Aluminum roof covering to be done soon. |
Cost Breakdown ==================================Roofing & Nogging=============================== Woods BUILDING ONE & TWO 2x2 @ 250--------------------320pieces------------------------80,000 2x3 @ 350--------------------300------------------------------105,000 2x4 @ 450---------------------350-----------------------------157,500 3x4 @ 880---------------------50------------------------------44,000 2x6 880---------------------25------------------------------22,000 1x12 1450--------------------35-----------------------------50,750 Facial board smoothing and cutting-------------------------------5250 Anciliaries Nails 3"-------------------2 Bags-------------------------------------10,000 4"--------------------3 Bags------------------------------------15,000 5"------1/4" of bags--------------------------------------------1700 Oja Igba------1600----4 Dozen-----------------------------------6400 Transport----------------------------------------------------------17,000 Omonile------------------------------------------------------------100,000 Area Boys----------------------------------------------------------10,000 Feeding/ drink--------------------------------------------------------9,000 Carpentar----------------------------------------------------------200,000 Bricklayer----------------------------------------------------------20,000 400 6" blocks and 5 bags of cement---------------------------------61,500 ================TOTAL========================= 915,100 ============================Shops Roofing and Nogging=============================== Spplimentary Woods for SHOPS 2x2 @ 250--------------------40pieces------------------------10,000 2x3 @ 350--------------------20------------------------------7,000 2x4 @ 450---------------------40-----------------------------18,000 1x12 1650---Plus smoothing and cutting --12---------------19,800 =============TOTAL=================================54,800=================== |
Shops Roofing and Nogging.
|
Roofing and Nogging completed.
|
More
|
More pics
|
Roofing of Building One and Two.
|
Roofing and Nogging We used Itara wood for all roofing, Ogborugboru ( Mighty Mighty ) wood for all nogging and Iroko wood for facial board. 2"x2"--------------------------Nogging 2"x3" -------------------------Purlin 2"x4" -------------------------Rafter, Struct and Tie beam 3"x4" -------------------------Wall plate 2"X6" -------------------------KingPost 1"x12" ------------------------Facial board
|
@ topsy23 . How and where in Lagos ( Ikeja Disco ) can one get the Pre-paid meter? I need one single phase meter. Thanks |
Oguledoen:The 7k per flat is the estimated Carpenter labour cost we paid for this project. Each flat is two bedroom, all materials including nails were bought by us. As I said in one of the previous posts, it's for lintels only (and few adjoining columns). We cast most of the columns before Lintel. |
Oguledoen:Budget ₦4,500 - ₦5,000 per 100 blocks For Lintel get quotation from Carpenters. Budget ₦ 5,000- ₦ 7,000 per Flat. |
Oguledoen:25K is for Lintel and associated columns done at time of casting the lintel. The Columns reinforcement Iron bars were done in piecemeal, we paid per amount of work done daily. A good guide to how much you pay Artisans ( Carpenters, Bricklayers, Iron bender etc ) is ₦3,000 per day work. Labourers ( Mallams ) ₦ 1500-₦2000 per day work. The amount of work to be done is often contentious. From my experience contract is better. Negotiate the amount of work to be done and the price before commencement |
nysot:========================MAIN EXPENSES=============================================== *********************************** WOOD ************************************* IX12" Board======== Batch-1---100-------@₦1,000 = 100,000.00---------Transport--6,000 Batch-2---150-------@₦1,000 = 150,000.00---------Transport-4,000 Batch-3----45-------@₦1,050 = 47,250.00----------Tansport (+Bamboo,2X3, 2X4)--4,000 Batch-4---40 -------@₦1050 = 42,000.00----------Transport--2500 Batch-5---3 ---------@₦1050 = 3150--------------Slicing+ Transport---350 2x3 ==== Batch-1-----150 x ₦300 =45,000.00 ====Batch-2-----15 X ₦300 = 4,500.00 ====Batch-3------7 x ₦300 = 2,100 2x4 =======---------10 x ₦450 = 4,500.00 Bamboo --------Batch-1--------200 x ₦200 = 40,000.00---------Transport----12,000 --------Batch-2--------100 X ₦200 = 20,000.00-----------Transport---5,000 --------Batch-3---------25 x ₦200 = 5,000.00 Carpentar Labour ----First Payment---- ₦50,000 ---Second Payment--₦40,000 ---Third Payment----₦15,000 ---Final Payment----₦15,000 %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% REBAR %%%%%%%%%%%%%%%%%%%%% 12mm Rebar----------3tons @ 112,000=======================336,000 ------------2tons @ 111,00=======================222,000 16mm Rebar----------15 (piece) @ ₦2250=====================33,750 8mm rebar------------30 (piece) @ ₦750=====================22,500 ---------Binding Wire--Four bundles-----@₦2500--------₦10,000 Iron Bender---------First Payment-----₦30,000 ---------Second Payment----₦10,000 ----------Final Payment----₦10,000 ################################ Electrical ##################################### 20mm Conduit Pipes ( 6.5 Bundles) @ ₦3000* -----19,000 25mm Conduit Pipe ( 1 Bundle) @ ₦3200---------3200 Coupler-------Two packet @₦ 800---------------1600 4 Way Box--------Three Packet @₦ 800----------2400 Gum--------------One Tin---------------------500* Elecrician -----First Payment----₦10,000 -----Final Payment-------₦10,000 *******************************************Sand & Granite****************************************** ---------Sharp sand========== Total Sand===290,000** ---------Granite 8 Trucks 0f-----15-Ton -----@ 65,000--------520,000 ======================OMONILE================================================== ------------------Omonile Family--------150,000 @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ CASTING @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ ------------Casting Labour---First Payment-----------30,000 -------------------------Vibrator------5,000 -------------------------Vibrator Operator-----------2,000 -------------------------Casting_Area Boys-----------5,000 ------------Casting Labour- Final Payment------------100,000 ==================================Ancillaries/Accessories===================================== Nail---(21/2",3" -------------12,500 + 5,000 (Stolen)Tonnado Nail (21/2" -----------300Binding Wire-------------------3500* Gate Metal Sheet---------------2,000 Gate wood----------------------2,800 Gate Labour--------------------2,000 Gate Chain---------------------500 Padlock------------------------750 Biscuit Wood and Slicing ------1500 Biscuit Bricklayer labour------1500 --------Second Biscuit------1000 ---Biscuit Cement (2 Bags)--3600 Rebar chain--------------------600 Plywood (6 pieces)* @ 1500-----9,000 1'' Nail--( Packet)------------400* 1'' Nail---1(1/2)--------------225 One 12'' wood for Decking Platform---Spacing and Slicing----1400 Transport----------------------400 Plastic Drum-------------------4,500 1'' Hoze-----------------------2,500 Decking Day --Area boys--------5,000 |
Oguledoen:For the first floor a total 4,700-5,000 9'' block were used. 4,500 Naira per 100 block charged as mason labour ( Bricklayer 3,000 Naira, Labourer--1,500 Naira ). For Lintel the Carpenter collected 25,000 Naira . For columns casting Bricklayer ( mason ) collects 4,000 Naira,------- Labourer ( Mallams ) 2,00-3,000 naira per day depending on amount of casting done. |
nysot:Ok |
I met Rahoof at his office on Friday, to buy a console from him, he sold me ps3 slim 320 GB and loaded twenty games free for me. He is a complete gentleman. The console is working perfectly. Rahoof keep it up. |
I have 500g superslim Ps3 for sale. The console is very new, It has been used to play Grand theft Auto and need for speed twice only. |
bigiyaro:I got a hacked slim ps3 on Friday from Rahoof. Thanks I want to sell my newly bought Ps3 superslim, any interested buyer please contact me. The console is very new, used to play Grand theft Auto and Need for speed unleash twice. |
agarawu23:The suspended slab or decking for the water tank ( top of left staircase only ) is sized for maximum of three tanks for building One and two for building Two, we intend to install two tanks for each building. There will be no tank on the kitchen decking , we decked the kitchen solely for fire outbreak protection. Kitchens being the most likely place building fire often occur. The kitchen suspended slabs would be roofed as if no decking were there. On the email, I have sent you PM through Nairaland . I will send you the detail and email address when we are connected. Please check your inbox. |
Building One plan
|
Roofing of the buildings would be done next year, God willing. |
More Pictures
|
More
|
Suspended Slab for Kitchens and water tanks.
|
More
|
Lintel
|
Block walls
|
Stage Three-------------------Setting out
|
fem30:The total granite bought was 8 trips of 15 tonnes tipper. I.e 8 X 15 tonnes = 120 tones. The estimated granite needed for the decking was 6 X 15 tonnes = 90 tones. We decided to buy 30 tonnes excess to be used later because price was less when buying more. After the decking we had more than 30 tonnes left. Note------- The so called 15 tones ford tippers are actually less than 15 tonnes . A supplier once confided in me that they are 14 tonnes if loaded fully at Quarry and delivered the way it was loaded. Many suppliers are cheat, they secretly off load part of what was loaded from Quarry and show you waybill of 15 tonnes. |
agarawu23:As I said earlier, I am a mechanical engineer practicing in another industry, building professionals on this forum can help. If you can follow and study more building projects on this forum you definitely get some ideas. You can e-mail me for all the detailed costs of this project, I will send you the notepad where I recorded all the expenditures. |
allen0000:We decked the two buildings together the same day. The total cost of decking is 2.8M, building One is twice the size ( surface area ) of building Two. Thus you estimate the cost of decking building One as 2/3 of the total cost. |
FastShipping: FastShipping:Building One------21.75M By 8.425M Building Two------15.775M By 4.975M Note. The dimensions were given in millimeter on the plan, I converted them to meter. |
-------------12,500 + 5,000 (Stolen)