Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 4:46pm On Nov 30, 2022 |
Living room, dining rooms and other common areas being tiled..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:35pm On Nov 30, 2022 |
Floor tiles skirting.........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michlins(m): 8:44pm On Nov 30, 2022 |
spyder880:the black tiles, do they have a specific name? |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:25pm On Nov 30, 2022 |
michlins: These are the marble face tiles made by Time ceramics. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:54am On Dec 03, 2022 |
More works going on as we tile the walls and floors of this building..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:56am On Dec 03, 2022 |
More floor tile skirting...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:38am On Dec 05, 2022 |
We have almost completed the tiling works in this house, more pictures later. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 12:46pm On Dec 08, 2022 |
Kitchen floor tiles, counter top tiles, all going on............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 12:54pm On Dec 08, 2022 |
Some completed kitchens, remaining the top.............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:25pm On Dec 08, 2022 |
Starting the steps..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:34pm On Dec 09, 2022 |
Wall tiles grouting in progress.........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:46pm On Dec 09, 2022 |
Staircase tiles ongoing..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 6:47am On Dec 10, 2022 |
spyder880: Engineer, what usually determine your choice of kitchen cabinets (i.e. when to use bricks/concrete top and when to use boards/granite top)? Is it strictly the factor of budget or there are some other engineering factors to be considered before choosing what to go for. Secondly, does the type of kitchen cabinets add or reduces rental values? Thanks |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:17am On Dec 10, 2022 |
folyshow: What usually determine the choice of cabinets, is usually the intended use of the house. I am a person that sees rental property as a business, and I make my decisions on the choice of materials on cost, and durability. For a rental house, the focus should be on the choice that takes the least cost to build, and that won't make the landlord to be coming back to maintain or repair the fittings in a house every now and then, hence my preference for a stronger cabinet based on concrete, then tiling over it to make it look better. Some tenants could be very rough, and even careless, and so damage to wooden fittings are more rampant as the house is rented from one family to another. The front will have wooden cabinets. The top will be finished with strong, white slippery tiles that ensures easier cleaning. When we come to private residential property, the focus is on the comfort of the owners/occupiers of the building. So I usually go for stronger cabinets, since its usually one or two kitchens at most, we finish the top with granite/marble to suit the taste of the owners. Since it's a private residential house, the owners will be more careful with the wooden cabinets. Pictures 1 and 2, concrete cabinets for a rental block of flats I built somewhere. Pictures 3 and 4, wooden cabinets I built for some private residential buildings somewhere. 4 Likes
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 6:50am On Dec 11, 2022 |
spyder880: Thanks for the very detailed response. 2 Likes |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:20am On Dec 11, 2022 |
We bought and offloaded many tiles in this site yesterday. We will start working with the tiles today. More pictures later. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:34am On Dec 12, 2022 |
Tiles still being done in this site, more pictures later. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:35am On Dec 12, 2022 |
We might start the construction of a security man house for this property as soon as possible. More pictures about this later. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:17am On Dec 13, 2022 |
The staircase finish is ongoing..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 12:32pm On Dec 13, 2022 |
We are set to start buying materials for the sanitary wares installation, kitchen and bedroom cabinets, handrails and painting of this house. More pictures as we start off these works. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:18am On Dec 17, 2022 |
Meanwhile, kitchen counter top getting ready......... Work still in progress, grouting, and other finish works still going on. 2 Likes
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:21am On Dec 17, 2022 |
We have also bought and offloaded some sanitary wares needed to complete this house, more pictures from this site later. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:47am On Dec 22, 2022 |
We have purchased many of the materials we need to fit sanitary wares in this building............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:51am On Dec 22, 2022 |
More works done
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:53am On Dec 22, 2022 |
We started by fitting the water heater units..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:55am On Dec 22, 2022 |
Placing WC sets..............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:58am On Dec 22, 2022 |
We are also fitting the shower sets on each bathroom...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:55pm On Dec 22, 2022 |
More from our works today..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 12:43pm On Dec 24, 2022 |
Well-done sir. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 1:26pm On Dec 24, 2022 |
rukyboy: Thank you bro. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:08am On Dec 26, 2022 |
The next stage of this work is to build kitchen and bedroom cabinets here. We have gone to the market and bought a lot of materials needed for this work.
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:09am On Dec 26, 2022 |
Our preferred colour for the cabinets............
|
(1) (2) (3) ... (21) (22) (23) (24) (25) (26) (27) ... (33) (Reply)
Aluminium Vs Asbestos Roofing Sheets. / What Are The Pros And Cons Of Flat Roof Design In Nigeria / Building A 2 Bedroom Flat
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29 |