| Re: Casa Ava: The Finishing by EgunMogaji2(op): 3:33pm On Aug 02, 2021 |
Front primary door installed.
|
| Re: Casa Ava: The Finishing by folmus: 5:30pm On Aug 02, 2021 |
EgunMogaji2:This door is beautiful. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 5:41pm On Aug 02, 2021 |
folmus:Thanks. |
| Re: Casa Ava: The Finishing by fabulous85: 5:46pm On Aug 02, 2021 |
You have to cover this beautiful door properly from the POP guys. They make a big mess. I don shout tire. |
| Re: Casa Ava: The Finishing by mufutau55(m): 5:51pm On Aug 02, 2021 |
fabulous85:And the bricklayer guys when they are dressing the doors; wipe any mistake when it is wet. Good point. Hajji M. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 6:35pm On Aug 02, 2021 |
fabulous85:This is keeping me up really. I've wrapped it in plastic and plan on using the carton that came with it for additional protection. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 6:36pm On Aug 02, 2021 |
mufutau55:Most certainly Sir. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 8:37pm On Aug 02, 2021 |
Protecting the primary front door and cleaning up after the masons. https://www.youtube.com/watch?v=k0oBcFZzM_w |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 8:54pm On Aug 02, 2021 |
Some of the POP materials onsite and ready for panel production.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 7:43pm On Aug 07, 2021*. Modified: 5:51am On Jun 03, 2025 |
Plastering is officially completed with the 29 window hoods. Next is POP. |
| Re: Casa Ava: The Finishing by Nobody: 7:48pm On Aug 07, 2021 |
EgunMogaji2:Everything's taking shape. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 8:38pm On Aug 07, 2021 |
theForth:Thank you very much. |
| Re: Casa Ava: The Finishing by folmus: 2:34am On Aug 08, 2021 |
EgunMogaji2:Coming out beautifully. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 4:21am On Aug 08, 2021 |
folmus:Thank you very much. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 1:47pm On Aug 08, 2021 |
Found a local source for my 16 custom interior doors.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 9:07pm On Aug 09, 2021 |
Home theater, before and hopefully after.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 9:08pm On Aug 09, 2021 |
POP men at work. These folks are the very definition of efficiency.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 12:14pm On Aug 10, 2021 |
POP Ongoing.
|
| Re: Casa Ava: The Finishing by Beframia: 9:29pm On Aug 10, 2021 |
It's coming out nicely. Thumbs up. EgunMogaji2: |
| Re: Casa Ava: The Finishing by Greenarrow01(m): 11:36pm On Aug 10, 2021 |
Baba egun Are you still going to use the electric stuff for the ceiling outside |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 12:31am On Aug 11, 2021 |
Beframia:Thanks. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 12:33am On Aug 11, 2021 |
Greenarrow01:I changed the plans to a stun gun internals. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 12:07pm On Aug 11, 2021*. Modified: 5:46am On Aug 12, 2021 |
The Blue Suite is completed ![]()
|
| Re: Casa Ava: The Finishing by twinskenny(m): 2:05pm On Aug 11, 2021 |
EgunMogaji2:straight and nice edges |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 2:43pm On Aug 11, 2021 |
twinskenny:Thanks Ejire. |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 5:45am On Aug 12, 2021 |
The Pink Suite completed.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 8:27pm On Aug 12, 2021 |
Home Office Completed.
|
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 10:59am On Aug 13, 2021 |
Master Bedroom In Progress.
|
| Re: Casa Ava: The Finishing by Nobody: 9:54am On Aug 14, 2021 |
EgunMogaji2:Is this the end product or a random pic |
| Re: Casa Ava: The Finishing by EgunMogaji2(op): 10:07am On Aug 14, 2021 |
theForth:Random pic where I got the design from. I have no doubt that it’ll turn out as great. Here’s the current status as of this AM.
|
| Re: Casa Ava: The Finishing by multikolour(m): 10:12am On Aug 14, 2021 |
EgunMogaji2:did you make use of board? |
| Re: Casa Ava: The Finishing by Foreigna2: 10:19am On Aug 14, 2021 |
EgunMogaji2:You can actually start a business along this line. Home fortification consulting and services. This is exactly how Halogen security started, like play. |