Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola (14203 Views)

David Umahi: Abuja-Kaduna-Kano Highway To Be Completed In 24 Months / Video: Abuja To Kano Highway Fashola Approved At N2.1 Billion Per Kilometre / Why I Won’t Complete Projects Initiated By Akpabio – Gov Emmanuel (2) (3) (4)

(1) (2) (Reply) (Go Down)

Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Omooba77: 12:39pm On Apr 18, 2023
The Minister of Works and Housing, Babatunde Raji Fashola, has stated that the present administration will not be able to complete the Abuja-Kaduna section of the Abuja-Kaduna-Kano highway due to several challenges encountered in the course of rehabilitation of the road.

In a statement on Tuesday, Fashola blamed the delay for the completion of the 265km part of the road on criminality and the need to relocate some communities on the road.

He, however, said sections 2 and 3, which are 210 kilometres combined, would be completed and commissioned by President Muhammadu Buhari before he leaves office in May.

On why work on the section 1 of the road which is from Abuja from Zaria was not progressing like the other two, the minister attributed the reasons to criminal activities which stalled the work for about a year in 2022, issues about right of way because of the need to relocate buildings, markets electricity installations, utilities all of which must be addressed before the contractor can do his job,” the statement said.

Speaking during an inspection tour of the highway with Chief of Staff to the President, Professor Ibrahim Gambari, Fashola stated that work on the first section was ongoing and required collaboration between the ministry and the Federal Capital Territory Minster and the Governors of Niger and Kaduna states whose territories are connected to the road.

He gave the assurance that the section would be completed by the next administration as soon as possible as funding which is being provided by the Nigerian Sovereign Investment Authority is readily available.

On his part, Gambari who expressed satisfaction with the work done said, “Both sections 2 and 3 will be completed and ready for commissioning by President Muhammadu Buhari before the end of the tenure of his administration”.

He disclosed that another legacy project of the President, the 2nd Niger bridge, will also be commissioned by the President before he leaves office.

He recalled that the bridge had been opened for road users during the last Christmas season to ease the hardship that people had suffered for years.

The COS praised the president for his outstanding and commendable commitment to infrastructural development across the country.

“We want to commend Mr. President for making the resources available so that this kind of progress can be made,” he said.

The Managing Director of the Nigerian Sovereign Investment Authority, Mr Aminu Umar Sadiq, affirmed his organisation’s commitment and readiness to provide the funding for the project.

https://dailytrust.com/why-buhari-wont-complete-abuja-kaduna-kano-highway-fashola/

3 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by slivertongue: 12:40pm On Apr 18, 2023
Excuse merchant

43 Likes 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by treesun: 12:45pm On Apr 18, 2023
Same way Lagos-Ibadan will not be completed !

37 Likes 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by CodeTemplar: 12:47pm On Apr 18, 2023
Excuses upon excuses. Audio Party.

36 Likes 2 Shares

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Omooba77: 1:14pm On Apr 18, 2023
Fashola the smooth talker......

17 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Omooba77: 1:15pm On Apr 18, 2023
treesun:


Same way Lagos-Ibadan will not be completed !

Hmmmm. Nigeria is not blessed with leaders......

19 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by inoki247: 2:07pm On Apr 18, 2023
treesun:


Same way Lagos-Ibadan will not be completed !


Lol I think the Lagos Ibadan Express way is at 80 to 90 percent unless you jus don't want to tell ursef the truth....


The road is better than the Previous years of OBJ...

21 Likes 2 Shares

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by vastolord4(m): 2:23pm On Apr 18, 2023
Funny people! But he completed his own mission

1 Like

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by treesun: 2:40pm On Apr 18, 2023
inoki247:



Lol I think the Lagos Ibadan Express way is at 80 to 90 percent unless you jus don't want to tell ursef the truth....


The road is better than the Previous years of OBJ...

Go to OPIC from Berger!

19 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Omooba77: 4:10pm On Apr 18, 2023
Bad road networks make it easier for bandits and kidnappers to wreck havoc.......

8 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by SpatialKing(m): 4:20pm On Apr 18, 2023
Liars
Fashola is just a common criminal
Thief

16 Likes 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by ATEAMS: 4:21pm On Apr 18, 2023
Damn
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by iCauseTrouble: 4:21pm On Apr 18, 2023
Make e complete am abeg grin
I travel on this road weekly and I must say it is very terrible.

2 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Racoon(m): 4:21pm On Apr 18, 2023
Buhari can't complete such a major highway in Nigeria but busy borrowing money to build the Kano - Maradi - Niger Republic railway corridor. Always making excuses and passing the buck.

17 Likes 2 Shares

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Nobody: 4:22pm On Apr 18, 2023
Lol
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Eraser33(m): 4:22pm On Apr 18, 2023
Has Buhari ever completed anything good that he started? He is only leaving a legacy of hyperinflation behind by increase federal workers salaries by 40% to inflict more pains on the masses.

2 Likes 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by ASHIWAJU2023: 4:22pm On Apr 18, 2023
I
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Nobody: 4:22pm On Apr 18, 2023
grin
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by hedonister: 4:23pm On Apr 18, 2023
See a slum in a wealthy area in Abuja. This is surprising..


https://www.youtube.com/watch?v=IgcK7xANp80
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by thisisit: 4:23pm On Apr 18, 2023
EXCUSE.. EXCUSE... EXCUSE
EXCUSE.. EXCUSE... EXCUSE
EXCUSE.. EXCUSE... EXCUSE
EXCUSE.. EXCUSE... EXCUSE

IS EQUAL TO FAILURE

7 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by AsomStructures: 4:23pm On Apr 18, 2023
Excuses won't get us anywhere. I think the proper thing should be done which is swinging into action..
See our just concluded 3bedroom bungalow construction if you're about starting your building project.. Link in my signature. Plus we offer building designs and construction services nationwide

1 Like

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by olatade(m): 4:23pm On Apr 18, 2023
Jagaban will surely complete it.

Continuity is the watch word here

1 Like 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by Hambivert: 4:24pm On Apr 18, 2023
FG: Criminal elements have been utterly destroyed.
The next day...
FG: We can not complete the road because of the high criminality in that axis

Since government work can be halted because of 'impoverished' criminal elements, I think it's safe to say that criminals control Nigeria.
Anyways, Mr. Fashola, after 8 years, did 24hours power supply turn into rocket science overnight?
Or do we need to look at that camera you miraculously found at the Lekki Toll gate to find out?

12 Likes 1 Share

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by clarocuzioo(m): 4:24pm On Apr 18, 2023
Are these not the roads they took outrageous loans for?
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by nedekid: 4:26pm On Apr 18, 2023
Crap.
We know the reason is insecurity, Fulani bandits and heardsmen.
But how can he admit that, when his is a member of an administration and party that claims to have curbed insecurity. That has made the country as safe as a kindergarten.
Offer this fellow $1b dollars to drive from Abuja to Kaduna alone in his car and he will reject the owo.

6 Likes

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by israelmao(m): 4:26pm On Apr 18, 2023
Fashola performed some feats in Ministry for Works and Housing to be candid but that doesn't exempt him from telling some lies and making some excuses.
Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by 2xcva6q: 4:31pm On Apr 18, 2023
Free!!

Re: Why Buhari Won’t Complete Abuja-Kaduna-Kano Highway – Fashola by onuman: 4:34pm On Apr 18, 2023
Omooba77:


https://dailytrust.com/why-buhari-wont-complete-abuja-kaduna-kano-highway-fashola/

Even to build common road..


Truth is that the Federal government of Nigeria has been impoverished by the fight against Boko Haram terrorism and its bandits offshoot. The government will not come out to say how much it spends on the fight. It will not say how much Tourism money Nigeria loses yearly due to insecurity brought by Boko Haram. Many peaceful countries survive by Tourism revenues alone.

Boko Haram is like fetching firewood infested by red ants for all of Nigeria by those political and religious leaders of the 12 northern sharia states that adopted unconstitutional Islamic sharia criminal justice system beginning 1999. Boko Haram is fighting for a Nigeria to be governed with Sharia criminal justice system.

4 Likes

(1) (2) (Reply)

President Bola Tinubu Returns To Abuja After His First Participation At The UNGA / Abuja-Kano Road: Fashola Blames "Senators’ Request" For Slow Pace Of Work / LASG Seals Illegal Container Terminal In Ibeshe, Ikorodu

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.