Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,160,699 members, 7,844,308 topics. Date: Wednesday, 29 May 2024 at 06:13 PM

Documenting The Construction Of A Mini Event Centre - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Documenting The Construction Of A Mini Event Centre (3614 Views)

Can ₦2M Finish The Construction Of A 2-Bedroom Flat? / The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process / Roofing A Mini Event Hall Without Pillar (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:43pm On Sep 28, 2022
It rained all through the day in the city of Owerri, so the guys on site resorted to this.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:44pm On Oct 23, 2022
Updates.

Sincere apologies for the lack of updates, lots of activities yearning for my attention lately.

We have concluded with the levelling of the walls.
We have also received tenders from some selected steel roof specialist for the roofing of this project.
The construction of the roof beam and parapet walls is next on our schedule.

Please keep following this thread.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:06pm On Oct 23, 2022
Views from the street.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 7:13pm On Oct 23, 2022
Formworks have been struck off.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:33pm On Oct 27, 2022
Good day nairalanders.
We just commenced the roof beam/fascia formwork.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:41pm On Oct 27, 2022
The rendering of the internal face of the ground floor walls have also commenced.
Please keep following for updates.
Re: Documenting The Construction Of A Mini Event Centre by Amarisco(f): 3:58am On Oct 29, 2022
I’m still intrigued
Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:24am On Oct 30, 2022
Amarisco:
I’m still intrigued
Thank you ma'am for your interest on this project. Please keep following for more updates.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:33pm On Nov 07, 2022
Updates.
Roof beam formwork 80 percent done.
Iron fitting ongoing.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:44pm On Nov 07, 2022
More pictorials.
Meanwhile, we are about to commission a roof subcontractor to handle the fabrication and installation of the steel roof frames

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:45pm On Dec 15, 2022
Good day great nairalanders.
It's been a while I updated this thread. We have been working gradually.

Updates.
1. Hold-down bolts and base plates have been installed.
2. Roof beam concrete fully cast.
3. Parapet have been erected, ready to receive R.C. Coping.
4. Guest house about to receive concrete fascia.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 6:32pm On Dec 15, 2022
More pictorials.

2 Likes

Re: Documenting The Construction Of A Mini Event Centre by Amarisco(f): 5:18am On Dec 18, 2022
UC92:
Good day great nairalanders.
It's been a while I updated this thread. We have been working gradually.

Updates.
1. Hold-down bolts and base plates have been installed.
2. Roof beam concrete fully cast.
3. Parapet have been erected, ready to receive R.C. Coping.
4. Guest house about to receive concrete fascia.

What’s your new scope for the practical completion time
Re: Documenting The Construction Of A Mini Event Centre by UC92: 4:20am On Dec 25, 2022
Amarisco:


What’s your new scope for the practical completion time
Merry Christmas to you and your household.

Unfortunately due to some financial constraints from the sponsor of the project we couldn't meet up with the scheduled practical completion time.

We have resolved to continue with the project by the 3rd week of January.
The following is top of our scope:
1.Fabrication and installation of steel roof for the hall.
2. Construction of the wooden roof frame and installation of Aluminum sheets for the guesthouse.
3. Construction of security house.
4. Finishes (some parts of the buildings have been plastered already).

Thanks for checking up on our project.

Reminder: we are done with the parapet coping.

1 Like

Re: Documenting The Construction Of A Mini Event Centre by UC92: 4:31am On Dec 25, 2022
When will resume by January 2023, we will be making a slight adjustment to the parapet by adding extra two course of blocks. This is to enable us get a considerable slope for water run off on the roof system.

Some views of the guest house.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 4:42am On Dec 25, 2022
We have taken a little break on this project while working to actualize other projects, that has been the reason for not updating this thread timely. We will be resuming work after the festivities.

MERRY CHRISTMAS TO ALL MEN OF GOODWILL.
Re: Documenting The Construction Of A Mini Event Centre by omonnakoda: 5:59pm On Feb 05, 2023
Thieving huge undertaking
What is expected completion cost?
Re: Documenting The Construction Of A Mini Event Centre by UC92: 9:54am On Feb 22, 2023
omonnakoda:
Thieving huge undertaking
What is expected completion cost?
Sorry for the late response.
The estimate to complete this project is a subjective one as we are looking at various options of finishing. We intend to make the centre a smart one, include automated collapsible walls and lots of other additions.

Thanks for your interest in this project.

We are almost done with external plasterings.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 10:01am On Feb 22, 2023
More pictures.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:24am On May 24, 2023
The roof trusses on this project have been fabricated and installed. 0.55mm Long Span regular sheets with narrow corrugation was used for the covering.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:30am On May 24, 2023
More pictures.

Roofing sheets, roof hooks, felt, washer.

Re: Documenting The Construction Of A Mini Event Centre by UC92: 5:36am On May 24, 2023
On another scene, We have been working on a 3 bedroom duplex. we are about doing the roof wood work.
Location: Ibusa, Oshimmili North L. G. A. Delta state.

(1) (2) (3) (Reply)

5 Bedroom Detached (new) House 4 Sale In Magodo Gra (shangisha) - {see Pix). / Lekki Royal Garden Estate,ibeju-lekki For 7m With C Of O Also Gated And Fenced / A Fenced Plot Of Land In The Best Estate In Owerri Imo State For Sale (pix att.)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.