Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,167,000 members, 7,866,783 topics. Date: Friday, 21 June 2024 at 04:01 AM

Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction - Properties (17) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction (34612 Views)

New 4 Flats Construction -Ile Ife Osun State / 4 Bedroom Duplex With 2 Flats Construction - New Oko Oba / Building A 4 Flats Of 3 Bedroom House At Emene Enugu. Costs And Pictures. (2) (3) (4)

(1) (2) (3) ... (14) (15) (16) (17) (18) (19) (20) ... (25) (Reply) (Go Down)

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 11:05am On Sep 28, 2021
More work on the sanitary wares, changing some shower heads, and some taps.........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by fabulous85: 8:51am On Sep 29, 2021
spyder880:
More work on the sanitary wares, changing some shower heads, and some taps.........
pls how much is this shower mix?
Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:56am On Oct 02, 2021
fabulous85:
pls how much is this shower mix?

About N6,500

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 8:42am On Oct 02, 2021
We have started making all the final arrangements to buy and mount all the water tanks for this building, arrangements has also been concluded to run the underground waste piping system to the soakaway system. Going to the market later today.

Pictures later.

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by solostar1: 11:20am On Oct 02, 2021
spyder880:
We have started making all the final arrangements to buy and mount all the water tanks for this building, arrangements has also been concluded to run the underground waste piping system to the soakaway system. Going to the market later today.

Pictures later.

You are doing well... transparency is the soul of business.

keep it up.

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 1:24pm On Oct 02, 2021
solostar1:


You are doing well... transparency is the soul of business.

keep it up.

Thank you bro.

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 9:49am On Oct 03, 2021
Purchase and loading of water supply and waste pipes for our use in this building yesterday..........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 9:55am On Oct 03, 2021
Offloading pipes, water tanks, other plumbing materials in the site .............

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 9:59am On Oct 03, 2021
GP tank brand

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:38am On Oct 04, 2021
Painting starts in this house, ceilings, internal walls and stairwells will get our attention first.

More pictures later.

1 Like

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:43am On Oct 04, 2021
Piping and fitting positions for fence lights ongoing here........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:49am On Oct 04, 2021
Some kitchen electrical fittings completed, more work going on in many rooms............

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 10:29pm On Oct 04, 2021
Laying waste pipes, today.........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:59am On Oct 05, 2021
House painting starts, we're starting with the ceilings

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by erico2k2(m): 7:21am On Oct 05, 2021
spyder880:
House painting starts, we're starting with the ceilings
whats up with Pic 1, is that screeding and a design?
Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 9:51am On Oct 05, 2021
erico2k2:

whats up with Pic 1, is that screeding and a design?

It's a design.

1 Like 1 Share

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:27pm On Oct 07, 2021
Painting more ceilings.......

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:28pm On Oct 07, 2021
Plastering works on the front of the fence, today.......

And if you guys dont wash this gate clean of all cement, your wages for today will be used to repaint this gate cheesy

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:34pm On Oct 07, 2021
We have started doing the waste channel service chambers.

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by michlins(m): 7:21pm On Oct 07, 2021
spyder880:
Plastering works on the front of the fence, today.......

And if you guys dont wash this gate clean of all cement, your wages for today will be used to repaint this gate cheesy
ewee
Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 8:09pm On Oct 10, 2021
Our cabinets has now been fitted with handles, more pictures from this site by tomorrow.

3 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by Badgers14: 10:11pm On Oct 10, 2021
spyder880:
Our cabinets has now been fitted with handles, more pictures from this site by tomorrow.

Beautifully done!!.

1 Like

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:19pm On Oct 11, 2021
We bought more paints for our use in this house..........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:20pm On Oct 11, 2021
Some living rooms, and bedrooms now painted........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:23pm On Oct 11, 2021
Fitting lights, switches and sockets in all the rooms........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:26pm On Oct 11, 2021
Ready to fix more electrical switches in this flat........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:30pm On Oct 11, 2021
Fitting more lights.........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 6:33pm On Oct 11, 2021
Cabinets and handles..........

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by michlins(m): 6:59pm On Oct 11, 2021
spyder880:
Ready to fix more electrical switches in this flat........
thank you for making me a part of this project. This is beautiful

1 Like

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:36pm On Oct 11, 2021
michlins:
thank you for making me a part of this project. This is beautiful

Thank you for all you did, your work came out very nice.

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 7:37pm On Oct 11, 2021
By tomorrow, we will start washing out the inside of these flats............

2 Likes

Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(m): 9:48am On Oct 13, 2021
Plumbers are here now to connect these tanks, lay waste pipes and connect them to the soakaway system.

Painting still going on today

Electrical fittings also going on today

House washing also continues

More pictures later.

2 Likes

(1) (2) (3) ... (14) (15) (16) (17) (18) (19) (20) ... (25) (Reply)

3 Things To Do When Landlord Increases Your House Rent In Nigeria / Caption These Air Conditioned Houses. Pictures. / *

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.