Contract sum to work with
Materials and Equipment
- Dredging machine
- Excavator machine
- Bulldozer machine

Legal and Financial Arrangements
- A joint bank account will be established between the two companies with an irrevocable order.
- A proper agreement will be drafted and executed through a legal process, and the document will be lodged at the Federal High Court of Nigeria.

We believe this joint venture will be mutually beneficial and will enable us to deliver high-quality services to HI-TECH Construction Company Limited. We look forward to discussing this proposal in more detail and exploring how we can work together to ment success.

Please feel free to contact us if you require any additional information or clarification.

Thank you for considering this proposal.

Sincerely,
Engr. Joseph Abe
08166244710
08085998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 8:00pm On Jun 21, 2025
PROFITABLE INVESTMENT

DREDGING OF SAND FOR COASTER ROAD WORK IN LAGOS

A joint venture between your company and Excellent Glitt Global Limited:

Dear [Partner's Representative],

Proposal for Joint Venture: Dredging Contract with HI-TECH Construction Company Limited
We are excited to present a proposal for a joint venture between [Your Company Name] and Excellent Glitt Global Limited to secure a direct dredging contract with HI-TECH Construction Company Limited. This partnership will leverage our combined strengths to deliver high-quality services and ensure mutual benefits.

Contract Overview
- Client: HI-TECH Construction Company Limited
- Project Location: Lagos to Calabar
- Scope of Work: Dredging of sharp sand direct to the coaster highway and spreading of the sand
- Quantity Required: Average of 60,000 cubic meters per week, Minimum of 5,000 cubic meters per day
- Contract Price: N8,500 per cubic meter for Lagos area
- other states price may be different

Joint Venture Terms
-Your company and Excellent Glitt Global Limited will jointly undertake the project, with both companies' names reflected on the contract.
-You will provide a dredging machine (20" and above) positioned in Lagos for physical inspection.
- Commitment fee: N5,000,000 will be paid at the point of signing the MoU for proper facilitations.
- Payment terms: after 30 working days payment process will be initiated by HI-TECH Construction Company Limited with subsequent payments made monthly.

Revenue Sharing
- N500 per cubic meter will be allocated to the official who makes it possible
- N1,000 per cubic meter will be allocated to the party's that brings out the contract.
- Our Companies will receive N7,000 per cubic meter to execute the job.
- EXCELLENT GLITT GLOBAL LIMITED and the Facilitators will keep N1000 Naira.
- Your Company will 70% of the total Contract sum to work with
Materials and Equipment
- Dredging machine
- Excavator machine
- Bulldozer machine

Legal and Financial Arrangements
- A joint bank account will be established between the two companies with an irrevocable order.
- A proper agreement will be drafted and executed through a legal process, and the document will be lodged at the Federal High Court of Nigeria.

We believe this joint venture will be mutually beneficial and will enable us to deliver high-quality services to HI-TECH Construction Company Limited. We look forward to discussing this proposal in more detail and exploring how we can work together to ment success.

Please feel free to contact us if you require any additional information or clarification.

Thank you for considering this proposal.

Sincerely,
Enhr. Joseph Abe
08166244710
08085998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 6:21am On May 30, 2025
Dear investor,

Dredging supply with trucking supply order contract available

10 new trucks in Abuja right now also available for you to hire and do the supply.

* You will fuel them all to be mobilized to to Lagos
* We will get them safe packing space or garage after dsily work.
* You will about two weeks upfront payment to the office and you msnage the drivers with accomodations here under my company guide
* We give the trucks gas daily to your supplies
* We give the drivers privately a extral allowances saying after your daily target, we give yleach #5,000 on every extral supply you do, as this we ginger them to make targets daily and do extral supply to your advantage

Let me get you the contract first .

Send your company name.

There are two things sir to getting a contract.

A. Do you want the contract processed and award directly in you company name

B. Or You want to partner with an existing contract

Finally, Do you want to be buying the sand from dredging site, or you want to we should get you a dredging site to dredge and you pick your sand to supply and other contractors buy sand from your excess dredged too.

With above reply we get you started

It's our pleasure working with you as a team achieving target goal.

Do have a wise investment decision .

Remain blessed

Joseph Abe
Managing Consyltant Director
08166244710, 08085998064
A-Z Dredged Equipment investment ltd.
PropertiesRe: We Do Your Sand Search And Environmental Inpact Assessment (EIA) & Reports by dredgerbuilders(op): 6:20am On May 30, 2025
Dear investor,

Dredging supply with trucking supply order contract available

10 new trucks in Abuja right now also available for you to hire and do the supply.

* You will fuel them all to be mobilized to to Lagos
* We will get them safe packing space or garage after dsily work.
* You will about two weeks upfront payment to the office and you msnage the drivers with accomodations here under my company guide
* We give the trucks gas daily to your supplies
* We give the drivers privately a extral allowances saying after your daily target, we give yleach #5,000 on every extral supply you do, as this we ginger them to make targets daily and do extral supply to your advantage

Let me get you the contract first .

Send your company name.

There are two things sir to getting a contract.

A. Do you want the contract processed and award directly in you company name

B. Or You want to partner with an existing contract

Finally, Do you want to be buying the sand from dredging site, or you want to we should get you a dredging site to dredge and you pick your sand to supply and other contractors buy sand from your excess dredged too.

With above reply we get you started

It's our pleasure working with you as a team achieving target goal.

Do have a wise investment decision .

Remain blessed

Joseph Abe
Managing Consyltant Director
08166244710, 08085998064
A-Z Dredged Equipment investment ltd.
PropertiesRe: We Fabricate Dredgers, You Do Pump & Sell Business by dredgerbuilders(op): 6:18am On May 30, 2025
Dear investor,

Dredging supply with trucking supply order contract available

10 new trucks in Abuja right now also available for you to hire and do the supply.

* You will fuel them all to be mobilized to to Lagos
* We will get them safe packing space or garage after dsily work.
* You will about two weeks upfront payment to the office and you msnage the drivers with accomodations here under my company guide
* We give the trucks gas daily to your supplies
* We give the drivers privately a extral allowances saying after your daily target, we give yleach #5,000 on every extral supply you do, as this we ginger them to make targets daily and do extral supply to your advantage

Let me get you the contract first .

Send your company name.

There are two things sir to getting a contract.

A. Do you want the contract processed and award directly in you company name

B. Or You want to partner with an existing contract

Finally, Do you want to be buying the sand from dredging site, or you want to we should get you a dredging site to dredge and you pick your sand to supply and other contractors buy sand from your excess dredged too.

With above reply we get you started

It's our pleasure working with you as a team achieving target goal.

Do have a wise investment decision .

Remain blessed

Joseph Abe
Managing Consyltant Director
08166244710, 08085998064
A-Z Dredged Equipment investment ltd.
PropertiesRe: Joint Ventures In Lagoon Dredging Business by dredgerbuilders(op): 9:52pm On May 25, 2025
Dear sir,

REQUIREMENTS FOR OBTAINING COATER ROAD CONTRACT DIRECT LPO IN YOUR COMPANY NAME @ #6,000 PER CUBIC ON YIUR TABLE.

1. Letter of intent on your letter head to carry all your company informations
2. Pictures and video showing the external and internal of engines and pump , belts and pully internal environment if there are leakages etc to know if it meets HITECH standard
3. Drawing of MOU as to understanding of benefits
3. Payment of Commitment and processing fee of #5,000,000
4. Mobilization of dredger to nearest site for Hi-Tech officials to officially inspect of dredger quality before writing the LPO.
5. Monthly target of 350,000 cubic x #6,000 per cubic = #210,000,000

Equals #210,000,00 monthly gross income for investor

While Production. Cost is less than #100,000 monthly with start up capital of about #600m

Do have a wise investment decision

Shalom

Engr. Josep Abe
08166244710 Whatsapp
08085998064
PropertiesRe: Making Money In Dredging, A-z Of A New Site For Your Guid by dredgerbuilders(op): 9:09am On May 15, 2025
Dear investors,
Space for dredging opportunity is available for sand pump and sell
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 6:59am On May 14, 2025
Do have a wise investment decision.
PropertiesRe: Making Money In Dredging, A-z Of A New Site For Your Guid by dredgerbuilders(op): 9:21pm On May 01, 2025
This Contract is direct from Hi-Tech construction company
It comes out for Lagos side it comes out at N8,500
For Ondo side N 7,500.
Scope of work
You pump the sand to the coaster road and spread it with budocer.

Tools to work with
1) Dredger, size 18" 20" and above.
2) excavator
3) burdosa, to spread the sand
4) Another materials that will make your work easier.

The preparation you must have a side and the arrangements of the community done.

The Dredger must be physically inspected.

Production rate
Average 60,000 cubic per week.
Minimum of 5,000 per day.

SUB CONTRACTOR PRICE
For Lagos side
Sub Contractor N5,800 per Cubic.

Facilitators N200 Cubic

Bank APG 1% of the contract

This contact that bring it out N500

Bank charges and over seen N500.

For Ondo side have not been decided but the distance is shorter than the Lagos side

You are free to come for a physical meeting immediately.

Call for more details

Engr. Joseph Abe

08166244710
08085998064
PropertiesRe: Make #50m Monthly Dredge & Supply Coaster Road Construction by dredgerbuilders(op): 9:20pm On May 01, 2025
Dear investors,
DIRECT CONTRACT FROM HI-TECH for Coaster road sand stock pilling

This Contract is direct from Hi-Tech construction company
It comes out for Lagos side it comes out at N8,500
For Ondo side N 7,500.
Scope of work
You pump the sand to the coaster road and spread it with budocer.

Tools to work with
1) Dredger, size 18" 20" and above.
2) excavator
3) burdosa, to spread the sand
4) Another materials that will make your work easier.

The preparation you must have a side and the arrangements of the community done.

The Dredger must be physically inspected.

Production rate
Average 60,000 cubic per week.
Minimum of 5,000 per day.

SUB CONTRACTOR PRICE
For Lagos side
Sub Contractor N5,800 per Cubic.

Facilitators N200 Cubic

Bank APG 1% of the contract

This contact that bring it out N500

Bank charges and over seen N500.

For Ondo side have not been decided but the distance is shorter than the Lagos side

You are free to come for a physical meeting immediately.

Call 08166244710
08085998064

Fir more details

1 2 3 4 5 6 7 8 9 10 (of 26 pages)