Stats: 3,038,363 members, 7,453,173 topics. Date: Tuesday, 06 June 2023 at 05:51 PM |
Nairaland Forum / Kaleam's Profile / Kaleam's Posts
(1) (2) (3) (4) (5) (6) (of 6 pages)
![]() |
Dozieson:Yes |
![]() |
alphabbey1: I bought N3500 fuel which was 21 litres, I used trip B to measure it on the odometer, it covered 108 miles which is 170km with the AC on. |
![]() |
Dozieson: I don't know much about it but one was attached to the silencer from inside the car under the front seat, and the other one in the engine, here's the scanning result. Inspection Result PGM-FI/Diesel(Engine System) 7 problems exist 1.06-02(P0118) ECT Sensor 1 Circuit High Input Current|PGM-FI 2.192-02(P2185) Engine Coolant Temperature (ECT) Sensor 2 Circuit High Voltage Current|PGM-FI 3.48-08(P2195) HO2S (A/F Sensor) S1 Signal Stuck Lean Current|PGM-FI 4.41-07(P0134) HO2S S1 Circuit No Activity Current|PGM-FI 5.06-02(P0118) ECT Sensor 1 Circuit High Input Temporary|PGM-FI 6.192-02(P2185) Engine Coolant Temperature (ECT) Sensor 2 Circuit High Voltage Temporary|PGM-FI 7.48-08(P2195) HO2S (A/F Sensor) S1 Signal Stuck Lean Temporary|PGM-FI SRS(Supplemental Inflatable Restraint System) 3 problems exist 1.F1-11 Driver's Airbag And/Or Driver's Seat Belt Tensioner And Seat Belt Buckle Tensioner Deployed Current|SRS 2.E2-11 Front Passenger's Airbag Does Not Deploy By SWS Operation Current|SRS 3.F4-11 Front Passenger's Side Airbag, Right Side Curtain Airbag, And/Or Front Passenger's Seat Belt Tensioner Deployed Current|SRS BCM(Body Electrical System) 1 problems exist 1.B1234 A Short In The Driver's Air Mix Control Motor Circuit Current|BODY ELECTRICAL Air Conditioning System 1 problems exist 1.B1234 A Short In The Driver's Air Mix Control Motor Circuit The following systems are OK: 1.AT(Automatic Transmission) 2.ABS(Anti-Lock Braking System) 3.SWS(Seat Weight Sensor) 4.Immobilizer |
![]() |
alphabbey1:The car was scanned yesterday, there were two faulty sensors, I changed them, everything is cool now 1 Like |
![]() |
kennyldelsu: Okay Sir |
![]() |
Kingdemu:will do that as well |
![]() |
okoroemeka: Okay Sir |
![]() |
Hello guys, I recently bought a Honda Accord 2005 ex (EOD) The car consumes 18 litres of fuel to cover a trip of 60km, is it normal with the type of car or I need to get it check? |
![]() |
tycoon3: First of all, sorry about it. Secondly, get a petroleum jelly (detol antibacterial skin jelly) put it in a container and put the container in the hot sun or hot water for it to melt. Add a car hydraulic and mix it, all it to cool down and use it anytime you wet your skin, don't ever leave your skin dry. Thirdly, drink plenty water daily. Fourthly, see a doctor because it might be early sign of 1 kidney failure, if it is, cure it before it affects the other kidney, I'm not trying to scare you but u shouldn't ignore it. Finally, don't be afraid and don't stress yourself over it, 4year ago, I developed the same symptoms, it was early stage of kidney failure, but as it was diagnosed early, I'm fine and well now. I'm wishing you speedy recovery. |
![]() |
More pictures
|
![]() |
More
|
![]() |
More pictures
|
![]() |
Pictures
|
![]() |
More pics
|
![]() |
Pics
|
![]() |
More
|
![]() |
More pics
|
![]() |
Pics
|
![]() |
*100 SELECTED PROJECTS, PROGRAMS AND ACHIEVEMENTS (AMONG OTHERS) ; ONGOING, COMPLETED OR COMMISSIONED BY GOVERNOR BALA MOHAMMED KAURAN BAUCHI’S ADMINISTRATION IN 2 YEARS* 1. Construction of Disina Road, Shira LGA. 2. Construction of new Dam in Bauchi state. 3. Construction of Dunkurmi Primary Health Care, Misau LGA. 4. Construction of New Hajj Camp in Bauchi. 5. Reconstruction of Ganjiwa Primary Health Care Centr, Dambam LGA. 6. Construction of New Palace of Baraza, Dass LGA. 7. Construction of New Palace of Bundott, Dass LGA. 8. Construction of Jajuwal-Ganye-Dakayal-Bakin Kogi Road. 9. Construction of Yalwan Duguri-Badaran Dutse Road. 10. Construction of Birin - Bajama – Kumbala Road. 11. Construction of Kundak – Wurmo - Burga Road. 12. Construction of Jalam Road, Dambam LGA. 13. Construction of Emergency and Infection Disease. 14. Construction of Bununu Road, Tafawa Balewa LGA. 15. Construction of Alkali Aminu - Bakaro - Kofar Dumi Road. 16. Construction of Ganjuwa/Jaja to Jahun Road. 17. Construction of Kasuwar Central to gidan sarkin Kasuwa, wunti Road. 18. Construction of Kasuwar Central to Karofin Madaki to Railway Road. 19. Construction of Prison- Shagari to Railway Road. 20. Construction of Bata to Anguwar Jaki Road. 21. Construction of Nasaru- Gwam- Balma road in Ningi 22. Construction of Sade – Akuyam Road, Darazo LGA 23. Construction of Warji- Gwaram road 24. Construction of Bogoro- Lusa road 25. Construction of GRA Azare – Old Kano Road, katagum LGA. 26. Construction of Malam Goje – Bakin Kura Road. 27. Construction of Bakin Kura – Muda Lawal Market Road. 28. Construction of Tapshin Road. 29. Construction of school in Nasarawan Dindima, Alkaleri LGA. 30. Construction of Gombe Abba- Kirfi road 31. Construction of Itas Gadau road. 32. Construction of Ibrahim Bako – Tirwun Road. 33. Construction of Hospital Road, Azare. 34. Construction of Tafawa Balewa Road. Azare 35. Dualization of Maiduguri- State University road 36. Dualization of Gombe road - Kangere Road. 37. Dualization of Airport road 38. Dualization of Sam Njoma road. 39. Renovation of Zadawa Primary Health Care Centre, Misau LGA. 40. Renovation of School of Nurse Bauchi. 41. Renovation of Palace of Zaki LGA. 42. Renovation of Palace of Katagum LGA. 43. Renovation of Palace of Warji LGA. 44. Renovation of Palace of Nabardo. 45. Renovation of Muda Lawal Market Road. 46. Renovation of Jama'are Road - Sule Katagum. 47. Renovation of Misau-udubo-Gamawa. 48. Renovation of Alkaleri Genaral Hospital. 49. Renovation of (girls) Special School Kafin Madaki, Ganjuwa LGA. 50. Introduction of Biometric Capture to Monitor Teaching Staff Attendance and Puntuality. 51. Lunching of Agricultural Policy Document. 52. Distribution of 251 Buses across Bauchi state. 53. Distribution of 1000 Keke Napep under KEEP program. 54. Electrification projects from Gabarin, Sade and Darazo LGA. 55. Electrification project in Misau LGA. 56. Electrification project in Katagum LGA. 57. Electrification project in Nasaru, Ningi LGA. 58. Electrification project in Takanda, Toro LGA. 59. Electrification project in Rimin Zayan. 60. Modernization/Renovation of Yakeri Primary School, Katagum LGA 61. Modernization/Renovation of Gabarin Comprehensive Primary Health Care Centre, Darazo LGA. 62. Construction/Upgrading of Maladu Ayuba Primary School Dagauda, Dambam LGA. 63. Construction of 20 mega blocks of store building, one in each of the twenty Local Government Areas, consisting of six classrooms, motorized boreholes and hand pumps in collaboration with the North East Development Commission. 64. Payment of Gratuity. 65. Reconstruction of elapsed blocks of Dindima Primary School. 66. Renovation of Babasidi Primary School. 67. Renovation of Jahun One (1) Primary School. 68. Renovation of Nasarawa Primary School. 69. Renovation of Dutsen Tanshi Primary School. 70. Renovation of Urban Primary Health Care Centre, Azare. 71. Renovation of Central Model School Mashema, Itas/Gadau LGA. 72. Renovation of Wuro Nagge Primary Health Care Centre, Giade LGA. 73. Construction of Model Primary School Duguri, Alkaleri LGA. 74. Construction of Maraban Ganye – Gwalpada Road, Toro LGA. 75. Renovation General Hospital, Toro LGA. 76. Renovation of Primary Health Care Centre Magama Gumau. 77. Renovation of Primary Health Care Centre, Nabardo. 78. Renovation of District Head Palace, Nabardo. 79. Renovation of Primary Health Care Centre, Tashan Durumi. 80. Elevation of water tank in Miri, Bauchi LGA. 81. Rehabilitation of Gubi Dam staff quarters. 82. Renovation of Bauchi State Sewerage Corporation (BSWSC) offices and replacement of 50km mains distribution and installation of bulk meters, Bauchi LGA. 83. Construction of 7000m3 elevated concrete reservoir at Buzaye hill, Bauchi LGA. 84. Construction of 500mm transmission main from Gubi Dam junction to reservoirs at Warinji hills. 85. Construction of Gubi Dam access Road Bauchi – Ganjuwa. 86. Establishment of Road Traffic Management Agency (BAROTA). 87. Renovation/Expansion of Bauchi State Government House. 88. Construction of Primary School at Nasarawan Dindima. 89. Implementation of Violence Against Persons Prohibition (VAPP) Law. 90. Distribution of 50 Patrol Vehicles to Security Agencies. 91. Construction of Road in Nassaru, Ningi LGA. 92. Construction of Arinja – Balma Road, Ningi LGA. 93. Renovation of Gadar Maiwa Primary Health Care Centre. 94. Renovation of Government Secondary School Zaki LGA. 95. Construction of Warji – Gwaram Road. 96. Construction of Bogoro – Lusa Road, Bogoro LGA. 97. Construction of Boi – Tapshin Road, Tafawa Balewa LGA. 98. Harmonization of Bauchi City Motor Parks And Shopping. 99. Donation of Jac Hilux to Vigilant groups and Anti-Social Vices Committee (‘Yan Comiti). 100. Distribution of six ambulance to some Primary Health Care Centers in Buachi state. ©KAURA MEDIA TEAM Cc; mynd44
|
![]() |
Covid19 is really afraid of Kogi's Gov Yahya Bello 8 Likes 1 Share |
![]() |
Freestainworld: Yes, things are just not good in this country. |
![]() |
https://www.ipetitions.com/petition/end-ASUU-nasu-strike As it is, most people think ASUU is making unnecessary demands and the Federal Govt. is try very hard to fraustrate ASUU, howwver, it's not, every part has it reasons, nevertheless, it's the courtry that bares the consequences as the students are the future of the country, any delay to the education sector is bad. Both FG and ASUU are not doing any good, as such, we have to call for a truce, we need both to settle at a middle point thereby proposing the following deal; The ASUU and NASU should accept IPPIS, however, the Federal Govt. should make modifications to IPPIS by creating a small secretariat in each university such that all university staffs can have easy access to IPPIS customer service for complaints, as well, the unnecessary deductions of salaries, irregularities and high tax should be put to hold and return to normal. Withheld salaries should as well be paid. Under good democracy and political leadership, the FG is supposed to increase the salaries of those registered on IPPIS to lure others but considering the economy, at least their salary should be as it is, to tax them more or deduct their final income is not helping at all. FG is fully aware; the ASUU & NASU will never accept deductions to there salary, while ASUU & NASU are also aware FG will not back down on IPPIS, so let all parties compromise for better Nigeria. kindly sign it in the following link https://www.ipetitions.com/petition/end-ASUU-nasu-strike 1 Like
|
![]() |
usah4:FG allows free movement in to Nigeria in the name of ECOWAS... very annoying |
![]() |
usah4: I'm also a fulani, we have cows but we have a ranch, we also have a farm, but these so called herds men drive their cows to peoples farms intentionally, mst of them are not even Nigerians, and they don't want peace, trouble is brewing right in their blood. |
![]() |
usah4:The 4% they are demanding is 1964 km² more than half the size of Lagos state. 1 Like |
![]() |
so 14.1km is long? keep deceiving your selves
![]() ![]() |
![]() |
Arrewa:this first two pics here are of Sabon Kaura constructed by Gov. Bala Muhammad of Bauchi, up there you also posted a flyover picture, Yobe does not have one yet, and the modes are quick to move it to front page without verifying it as well... una weldone #both of u |
![]() |
knowhowk:Exactly... This white people have problem, their intentions are clear, they mstly think of us as a second race of human! |
![]() |
Deception of the century! They will pretend to support it by accepting it for clinical trial, and later on, they will not only claim it's not effective but will also say it's dangerous to the human body. 1 Like |
![]() |
Some people would have been here shouting North North... |
![]() |
. |
![]() |
Maj196: That is why I asked you, how many people died in your own LGA in the last 30days and what is your LGA's population? my argument here is what is the normal death rate per specific population in Nigeria, (dumbass u said?) your parental upbringing is really great, you should use your head to see the reality instead of hating. |
(1) (2) (3) (4) (5) (6) (of 6 pages)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2023 Oluwaseun Osewa. All rights reserved. See How To Advertise. 136 |