@Melahou, thank u very much. I will do as u have said because I need to be sure of the price before anything or maybe I will get the matrials myself then we talk about his workmanship. |
All house check this for me if the price I was given for wiering my 3bedroom is ok!! or any idea of each wire cost for now?? Blow is the pics of the estimate
|
I finaly comeplete my house plastring.. And it cost me 60bags in and out plus floor.. Thanks to all house who help me out in sharing good ideas with me.. |
Sorry there was a mistake in my emil I'd, it's (sani.sp.oo7@gmail.com) not sanni.sp.oo7 """, so kindly resend the mail to me.. |
Can I get ur all price list at: Sanni.sp.oo7@gmail.com |
Thanks for the replay+the wise ideas u have share with me, lolzz I won't give u any room oooo but sure GOD give you more than that, I will give you all the house lolzz.. Well when its time for the tiles work I will update you with the cost or price I was given so you can cross check it for me, nice to a friend with u sir |
Mr Ytechconst, I feel good reading ur post. I also need and idea like how much will it cost to tiles 3bedroom, I just want to know like how much can I bought for the tiles all rooms floor and toliet nd kichen walls, also will like to know the cost of plumbing .. Thank u sir |
Mr KolaShangOne, have been hopeing to read back from u on my last megs to u, well work have started on monday I will like to hear back frm u soon, thanks |
Ok sir, than after tiling I can do that finish of plumbing work, do u have any iday like how much it will cost to tails all the 3bed? Also cost to finish all the plumbing works? Ur idea makes me have more knowledge about build |
Yes u r right sir, I don't understand y people always manage cement on house that we want leave in or rent to human like us, because damaging or falling of house this days should've give some of us sense on how to build with strong and good materials.. Yes that's how narialand people does oo some don't even know about build but all they know is to just shard idea their not sure of, I use at list 50 to 60 or more from foundation to linted so how can someone use 50 bags for blockwork +plastring/floor I think the person is wasting his/her time because sand is what so call person is using to build with little cement in it, yes I remember @ Haj/mufutau. Yes that's y am getting as much as cement I can so everytin we be more solid, am going for gravel, I think is 15 heanpans but I can make then use 12 so it will be more solid so far it safe because if I buy dawn much bags of cement does labor may wnt to be acting smart @my back as u knw the labor of now r dys they sabi thief materials like kilode..so if I buy 20bags nd kept in d house store I will b the 1 to open d store 4 dem in d morning as am less busy 4 now I will b makin it up to d site by 7am wit my store key wit me so in my face they will take out ut d bags they ned to wrk later after day wrk is finish I will lock it myself wit my key in my pocket this hw I will b doing it till wrk is finish.. because cement na gold ds tym oo.. More questions? What will be nxt plan after plastering Can tails be don or fitting of the plumbing wc and others.. Thank |
@innie77, Good idea, I am thinking of buying 40 to 50 bags of cement then keep it in the store, y I hold my store key in my pocket open for them whenever they need as much bags of cement, I'm less busy for now, I will try and crate time and meet up with them in the morning to open up the store as list i'll av arrive at the site by 7am, so my materials will be more safe, if I even want buy 100 bags of cement by then I can buy it so far I got my store key with me.. for the labor price I got different type of price from others even some is ready to do the job for me at the price of 140k but d reason y I want to give the job to the person with 150k his the one who start the job from the foundation to the stage it was now, he charge me 350k but when I check from others they also gave me price close to his first charge even some is more than his own but after we talk it over some agree to do the job it 150k and same at 140k, when have find out the price to plaster 3beds,4 toilet,living,dining,store,and kitchen is within 140k to 150k that's y I want to go for labor who start the job... The building is 45ft by 35.. I need more of ur idea |
@KolaShangOne, thank u very much for the idea and I will make sure work start tomorrow, but u think 60bags won't be enough to plaster in/out+floor of 3bed.. But some said even 50bags is too much that around 40 will be ok, but I want a perfect job, but I will buy 20bags at the start than later more bags so my materials will be more safe.. |
Good idea, I am thinking of buying 40 to 50 bags of cement then keep it in the store, y I hold my store key in my pocket open for them whenever they need as much bags of cement, I'm less busy for now, I will try and crate time and meet up with them in the morning to open up the store as list i'll av arrive at the site by 7am, so my materials will be more safe, if I even want buy 100 bags of cement by then I can buy it so far I got my store key with me.. for the labor price I got different type of price from others even some is ready to do the job for me at the price of 140k but d reason y I want to give the job to the person with 150k his the one who start the job from the foundation to the stage it was now, he charge me 350k but when I check from others they also gave me price close to his first charge even some is more than his own but after we talk it over some agree to do the job it 150k and same at 140k, when have find out the price to plaster 3beds,4 toilet,living,dining,store,and kitchen is within 140k to 150k that's y I want to go for labor who start the job... The building is 45ft by 35.. I need more of ur idea |
Happy weekend house, I will like to know how many bags of cement will be enough to plaster 3bedroom flat inside and outside+floor, labor charge 150k for the job is the price ok,+ 60bags of cement can someone help me in the house because I don't wanna get scam. |
Stil waiting to heard back from u, or let me have the price here |
Really but my emails is correct.. Well retry it again. sani.sp.oo7@gmail.com or truelssah2k@gmail.com |
Hello mr, what's the cost for the first handle and the last handle, and can I see more pic u can't reach me at sani.sp.oo7@gmail.com |
Can you help me in calculating this sq feet to POP sqm measurement... I will also like to know the cost for all. 1) 14ft x 13ft 5inch 2) 11ft x 7ft 3) 14ft x 4ft 4) 7ft 5inch x 3ft 5) 9ft 7inch x 6ft 4inch 6) 8ft 5inch x 4ft Need a good pop workers for my 3bad..reach me at sani.sp.oo7@gmail.com Thank |
Can someone help me in calculating this sq feet to POP sqm measurement... I will also like to know the cost for all. 1) 14ft x 13ft 5inch 2) 11ft x 7ft 3) 14ft x 4ft 4) 7ft 5inch x 3ft 5) 9ft 7inch x 6ft 4inch 6) 8ft 5inch x 4ft Need a good pop workers for my 3bad..reach me at sani.sp.oo7@gmail.com Thank |
Can someone help me in calculating this sq feet to POP sqm measurement... I will also like to know the cost for all. 1) 14ft x 13ft 5inch 2) 11ft x 7ft 3) 14ft x 4ft 4) 7ft 5inch x 3ft 5) 9ft 7inch x 6ft 4inch 6) 8ft 5inch x 4ft Need a good pop workers for my 3bad..reach me at sani.sp.oo7@gmail.com Thank |
Can someone help me in calculating this sq feet to POP sqm measurement... I will also like to know the cost for all. 1) 14ft x 13ft 5inch 2) 11ft x 7ft 3) 14ft x 4ft 4) 7ft 5inch x 3ft 5) 9ft 7inch x 6ft 4inch 6) 8ft 5inch x 4ft Thank. Also need good pop workers reach me at sani.sp.oo7@gmail.com.. |
Can someone help me in calculating this sq feet to POP sqm measurement... I will also like to know the cost for all. 1) 14ft x 13ft 5inch 2) 11ft x 7ft 3) 14ft x 4ft 4) 7ft 5inch x 3ft 5) 9ft 7inch x 6ft 4inch 6) 8ft 5inch x 4ft Thank. |
I need a good bathroom door with good price.. Write me @ sani.sp.oo7@gmail.com.. Thank u |
Good day here is the correst masurment of the window...let me have the cost of each 1600x1200 1500x1100 1200x1100 1200x1200 1200x1200 1200x1400 1200x1100 1200x700 900x900 600x600 4pec 4 toilet With Permanent net.. U can reply me back @ sani.sp.oo7@gmail.com or drop me message here |
@phemoluv02, Can u give birth to twice at the age of 19 lolzzz |
Mine is E-60,Z-70,M-83.. I don die nawa ooo una won make I turn grandpa b4 I get married.. At the age of 60 man go don dy need small small rest, at the age of 70 make I cross lag 4 inside my living room make I day eat the work way I don do dawn, at the age of 83 person don go rest 4 baba God place or make person don day use walking stick..lolzzzzz... Omo I go other for new SIM way start with 29 end with 30 I no won know how e b..
|
@Accurate, ;DLolzzz u're not serious man.. But know nobody above mistakes..but have correct myself man...thank8 4 letting me know my mistaks ![]() |
[b][/b[i][/i][color=#990000][/color]] My idea is maybe the dedu wife is what yoruba's call lakirebotoO who as no private part. don't mind my yoruba spilling oo.. Or Maybe during her runs days pu**y done spoil like well.. Or she lie to be vagin to her husband b4 they get married y her strong room don turn Konga. O boy cheat on her as much as u know but be careful of HIV oooo ![]() |
Just write u let me know if u got my mesg.. Thank u |
Can we talk throught email I will like to know how much will be charge for the work I mean the workmanship? |
Answer needed as fast as possible |