Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 3:37pm On Feb 03, 2017 |
lintel still on going........
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 3:36pm On Feb 03, 2017 |
slowly but surely... we shall get there....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 7:22am On Feb 03, 2017 |
More pictures soon.... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:16pm On Feb 02, 2017 |
mufutau55: Oga Ihebrooke.... the Master of All Architects... where have you been? Hope you are Ok.
Hajji M. I guess is work...my architect is always busy ...... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:09am On Feb 02, 2017 |
more pictures from setting out of blocks...Our aim is to complete this work as soon as possible by God Grace...
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:07am On Feb 02, 2017 |
johnson232: Nice job op... did u use all the 20 tons of granite & sharp sand for the foundation? as well as the blocks? or u still have some left? thanks. We used more than 20 tons of granite and sharp sand for the foundation...For the block we used more than 1000 for the foundation because we double the wall at the back. Thanks |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:05am On Feb 02, 2017 |
We are almost there....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:04am On Feb 02, 2017 |
kopell: Very good nice design. Bold step, may almighty help you through good luck. Amen.... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:38pm On Feb 01, 2017 |
Cost of materials to be use for setting of blocks...
1. 9" Block @ 180 X 2000 = 360,000.000
2. Sharp sand @ 21,000 X 4 = 84,000.00
3. Water @ 7k X 2 = 14,000.00
4. Cement @ 2350 X 30 = 70, 0000.00
5. 6" Block @ 160 X 300 = 48, 000.00
7. Labour = 120,000.00
Total = 696,000.00
Total amount from foundation = N1,701,500.00 |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:25pm On Feb 01, 2017 |
Front view of the building....3d ....this is what we are trying to achieve at the end though we have done some modifications due to the size of the land....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:22pm On Feb 01, 2017 |
kopell: Welcome aboard, good job. If you don't mind, can you show us the 3D plan of the house? Will surely do that sir..... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:20am On Jan 31, 2017 |
Also, want to say a big THANK YOU to our amicable Engineers in property section Spyder, Abdulwastecx, Rotecch, Segcymoor, Segzy14, Skimanski, architect Ihebrooke ,ohh my able Chairman Hajji Mufutau and others too numerous to list here. Im very much inspired by your work as they have guided me in this project. thus saving me cost. I appreciate you all..... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:19am On Jan 31, 2017 |
work on going...... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:27pm On Jan 30, 2017 |
nico007: nice job watch out for my 5 bedrooms soon All the best my brother...God will surely open ways for you..... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:39pm On Jan 30, 2017 |
bebe2: Which area is dis,
Dat na proper dry land,
nice work Dry land indeed...land is very strong.... Thanks dear... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 7:45pm On Jan 30, 2017 |
More to follow.... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 1:53pm On Jan 30, 2017 |
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 1:46pm On Jan 30, 2017 |
more...
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 1:45pm On Jan 30, 2017 |
We give God the glory..... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 1:45pm On Jan 30, 2017 |
pictures....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 1:38pm On Jan 30, 2017 |
Preparation for German Floor.......
We bought addition Materials to supplement the ones we have on ground
1. Cement 25 bags @ 2350 = 58,750.00
2. Mixer = 15,000.00
3. Water @ 6k X 2 = 12,000.00
4. Labour = 25,000.00
5. Wood and Transport = 40,000.00
6. Misc = 2,000.00
Total = N152,000.00
Total Money spent so far from Foundation to German Floor = N 1,005,500 |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 11:26am On Jan 30, 2017 |
legendsmother: Following good work op u did not include d price of d rods 12mm rod cost N1,650.00 per length |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 11:23am On Jan 30, 2017 |
Cost of renting Rammer with labour = N15,000.000
Total amount spent so far =N 853,500.00 |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 11:20am On Jan 30, 2017 |
taking levels.....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 11:18am On Jan 30, 2017 |
more.........
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 11:17am On Jan 30, 2017 |
Hammering work continue.....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:41am On Jan 30, 2017*. Modified: 11:18am On Jan 30, 2017 |
We purchase Water at the rate of 6k per trip
Total number of Water tanker trip is 4 X N6,000 = N24,000.00
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:39am On Jan 30, 2017 |
20 tonnes of Laterite @ N19,000 X 5 = N95,000
Labour N5,000 X 5 = N 25,000
Total for Filling = N120,000.00 |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:36am On Jan 30, 2017 |
pictures.....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 10:28am On Jan 30, 2017 |
Foundation completed.... Filling with laterite begins.... |
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:33am On Jan 30, 2017 |
more....
|
Properties › Re: Construction Of Three Bedrooms Bungalow (with Pictures) by gateleo(op): 9:26am On Jan 30, 2017 |
Iron rod 12mm @ 1650 X 40 = 66,000
bidding wire = 2,500
Ring = 6,500
Workmanship = 10,000
total = 85,000
|