Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empresstilda(f): 10:42am On Dec 02, 2021 |
mountmoriah: We sell iron rod.
8mm, 10mm, 12mm, 16mm, 20mm, 25mm & 32mm iron rod available for sale
Free delivery to Lagos, Ogun and Oyo
We accept payment on delivery. How much is 16 mm 1 ton? |
|
Properties › Re: Construction Of A Four Bedroom Duplex. Ipaja, Lagos by Empresstilda(f): 6:51am On Oct 18, 2020 |
haaa: @EMPRESSTILDA THIS IS NOT A MATTER OF BEEN PEANUT MONEY OR GOLD MONEY. SOME PEOPLE DO HAVE PRINCIPLE, AND TRANSPARENCY IS SOME BEST WAY TO GO ABOUT LIFE. PEANUTS OR NOT, SOME PEOPLE VALUE TRUST REGARDLESS OF THE PRICE. TO YOU THAT MIGHT BE PEANUT, BUT TO SOME PEOPLE, IT MIGHT BE WHAT THEY MAKE IN A WHOLE YEAR.
I WILL LIKE TO ASK YOU, WHAT DO YOU WANT TO MAKE ON WINDOWS WORTH 980K? SO MAKING 70K+ IS NOT ENOUGH ON JUST THE WINDOW? Dude. This has nothing to do with transparency. And yes 70k+ is peanuts for an engineer. It seems poverty has clouded your way of thinking, so you think 70k is a lot of money. You should make enquires , the least most engineers charge is 150k. The client is lucky to have some one charge him so little.  peace Please don't quote me. |
Properties › Re: Construction Of A Four Bedroom Duplex. Ipaja, Lagos by Empresstilda(f): 6:43am On Oct 18, 2020 |
haaa: WHAT YOU DESCRIBED HERE IS TOTALLY DIFFERENT FROM THIS SITUATION BASED ON MY SOURCE EVEN THOUGH MR. RAYMONDFIRSTBORN CLAIMED I AM ONE OF THE RELATIVES WHICH IS NOT TRUE. ANYWAY, WHAT YOU SAID HERE IS NOT THE SAME.
YOU GOT A QUOTATION AND YOU ADDED YOUR OWN GAIN. THAT IS BUSINESS, BUT AS AN ARCHITECT, DURING THE KITCHEN CABINET LEVEL, YOU WILL STILL GET YOUR OWN SUPERVISION FEE FROM THE CLIENT FOR SURE BECAUSE WHAT YOU SAID ADDING YOUR OWN GAIN IS A BUSINESS BEING THE THIRD PARTY THAT NEGIOTIATED THE CARBINETS PRICE. SO IT IS DIFFERENT.
LETS SAY YOUR CLIENT WANTS YOU TO GET HIM APPLIANCES FOR THE KITCHEN CARBINETS, AND YOU SENT INVOICE THAT THE ELECTRONICS GUY SIGNED, THAT SAYS A FRIDGE COST 4K HOOD 3K GAS COOKER 5K TRANSPORT 1K TOTAL IS 13K
AND YOU GET IT SENT TO YOUR CLIENT AND THEY PAY IT. LATER ON, YOUR CLIENT FIGURED FROM THE ELECTRONIC STORE THAT YOU ONLY PAY 10K AFTER THE ELECTRONIC GUY DEMANDED FOR ADDITIONAL MONEY. AND WHEN YOUR CLIENT ASK YOU WHAT HAPPENED, YOU SAID YOU ONLY PAID 10K AND TOOK 3K OFF AS YOUR OWN SUPERVISION FEE.
WHY NOT JUST SAY I NEGOTIATED VERY WELL WITH THE GUY AND I MAKE 3K OFF IT. WONT THAT BE CLEAR AND SIMPLE? ESPECIALLY IF YOU ALWAYS INCLUDE YOUR SUPERVISION MONEY ON EVERY STAGES THAT THE CLIENT IS USED TO SUCH FORMAT. WHAT DO YOU THINK YOUR CLIENT WILL THINK? You think you are talking to kids here. It seems you are newbie in the construction industry. If you don't Know how construction works , then start reading. Some of us have over 25years experience. I don't have to tell the client anything, let me explain to you. Furnitures , windows and doors installation is entirely different from other items of work in a building. Architects and engineers don't charge separate fees for these items of work. The profit / fees are always embedded in the materials cost. YOU DO NOT SEPARATE IT and write it under any separate column. Peace  |
Politics › Re: Osanebi Ossai Friday's House Flooded (Photos) by Empresstilda(f): 6:32am On Oct 18, 2020 |
Karma |
Politics › Re: EndSARS: No Unit Has Been Created To Replace SARS Yet - Police by Empresstilda(f): 6:31am On Oct 18, 2020 |
Patiently waiting for the outcome. |
Properties › Re: Construction Of A Four Bedroom Duplex. Ipaja, Lagos by Empresstilda(f): 4:20pm On Oct 16, 2020 |
Prudency045: What then is the essence of a separate supervision fee? It is most times between 5%-15% of the total amount spent on the project. Depending on what the client and engineer agree on. Your right@prudency045 , but in most of my small projects my clients usually want the percentage broken down into stages, could be the same in this case. Mr @haaa 70k+ is peanut to be arguing over. If I was the contractor I would have charged more. Who makes 70k+ from a project worth 1m+.  |
Properties › Re: Construction Of A Four Bedroom Duplex. Ipaja, Lagos by Empresstilda(f): 4:04pm On Oct 16, 2020 |
@haaa I don't see anything wrong with what raymondfirstborn did. I am an architect, this is business. Just last week a client asked for the quotation of a kitchen cabinet, I asked my furniture guy to give me an estimate for the job. When I got the Estimate from the furniture guy, I added my profit then I send the total cost to the client.  Mr @haaa that's business for you . The engineer doesn't need to indicate that his fees are included.  |
Technology Market › Re: Sold by Empresstilda(f): 2:01pm On Jun 10, 2020 |
Is it still available |
Celebrities › Re: Hushpuppi & Woodberry On Their Way To America: Kemi Olunloyo Shares More Details by Empresstilda(f): 1:52pm On Jun 10, 2020 |
Finally. |
Properties › Re: Estimate For 1-storey, 6 Flats Of 2 Bedroom (3 Flats Up And 3 Down) by Empresstilda(f): 6:26pm On May 10, 2020 |
Fulaniherdmens: What does this one know, Corel draw can be used for sketches. Can use "SolidFace" is a 2D/3D parametric historic constructive CAD modeler. I am a registered architect with Arcon. so I can spot a quack when I see one |
Properties › Re: Estimate For 1-storey, 6 Flats Of 2 Bedroom (3 Flats Up And 3 Down) by Empresstilda(f): 6:15pm On May 10, 2020 |
Fulaniherdmens: I may need to lay hands on ur survey plan so as to sketch a standard design for u with corel. corel draw only fraudsters use corel draw .scam |
Properties › Re: Estimate For 1-storey, 6 Flats Of 2 Bedroom (3 Flats Up And 3 Down) by Empresstilda(f): 6:08pm On May 10, 2020 |
Fulaniherdmens: Before u lay me off or discredit me, i estimated based on their was existing foundation on the site. Pls ignore my omission. 6000 Pcs of blocks would be for ground floor and first floor. incl 6incs. Block setting is their, maybe u were busy trying to discredit me. What i quoted for the man was not to extort but to guide in accessing appx meaningful materials for the construction work. If you are looking for a jab, i can give u, presently we are building a 15 storey in Ikate. we need men at site send ur cv to fostergp@protonmail.ch You sound lyk a quack |