| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 10:25pm On Oct 28, 2022 |
rukyboy:Aluminium and plastic. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by redgem(f): 11:33pm On Oct 28, 2022 |
spyder880:Thanks for the response Sir...will see if I can get them here, they are beautiful.. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by Beframia: 1:43am On Oct 29, 2022 |
spyder880:Thumbs up! |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by FEGEITOK: 8:50am On Oct 29, 2022 |
spyder880:I watched a YouTube video; a guy was modifying the garage entrance by building a new concrete driveway and the local government sent someone to supervise the works down to the concrete mix. So why won't we have buildings collapsing here? |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by GloriousGbola: 9:06am On Oct 29, 2022 |
spyder880: FEGEITOK:spyder880 is talking about risk mitigation, imho. you ant to build a structure that will not collapse mitigants include but are not limited to: regulatory oversight/ supervision competent third party supervision competent/professional design competent/professional/honest workers developers who are not overly greedy/ corner cutting/ payment guoging. all of these should be ideally be in place, but any two should be able to see a project to a safe completion and stress free use. in the case of collapse , all mitigants have been bypassed. my car is roadworthy , not because of FRSC, but because i want to get from pt a to pt b without any delays. take a lack of integrity, lack of competence and mix in some greed and there will always be collapsed buildings building control unfortunately is simply about getting your permit to construct. talk with most of these guys one on one and you will find they are completely vacuous hustlers |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by FEGEITOK: 9:38am On Oct 29, 2022 |
GloriousGbola:You are right! He takes great pains to ensure that his buildings do not have such an issue. He has got a name to protect. If you have a name, you can bill even more. Those that go the other way don't care about building a name that they can turn to gold. I was just singling out the part of his post that is one of the reasons why buildings keep collapsing here. Did you notice how Lagos State refused to hold public hearings on the collapse of those towers? Because it would have clearly exposed the complicity of untouchables in government house in the collapse of those buildings and would have led to strident calls for untouchables to leave office. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 10:59am On Oct 29, 2022 |
spyder880:Which one is better between the two |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:15pm On Oct 29, 2022 |
rukyboy:You mean between plastic and aluminium doors? Well, this door is a combination of an aluminium frame, with the lower cover made of plastic, while the upper cover is perspex. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:15pm On Oct 29, 2022 |
Happy weekend my people. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 6:51am On Oct 30, 2022 |
spyder880:Engr. Pls what did it cost to mount and fix the bamboo scaffolding. Labour only. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:50am On Oct 30, 2022 |
rukyboy:N80,000. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by ImperialCovfefe: 5:27pm On Oct 30, 2022 |
spyder880:Kudos, bro. How much did the plastering and art work cost (labour only)? Thanks |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:11pm On Oct 30, 2022 |
ImperialCovfefe:I had to bargain for everything, plastering, dressing of doors and windows, artworks, etc. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by ImperialCovfefe: 12:58am On Oct 31, 2022 |
spyder880:I see. How much for all the listed items? |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:26am On Nov 01, 2022 |
Moving to buy floor and wall tiles for this building today.............
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:30pm On Nov 03, 2022*. Modified: 8:48pm On Nov 03, 2022 |
Arrival of the first batch of tiles, another batch being expected today.....
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:50pm On Nov 03, 2022*. Modified: 7:29am On Nov 05, 2022 |
We then started to hang these doors.........
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:52pm On Nov 03, 2022 |
More doors being hung........
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:55pm On Nov 03, 2022 |
And we have started to dress the doors nicely .........
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:11pm On Nov 03, 2022 |
Today at this site.........
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michlins(m): 6:49am On Nov 04, 2022 |
Work obviously is speeding up |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 7:52pm On Nov 04, 2022 |
spyder880:Wow! I love this black door. Is it the Jiahua door? I noticed you used it for rooms only. I'm curious to see the doors you used for entrance into the apartments |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:03pm On Nov 04, 2022 |
michlins:It is, we are trying to complete this house so we can start another one ![]() |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:06pm On Nov 04, 2022 |
rukyboy:The doors are cool, I saw cheaper doors, even those of less than N40,000, but I chose to buy these because they look beautiful and durable. The worst thing in a house is having the fittings spoiling regularly. Its usually a headache. The external doors will be local welded iron doors with those embossed designs on it. They have started building the doors. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 6:16am On Nov 05, 2022 |
spyder880:These doors are quite beautiful. Do you have POP in the ground floor bedrooms or that is cornice only?
|
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:58am On Nov 05, 2022 |
folyshow:That is screeding with POP paste, then cornice at the while edges all over the ground floor. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 7:09am On Nov 05, 2022 |
spyder880:Oh OK. I'm hoping the local fabricated iron door will look as good as this . Why do you use them as entrance doors? Are they stronger? |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:11am On Nov 05, 2022 |
rukyboy:Yes, the frames are built to be stronger. Made with more security in mind. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:30am On Nov 05, 2022 |
We are planning to load the bathroom tiles this morning. Everything is adding more money in the market. I just survived a N50 raise on the tiles I agreed to buy yesterday, I did the transfer, the money bounced back due to bad network, and they were already adding money this morning. Cant blame them though, the economy is shaky right now. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michlins(m): 9:46am On Nov 05, 2022 |
spyder880:omo. You get luck. Bought cement for 4,200 this morning. Something I bought 4,000 last week. If I know,I for stock up on cement |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:57am On Nov 05, 2022 |
michlins:I stocked 300 bags for the tiles in this house at 3,600 two weeks ago. I had seen all these price rises, it was inevitable. |
| Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:33am On Nov 07, 2022 |
We are planning to start the tiling of walls, bathrooms and kitchens in this house this morning, more pictures later. |
Construction Process Of Four Bedroom Bungalow @ Mowe • CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE • New Construction Of A Block Of 6 Flats Of 2 Bedrooms In Enugu East. • 2 • 3 • 4
House With 'Animal Mouth' Entrance In Enugu (Photo) • Where To Get Wallpapers In Lagos • Top 10 Biggest Estates In Nigeria