Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 7:00am On Jul 25, 2015
LOW COST HOUSING COMES TO LEKKI AT LAST!!

Properties › Re: Great Land Deal For A Discerning Buyer And Investor At Lakowe, Ibeju Lekki+++++ by opalu: 7:42am On Jul 23, 2015
I love your graphic description
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op):
babaeko1:
Oga.


I have another question for you, after a decking slab is in place, lets assume that decking and staircase was casted on a Monday, when then block setting begin ?

If one is to have a pent covering a 3rd of the floor space on the second floor, how soon can the decking for the pent start after the decking for the first floor is casted, and when can the block setting for the pent floor also start ?



Thanks in advance.
Concrete achieves high degree of strength at 21 days.
It gains full strength at 28 days for ordinary portland cement.
However, in practical site work, you can start laying blocks on a suspended slab 3 days after casting with proper wetting. Provided there is adequate propping supports (bamboo or acrow props) beneath.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 7:07am On Jul 23, 2015
erico2k2:
nah I meant for one plot ie 100x50
Okay. I would have asked you to show me the secret oo
Art, Graphics & Video › Re: I Am Ibim Cookey Plz Rate My New Pencil Works by opalu: 7:04am On Jul 23, 2015
You are the best
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 7:39am On Jul 18, 2015
Compliments of the season to all our Muslims on Nairaland.com.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:21am On Jul 17, 2015
drealaz24:
may God continue to take u to higher places

I am inspired

Thanks
Thanks alot
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:18am On Jul 17, 2015
drealaz24:
Good morning, my ogas. I just acquired an acre of land in a "near virgin area". pls I will like to know the number of blocks needed to fence it round. each plot measures 60 by 120.
six feet high is ok.
and probably the number of cements
I am just trying to figure out d cost.
thanks
erico2k2:
get 6 inches block 2000, would do, that's what I used on mine.
2000 blocks for an acre? Was it an acre you fenced at 1.8m height?
I think he should make plan for 4000+ blocks there about.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 8:24am On Jul 16, 2015
money121:
@op nice job....
Thanks
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op):
DAYSTAR SHELTER LTD
Our company was established to establish timeless structures and infrastructures that outlast generations. We develop our housing estates as well as construct for individuals and corporate bodies. We don't just build homes, we build peace of mind!

WHY WE ARE FAR AHEAD-
1. PRODUCT
Apart from the fact that we offer Insured Buildings to our clients, in our projects, we use grade 30 concrete and on most of our sites we utilise Ready-mix prepared from the concrete yards and transported to site. The pouring is done through mechanised pumping technology. This assures us of greater quality and efficiency.
2. PEOPLE
Our company does not tell our people to be excellent, we simply engage excellent people. Built solely on integrity and expertise, we work with some of the best brains and hands in the industry. Heading the pack is one of the leading Structural Engineers in West Africa Engr Abraham Ayegba Opaluwa, the inventor of 'Opacoding' an innovation to determine and extend the lifespan of buildings and bridges.
3. PRICING
Our construction prices for delivering projects are the most competitive. So are the houses we develop. For instance in Lekki Phase 1, we sell a 4-Bedroom duplex for between N65M-N82M depending on the features. The same goes for N120m and below. In Ogidan part of Lekki, the same duplex that is sold for N50M we deliver at N33M with private swimming pool! We are already packaging the best project deals for Lagos Mainland, Abuja city and Port - Harcourt. Don't forget our buildings are executed with the same concrete that is used for solid bridges!
4. POLICIES
Our company has the most attractive company policies that protect our clients. First is that we now operate N100% Money Refund Policy. This means that if you are not satisfied with our service or product, you can walk up to us to ask for a refund of your money paid and it will be done. Of course since we know the authenticity of our lands and the quality that has gone into the construction so we have nothing to fear. Another policy to help take the risks off our esteemed clients is that our buildings are Insured with Zenith Insurance one of the biggest names in that sector. So our clients have nothing to worry about. Thirdly, we have a strong Mortgage Policy. Our buyers who require a very flexible payment spread can key into the mortgage via First Bank's FBN Mortgages or GTBank's Imperial Homes.
5. PLACES
Our estates are located at developed parts of the cities. We are not that company that sends families into undeveloped secluded and dangerous forests with the promise that development will reach it in next 10 years. If we do any estate in the forest, then we turn that place into a fully functional city before occupation.
Our ongoing and proposed projects are located in LAGOS: Lekki phase 1, Osapa London, Ogidan, Surulere, Gbagada, Banana Island, Amuwo-odofin and Isheri. ABUJA: Wuse, Maitama, Jabi and Life Camp.
We deliver micro - Estates and mega - Estates depending on land size but ALL our estates have great prestigious locations that you have ever dreamt of. Our lands are authentic with good titles.

No project is too small or too big for us to execute either as a private project or as an estate. For outright sale or for joint - venture. Give us a try!
www.daystarshelter.com
08039353747.
Km 46 Lekki-Epe Expressway Lagos

Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 12:12am On Jul 16, 2015
erico2k2:
thanks man.
Welcome
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:15am On Jul 15, 2015
sylvesu:
Bros Good morning oh. Thanks for sharing from your wealth of building experience. I am currently building a 4 bedroom duplex ( with attached 2 bedroom, a maid's room and vistor's room. I need some one to help validate boq prepared by my architect. Can you be of help. Regards
Okay. Do send to my email. But I will only be free by this coming weekend to tidy all my requests from fellow NLanders
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:12am On Jul 15, 2015
manwonder:
Hello OP, still expecting your mail on the estimates. Thanks.
Am so sorry I have been engrossed in other projects. I will send it soon
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:10am On Jul 15, 2015
erico2k2:
quick question what would be the required rod for suspended slab aka decking,16 mm or 12 mm?
Either can be used however the most common rod used for suspended slab is Y12.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 3:29am On Jul 12, 2015
snakebeat:
Cc: opalu Sir will reinforced concrete of 12mm rod placed on the four corners of a four bedroom bungalow without placing it on all the exterior wall joint be able to carry concrete fascia? Using a mix ratio of 1:2:4. Thanks.
I didn't quite get you. However it better to run a roof beam from which a concrete facial is anchored. It depends also on the dimensions of the buildings
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 9:10pm On Jul 09, 2015
babaeko1:
Thanks for your time answering our questions, I have some questions for you.

When building a block of flats with a canal at the back of the property, are there any measures that one can take to prevent flooding if there are issues with the canal in future. The plot is at the beginning of a road, so slightly slope on the high ground, so when filling the compound, the plan is to do the compound floor such that it slopes towards the rear which is where the canal is so that all waste can be disposed into the canal. Would a concrete floor be better or use interlocking stones ?

When casting a septic tank in the Lekki area, any precautions to be aware of ?

When is the best time to cast a gate ? At the end or it doesn't matter ?

When constructing a security man house, any precautions to take ?

When constructing a block of 6 flats on a single story, i.e. 3 flats per floor and a penthouse at the top in the middle of the building, is it advisable to have a tank incorporated into the top of the building or just have a tank tower. There's space constraints in the compound, the property is also supported by 52 pillars on the ground floor.

Thanks.
These are tough JAMB Questions. Lol

As for the compound, you need to determine the flood level at the peak flooding or overflow of the canal.
IF the water level is high to the point that it flows into the compound, then do a retaining wall (embankment) running along the perimeter of your Compound parallel to the Canal. Then fill the compound to a level that it will be above the worst flood level. The help of the retaining wall is to withstand the vertical water pressure from one side and the lateral earth pressure from the other side. This was the solution I have to Lekki Gardens phase 2 some 3 months ago.
Many people erroneously use blocks to hold back the flood.

Yes, slope the compound as you said. Better still you could slope it to a drain that takes water from compound to the Canal at least there will be fence along that embankment.
Yes use concrete floor except you have an excellent person who can mold and lay near perfect interlocking
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 8:53pm On Jul 09, 2015
joshua112:
good day opalu,please I would need your advice on this.i have a friend who wants to build a bungalow on a land at ibeju lekki although the area is a bit waterlogged but his land did not have water on it when I visited the site early this year infact its was sand sort off but I knw when rain falls there might be water there. pls what kind of foundation type do u advice for the bungalow.if its raft what height do u advice my friend to use for the raft foundation since its a bungalow
First check whether the site requires sand filling first before the foundation. As for what depth of foundation to will depend on careful site examination.
Since its bungalow, the foundation is not too critical though there are bungalows that experience faulty foundation.
If I see your architectural and the site pictures
I could tell you what foundation to use
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 1:37am On Jul 08, 2015
ADAMUdaCOWBOY:
Thank you so much. But please do you think working with pad foundation and tying the columns with a ground beam and also making the lintel to go round will also work?
Bros it depends on the rocky terrain. Anything I say without seeing the site or at least a picture will not be detailed enough.
tying the lintels round helps in adding robustness to the monolithic structure.
Politics › Re: El-Rufai Bans Beggars And Street Hawkers In Kaduna State by opalu: 4:46pm On Jul 07, 2015
RIP to the dead. Action Gov.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 4:17am On Jul 07, 2015
snakebeat:
Nice analysis sir.
Is blinding different from foundation footing? because most people lay foundation blocks on the blinding, without any foundation footing. Does this have any serious structural implication on the building? & what is the purpose of blinding? Since both blinding & footings are concrete?
Thanks.
Blinding is to give a horizontal working area and also to prevent a measure of seepage from the soil under the foundation. Weak concrete or strong mortar could be used.
But Foundation footing is a reinforced concrete that acts as part of the foundation. There are some sites that require footing while some do not.
The major aim of the footing is to spread the load along the foundation line. You know that in sec school physics, Pressure P = Force F ÷ Area A.
Therefore the Higher the area created by the Footing, the smaller the pressure.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 4:09am On Jul 07, 2015
erico2k2:
ofcos hands could be used.same way you drill bore hole. If the earth permits you. I know of a small machine that can drill up to 8 ft. U just need the drill bit plus xtension
8 feet is not deep enough though. And maybe it's because i haven't done any pile using hand except boreholes.
Politics › Re: Buhari Appoints Lawal Musa-Daura As SSS Director General by opalu: 4:34pm On Jul 02, 2015
That is a good move.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:39am On Jul 02, 2015
jejeman:
thanks the shoot out is 1ft both side the pillar is supposed to be at the Edge that is angle 90
2 options.
I advise you to break the slab at the angle 90 so that the rebar of the column for the upper floor could be anchored properly into the slab. Since its too far to crank from where the starter bars are to where you want it to be. Please when doing the breakage, make sure the formwork and props are still in place. If they have been removed, use some bamboos or acrow props to hold the slab edge tightly from under. The reason is that as the slab is being chiseled, it can cause unnecessary vibrations that may cause cracks later.
2nd option is for the column be relocated to where the starter bar is. It is not always compulsory for upper floor columns to be at the angle 90.

But all these are based on the structural drawing you are using.

I hope I understood your question.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 2:32am On Jul 02, 2015
erico2k2:
Would you require mechanical drills for these piles or is it done by hand?
Do they use hand to drill the piles? It's preferably done mechanically
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 4:02am On Jun 29, 2015
drealaz24:
kudos to the experts in the house. I seek your opinion on this;
whc one is better ( bear in mind size, value and potentials in terms of development)

-A quarter plot at Ibeju Lekki OR a two plot of land at Ifo (Ogun) (goes for the same amt)

secondly

-pls is it possible to build a three bedroom flat on a quarter plot of land.
People will always prefer 2 plots to quarter plot (not even half plot).
However you would have to check the rent of a 3 bedroom in that same part of Ibeju and 3 bedrooms in ifo . To make an appropriate comparison, write the rent of 1 unit of 3 bedroom in Ibeju on the left and write the rent of sum of 4 units of 3 bedrooms on the right.

It is generally believed that the Lekki corridor has prospects due to the Free Trade Zone but there is no area that cannot spring surprises in terms of prospects.

As for your question on 3 bedrooms on quarter plot. It is achievable. If you are using smaller room sizes. At worst you take 2 bedrooms upstairs instead of a bungalow
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 3:49am On Jun 29, 2015
kloser wrote: Please should one be worried if the compound i.e the play area and car park of a building gradually sinks and detaches from the main building but the building itself isnt sinking at all,note-the foundation of the building is piling
What it means is that the soil under the play area and car park was not properly compacted during construction.
Many builders focus more in compacting the building a area than the remaining part of the compound. This is wrong because when the compound is not well rammed, there will be voids underneath. And even if it's left bare or its laid with interlocking, by the time water starts finding it's way under, it will start settling and in the long run affect the building foundation.
So to correct this, you will have to fill the compound more and compact more. Remove the paving stones or concrete flooring whichever you did.
If the problem is due to the use of loamy or muddy filling material, then you have to remove them and use good filling sand. When compacting, sufficient water need to be released on the different layers so it can settle well.
Thanks. Hope this helps
Politics › Re: . by opalu: 2:51pm On Jun 28, 2015
A STANDARD HELIPAD CAN BE BUILT WITH N1.2 MILLION NAIRA!!!!

I have built 1 and designed another one. Both in Lagos.
It is a small rigid pavement.
The one I deigned was at the top of a high - rise. The GMD of the company that owns the Tower will use his chopper to escape traffic and land on the Helipad then enter his PENTFLOOR office.
Building it on the ground is even better and cheaper.

These new Spokespersons of PMB should have mentioned how much they are building that one to a boil unnecessary tension on the social media.
Their Amebo too much.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 5:11am On Jun 28, 2015
mixratio:
try your hands on good quantity survey texts. Try to familiarize yourself with standard dimensions of building materials eg length of rebar etc. The Internet also works wonders. op pls explain more. As for me I still dey find work
That was a good answer
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 3:30am On Jun 27, 2015
ADAMUdaCOWBOY:
Impressive thread. OP I want to build a bungalow on a rock, how do I go about it?
To build a house on a rock is a nice one.
I would have loved to see the picture of the site to advise properly. For now I can give you a skeletal advice.
However the type of foundation normally used is solid raft. That means you have virtually horizontal plains where will form the ground floor. Sure there will be some cuts and fills here and there (if possible).
Then you panel the ground floor using reinforced solid raft over rock. I will look for a picture of how this is achieved.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 3:21am On Jun 27, 2015
alchemist:
I just prepared a BOQ for a client and i noticed they used 1500mm for the dept of grd beam (raft foundation). The structural eng in my office said its too much that 900-1000 would hold the one storey building. The building is located along ajah expressway.

What is your take on this as have been trying to convince the client to actually save cost.
Bros I won't be able to condemn or advise against what my fellow Engr has done except I have all the details he worked with.
But I have built a single storey in Awoyaya and I used 1800mm depth.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 3:10am On Jun 27, 2015
Adewunmismith:
thanks for the response,i want to know the best pile foundation that can be used for structures in waterlogged areas like lekki,ajah.
The major characteristics of piles are the pile diameters, the pile depths and the pile groups. And we have two types of piles commonly used here. Driven piles and In situ piles.
The characteristics and the types are determined based on the kind of structure coming on the foundation and the nature of the soil.
I once did some piles at a riverside near Agbowa after Ikorodu. The piles were average depth of 30m. For a load that is like a single storey. But a Kilometre from this site has good soil that won't require piles for such a superstructure.
In a place like lekki, there are areas that a 6 storey will require 30m depth pile. Some sites will require far less depth. Some will require far more. So piles are not 1+1=2. You run the necessary tests and analysis.
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by opalu(op): 8:00pm On Jun 26, 2015
algorithmz:
Op what is the most cost effective means of correcting cracks in buildings also how is the flow of moisture in buildings corrected.
When there is a crack problem, the Structural Engineer is like a doctor that will diagnose the remote cause of the crack.
If it is a Structural crack it will be treated structurally by adding concrete element in the appropriate place (s). The treatment it will be given is consequent on the findings of the professional involved. So I cannot sit and give a gbogbonishe solution to all structural cracks.

For the rising damp issue, someone has answered that very well