Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,148,698 members, 7,802,059 topics. Date: Friday, 19 April 2024 at 08:32 AM

The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" - Properties (12) - Nairaland

Nairaland Forum / Nairaland / General / Properties / The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" (23318 Views)

The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms / The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)

(1) (2) (3) ... (9) (10) (11) (12) (13) (14) (15) (Reply) (Go Down)

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by dongc(m): 10:09am On Jun 30, 2022
Papichulostunne:


A very bad description.

Are you okay?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 6:40pm On Jun 30, 2022
Our work in the front of this house is moving on smoothly...........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 6:42pm On Jun 30, 2022
The new soakaway system, and the reinforcement..........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 6:46pm On Jun 30, 2022
View from the top.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 7:44am On Jul 06, 2022
Work updates from this project, we are working in the soakaway system, and completing the filling of the foundation of the shops.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 7:47am On Jul 06, 2022
Concrete cast of the DPC for the shops, buying more materials.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 7:48am On Jul 06, 2022
Soakaway middle beam done ..........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 7:50am On Jul 06, 2022
Shop walls...........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 8:13am On Jul 06, 2022
Walls growing higher.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 5:58am On Jul 07, 2022
Floor and wall tiles ongoing in the main building........

1 Like

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 6:04am On Jul 07, 2022
Kitchen floor, walls, bathroom walls............

1 Like

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:46pm On Jul 10, 2022
Inside and around the shops.........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:53pm On Jul 10, 2022
More....

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:56pm On Jul 10, 2022
Still more

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by dongc(m): 7:26pm On Jul 10, 2022
Please what is the smallest room...restroom? Packing store ?
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 12:55am On Jul 11, 2022
dongc:
Please what is the smallest room...restroom? Packing store ?

It's a small toilet for the use of both shop owners and their customers as they trade. We don't want anyone slipping into the compound on the excuse of looking for where to ease themselves.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by dongc(m): 11:24am On Jul 11, 2022
spyder880:


It's a small toilet for the use of both shop owners and their customers as they trade. We don't want anyone slipping into the compound on the excuse of looking for where to ease themselves.

Good idea...welldone

1 Like

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 11:44am On Jul 11, 2022
dongc:


Good idea...welldone

Thank you bro
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:29pm On Jul 11, 2022
Scaffolds off............

1 Like

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:52pm On Jul 11, 2022
.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 12:51pm On Jul 12, 2022
Decking updates on this shops and security house combo

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by KelvinCoaster(m): 1:43pm On Jul 12, 2022
spyder880:
Concrete cast of the DPC of this house has been completed.
The tagged photos seem like a different project bro!
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 6:40am On Jul 13, 2022
KelvinCoaster:

The tagged photos seem like a different project bro!

I have removed the pictures, thanks for pointing them out.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:06pm On Jul 16, 2022
Updates of our works from this site..........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:10pm On Jul 16, 2022
More.....

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:13pm On Jul 16, 2022
From the top of the shops...........

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 4:18pm On Jul 16, 2022
Inside the house, kitchens etc

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by rukyboy(m): 6:29pm On Jul 16, 2022
Well-done Engr.

Good evening.

I'm assuming you bought the tiles and doors for this project at onitsha.

Pls confirm

Thanks

1 Like

Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by rukyboy(m): 6:32pm On Jul 16, 2022
spyder880:
Floor and wall tiles ongoing in the main building........

Can you pls tell me how much you bought the white floor tiles (i assume for the parlor) and tiles with brown and gray streaks (for the rooms )per m2

And the 4 feet metal doors too.

Thanks
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by rukyboy(m): 6:38pm On Jul 16, 2022
spyder880:
Inside the house, kitchens etc

Is it OK if a kitchen counter top is constructed with wood and tiled at the top.
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 8:48pm On Jul 16, 2022
rukyboy:


Can you pls tell me how much you bought the white floor tiles (i assume for the parlor) and tiles with brown and gray streaks (for the rooms )per m2

And the 4 feet metal doors too.

Thanks

Tiles per sqm N4,200
Metal doors of 4 ft N45,000
Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(m): 9:06pm On Jul 16, 2022
rukyboy:


Is it OK if a kitchen counter top is constructed with wood and tiled at the top.

Yes, but it usually gives some problems. Wooden counter tops suffer from the effects of water spillage from foods, drinks and dishes, and from splashes from the kitchen sink. Overtime, the wood will.statt to decay and fail at some points.

I note that you mentioned if the wood is tiled at the top, this will prolong the life of the wooden counter top, but concrete still beats it. This is not to say I haven't constructed wooden counter tops. And I have had instances where I even assembled imported wooden kitchen cabinets before.

(1) (2) (3) ... (9) (10) (11) (12) (13) (14) (15) (Reply)

The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu / Another Fire Outbreak In Dosunmu, Lagos Island / Have You Ever Seen A Well-Built African House On CNN Or BBC?

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.