₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,419 members, 8,421,876 topics. Date: Sunday, 07 June 2026 at 09:07 AM

Toggle theme

Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 - Politics - Nairaland

Nairaland ForumNairaland GeneralPoliticsSanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 (36721 Views)

1 2 3 4 5 6 Reply (Go Down)

Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by naptu2(op): 4:32pm On Jun 16, 2021
WE'LL DELIVER SIX-LANE IBEJU-LEKKI-EPE HIGHWAY PROJECT FIRST QUARTER 2022 - SANWO-OLU

…Governor, Cabinet Members Inspect Construction Work

Barring unanticipated event, the construction of 18.7-kilometre six-lane rigid pavement carriageway from Eleko Junction in Ibeju Lekki to Epe T-Junction in Lagos State will be completed and commissioned. This was the assurance from Governor Babajide Sanwo-Olu when he and members of the State Executive Council went on an on-the-spot assessment of the project, on Monday.

Sanwo-Olu was excited by the pace of work on the road, persuading the contractor handling the project to increase its momentum in order to push the progress to an encouraging level before the end of the year.

The Governor flagged off the first phase of the expansion on the Lekki-Epe Expressway last November, kick-starting the rehabilitation of the 40-year-old infrastructure. The second phase of the project, which will start later this year, stretches 26.7Km from Eleko Junction to Abraham Adesanya Junction in Eti-Osa axis.

At the time of the Governor’s inspection, the contractor had completed a stretch of 3km on the lane from Eleko Junction inward Epe, while the right-of-way for the entire project has been fully cleared.

After communicating the work progress to the Governor, representatives of the contractor led Sanwo-Olu and cabinet members on legwork for assessment of features on the completed stretch, including drainage channels, kerb and segregated lane for heavy-duty vehicles.

The Governor was optimistic the project would be delivered on record time, charging the contractor to scale up the pace of work.

He said: “This exercise is an on-the-spot assessment to view the status of the 18.7Km six-lane rigid pavement road construction we are doing from Eleko Junction to Epe. The contractor has been active on site in the last six months, and they have touched every part of the entire stretch. We are currently assessing the project from the 3km lane already completed. On either side are three lanes. Two lanes are for cars, while the last lane is for heavy-duty vehicles. There will be 1.5km pedestrian walkway on both sides.

“We are happy with the progress of the project, because the contractor works day and night. I believe the work is on track. Residents on this corridor are also happy with the level of work done. They are waiting on us to hand over this important infrastructure to them in earnest.

“The beauty of the work is that it has reduced the journey time, even as the road is still being constructed. There is no hindrance on the road; motorists have the right-of-way for free movement. Not until when we finish the entire construction, we would have the full benefit of this investment. We are happy with what we have seen and we believe that the contractor should be rounding off the work by end this year or first quarter next year.”

CAPTION:

PIX 1 L-R: Lagos State Governor, Mr. Babajide Sanwo-Olu (middle); his deputy, Dr. Obafemi Hamzat (second right); Special Adviser to the Governor on Works & Infrastructure, Mrs. Aramide Adeyoye with representatives of the contractor, Craneburg construction during an inspection of the ongoing rehabilitation and upgrading of the Lekki-Epe expressway (Eleko Junction to Epe T-Junction) on Monday, June 14, 2021.

PIX 2: Lagos State Governor, Mr. Babajide Sanwo-Olu flanked by his deputy, Dr. Obafemi Hamzat (right), and the State’s General Manager of New Towns Development Authority (NTDA), Mr. Aboyeji Olakunle, during an inspection of the ongoing rehabilitation and upgrading of the Lekki-Epe expressway (Eleko Junction to Epe T-Junction) on Monday, June 14, 2021.

PIX 3-5 : The ongoing rehabilitation and upgrading of the Lekki-Epe expressway (Eleko Junction to Epe T-Junction) inspected by Lagos State Governor, Mr. Babajide Sanwo-Olu and members of the State Executive Council on Monday, June 14, 2021.
https://www.facebook.com/story.php?story_fbid=4269519739735926&id=492378324116772

Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by naptu2(op): 4:32pm On Jun 16, 2021
First picture in this post = Picture 5.

Other pictures = The road will have a dedicated truck lane and set back for a future rail project in order to prevent the kind of problems that we have in Apapa (where trucks keep parking on the road).

Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by naptu2(op): 4:33pm On Jun 16, 2021
End

Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by wwwihy: 4:33pm On Jun 16, 2021
naptu2:
https://www.facebook.com/story.php?story_fbid=4269519739735926&id=492378324116772
The Best Governor in Nigeria Presently

God Bless Gov. Omoluabi Sanwo-Olu
God Bless Incoming President Bola Tinubu
God Bless President Buhari
God Bless Yorubaland
God Bless Federal Republic of Nigeria




God Punish PDP who hired Nigerien Miscreant that stole N205 billion under GEJ
God punish developers dot in the circle.
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Monogamy: 4:36pm On Jun 16, 2021
Talk and do governor...

We hope so

Meanwhile, I read some governors from one region are preparing to give their people Kerosene plus gas as dividends of democracy in 2023
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by longetivity(m): 4:37pm On Jun 16, 2021
Lagos lead Anambra follows
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by lastempero: 4:39pm On Jun 16, 2021
Lagos should better form their own country and leave this parasitic country behind ooo.
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Monogamy:
longetivity:
Lagos lead Anambra follows
Wrong.. probably Rivers, Akwa Ibom, Kano before even talking about Anambra
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by wwwihy: 4:40pm On Jun 16, 2021
[s]
longetivity:
Lagos lead Anambra follows
[/s]
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by wwwihy: 4:40pm On Jun 16, 2021
Monogamy:
[s]Wrong.. probably Rivers, Akwa Ibom, Lagos, Kano before even talking about Anambra
[/s]
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by longetivity(m): 4:40pm On Jun 16, 2021
Monogamy:
Wrong.. probably Rivers, Akwa Ibom, Lagos, Kano before even talking about Anambra
grin cheesy grin
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by chukslawrence(m): 4:41pm On Jun 16, 2021
Hand picked turns best governor. You just have to give it to all Lagos leaders
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by longetivity(m): 4:43pm On Jun 16, 2021
wwwihy:
m




God Punish PDP who hired Nigerien Miscreant that stole N205 billion under GEJ
keep qwayet Bubu and APC has stolen more than that in 6 years
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by FarahAideed: 4:43pm On Jun 16, 2021
Not possible at this point ..Just went all the way to Awoyaya to inspect a project and I don't see how that's going happen before 1st quarter next year ..if you give the road to Juliuy Berger I opine it will be delivered by e last 2nd qtr 2022 depending on how payments are released..Give it to hightech and they will deliver in last Qtr 2023 and still deliver total rubbish
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by longetivity(m): 4:44pm On Jun 16, 2021
chukslawrence:
My
ur whathuh
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by wwwihy: 4:45pm On Jun 16, 2021
Monogamy:
Talk and do governor...

We hope so

Meanwhile, I read some governors from one region are preparing to give their people Kerosene plus gas as dividends of democracy in 2023
the guy above me is from that region
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Monogamy: 4:46pm On Jun 16, 2021
FarahAideed:
Not possible at this point ..Just went all the way to Awoyaya to inspect a project and I don't see how that's going happen before 1st quarter next year ..if you give the road
Lagos state has been keeping up to their promises.

Why is the project not possible if most especially their is a political will?
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by IgweOfNnewi: 4:47pm On Jun 16, 2021
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Xscape047: 4:48pm On Jun 16, 2021
Yexxxo
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by FarahAideed: 4:49pm On Jun 16, 2021
Monogamy:
Lagos state has been keeping up to their promises.

Why is the project not possible if most especially their is a political will?
Well fixing that road will give life to Lagos and cut down cost of properties in early Lekki
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by IgweOfNnewi: 4:49pm On Jun 16, 2021
FarahAideed:
Not possible at this point ..Just went all the way to Awoyaya to inspect a project and I don't see how that's going happen before 1st quarter next year ..if you give the road to Juliuy Berger I opine it will be delivered by e last 2nd qtr 2022 depending on how payments are released..Give it to hightech and they will deliver in last Qtr 2023 and still deliver total rubbish
This is not imo Abia or inviable Ebonyi
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by money121(m): 4:49pm On Jun 16, 2021
Ok
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Monogamy: 4:50pm On Jun 16, 2021
FarahAideed:
Well fixing that road will give life to Lagos and cut down cost of properties in early Lekki
Anything to develop lagos more and attract investors is welcome
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Kizyte(m): 4:50pm On Jun 16, 2021
OK
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by gbolswag(m): 4:50pm On Jun 16, 2021
This governor is just working...proud of him
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by wwwihy: 4:51pm On Jun 16, 2021
gbolswag:
This governor is just working...proud of him
God Bless You Sir
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Officialhorlah(m): 4:51pm On Jun 16, 2021
This man is the most active governor across UAR grin

Damn trying
Kudos baba
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Coldshisha: 4:52pm On Jun 16, 2021
cool


Sanwo-Olu


.
Re: Sanwo-Olu: We Will Deliver 6-Lane Lekki-Epe Highway Project 1st Quarter 2022 by Layorec: 4:52pm On Jun 16, 2021
Oh wow
1 2 3 4 5 6 Reply

Sanwo-Olu: We Have Acquired 3 More Trains For The Blue Line Rail ProjectSanwo-Olu: We Elevate Bad Things About Our Country, Always CriticiseSanwo-Olu: We Won't Allow Fifth Columnists Undermine Security In Lagos234

Kaduna Speaker, Zailan Cries At The Burial Of Rilwanu Aminu Killed By BanditsWike’s Gamble On Rivers APC's Ministerial Slot - ThisdayStop Using My Name, Ex-Husband, Alison-Madueke Warns Diezani