PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:33am On Jan 21, 2019
saydfact:
Unfortunately your request was foundation and German Floor.... And that I have done.... (see below)

Except where stated, I've used standard parameters for my calculations.

Foundation (Materials)

9 inches Block - 510 pcs
Cement (concrete and block setting) - 31 bags
Granite - 30 tonnes (enough for German Floor)
Sharp sand - 3 tippers (enough for German Floor)

Workmanship for above.

Digging of foundation - 35k max
Bricklayers fees - 55k - 60k
Setting out - 20k (materials and labour)
Filling of foundation - to be estimated on site.

German Floor (thickness used is 100mm or 4 inches)

Materials Needed

Cement - 35 bags
1by12 somi wood - 12 pcs or buy 6 and slice into 2 each
2by4 - minimal for bracing
3 inches nail - 1k worth
Binding wire - 2k worth

Workmanship for above.

Bricklayer - 40k
Carpenter - 5k
Filling of foundation - negotiate on site or 2.5k per tipper

Find the cost of the materials in your area and add up for project cost.

Thanks for contacting me.... (file closed)

Goodluck...
Thank you, i have your whatsapp, lets see how we go. really appreciate this
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 3:46pm On Jan 20, 2019
Olassab:
Thanks really appreciate your help, please do go to too much trouble on my account, if you have total cost in mind for the foundation that will be fantastic.
If you also have headline figure for total completion of the building great. Please send me your whatsapp
thanks got the whatsapp
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 3:43pm On Jan 20, 2019
saydfact:
OK..... pls remind me during the week - I'll do it Monday or Tuesday..

Goodluck......
Thanks really appreciate your help, please do go to too much trouble on my account, if you have total cost in mind for the foundation that will be fantastic.
If you also have headline figure for total completion of the building great. Please send me your whatsapp
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 2:30pm On Jan 20, 2019
saydfact:
Morning..
I'm presently looking at your design and working around it.

You can comfortably have a 3 bedroom in that space, with a bigger kitchen and dining also..... The 3rd room would share toilet with visitors..

However, would you be willing to pay a little for the drafting and time to achieve that? I understand you've spent (perhaps a lot to get this design) but 1 extra room would solve a lot of problems in the future.

Whatever you decide.... I'll give you FOR FREE a breakdown of Materials needed for FOUNDATION and GERMAN FLOOR only..... Plus advice on cost of workmanship...... Goodluck.


Regards.......
My brother the issue is the plan has already been approved, any advice will be grand, although at the moment this will be okay ' I'll give you FOR FREE a breakdown of Materials needed for FOUNDATION and GERMAN FLOOR only..... Plus advice on cost of workmanship'

in hindsight i wish i had come here first before starting anything, i have never understood why each bedroom needs to have it's own bath and toilet. when i was growning up in Surulere we only had 1 toilet and bathroom and we never fought to use it, you just took your turn!!!
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:18pm On Jan 19, 2019
saydfact:
what do you mean by CONCRETING ? I'll work on your estimate over the weekend...... so help me God
very good question, i think it the german floor bit. everyyhing is static at moment, please where are you based? just realised these things should be taken outside, advise, costs etc. Amen
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 1:15pm On Jan 19, 2019
saydfact:
is there any reason why its a 2 bedroom and NOT 3
ALSO, is the site inclined (not rectangular)


why I'm asking - I also advice clients to build a minimum 3 bedroom flat EXCEPT there are other factors that wont allow..

Fund is NOT one of such factors....
Thanks, that is what the Architect recommended, i pushed for a 3 bed, he said it will not fit. it is basically half a plot, it is flat and there is another half plot behind(my brothers) and a building behind(it is family land) so access is needed to get to the back building so we will use left side, can't do right side (granny's grave is in the way)
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab:
saydfact:
here is free consultancy
email is paid consultancy

i'm OK with any.

lol....
Thanks here is the plan
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 11:08pm On Jan 18, 2019
saydfact:
Evening.... Thanks for the comment.
You would have to share the plan... That also is important.

Regards
Thanks can i post here or whatsapp or email you direct, really appreciate your reply
PropertiesRe: Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice by Olassab: 6:51pm On Jan 18, 2019
Great work, very detailed, please could you give me an estimate cost for foundation and concreting for a 2 bedroom bungalow, land is pretty much dry
thanks
PropertiesFoundation And Concrete Costs For 2 Bed Bungalow by Olassab(op): 3:56pm On Jan 16, 2019
Hi
please any info on costs for foundation and concreting for a 2 bedroom bungalow in ijebu ode. location is central so ground is normal
thanks

1 (of 1 pages)