General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1063) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4434002 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1060) (1061) (1062) (1063) (1064) (1065) (1066) ... (3676) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Timtol(m): 8:09am On Nov 10, 2018
Chekitaut:
Its 10% on Materials & Labour cost... any charges less is your power to bargain or sympathy from the Engineer.
Cool bro.
That's true.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by igwedehxy: 10:31am On Nov 10, 2018
sconp:

I no go lie, this question pain me.

Na serious thing o . Lol
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 4:43pm On Nov 10, 2018
megacontrol:
Yeah i see this quite a lot but wonder what's the basis. is supervision in itself not a labour charge? if so, why can't supervision be charged as a % of materials only.

I wouln't even agree to this method anyways. Supervision/professional fees, just like labor, should be charged based on work scope and not material.

You guys might actually be shortchanging yourself. If the client decides to purchase materials himself and gets it cheaper than your quote and you charge your fees as a % of materials, then you make less money than what you anticipated if you had purchased the material.

Yes possible you get your materials more cheaper at least there is figure, even if you get it for free market wholesale price will be used to calculate the %, remember all engineers are employer of labour, their certificate etc. i mostly advice you get your materials yourself because some dubious, greefy, selfish engineer will do permutation wt supplier there by ripping you off your hard earning money. also have a good bargaining power. you can provide your skilled labour no problem. Engineer authentic your structure they are who government know not the property owner.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 5:10pm On Nov 10, 2018
ceelog:

15 million completed this house to fittings?
Pls share how you achieved that. Even if it's cost from the carcass level.
Good one Madam
I already shared up to carcass and have updated the projection to finish save for the last bits.

What I try to do when I finish a project is do a stock take on what I would do differently. The benefit of hindsight. If I felt an artisan was too expensive or stole too much, was too slow and would cause significant delays or colluded with another to stress the project etc I would tactfully deal with this.

I reduced my use of local artisan to reduce pilferage. I had only school holidays to do the project which meant every task came with time scale. Cos of space and pilferage issues I only bought supplies as needed and they were on and bolted often times within 24 hours. For example, the blockwork for the top floor was completed in 4 days with day 1 being used by my bricklayer to set the first block and agree spacing in relative calm and day 2 to 4 a total of 6 bricklayers and 6 labour arrived to complete block work with an agreed rate per block and me armed with info from previous day's work on number of blocks and I shared this with them on arrival.

Those major conditions that came into play have an associated cost and I will try to estimate what those are. I will try and work on completing my spreadsheet and share.

Timing, supervision and making my artisan happy to come to work probably helped too cos from July to September I got a helper to cook for all workers on site before then 1 paid 250 for food daily.

5 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 5:28pm On Nov 10, 2018
gabbytabby:
I already shared up to carcass and have updated the projection to finish save for the last bits.

What I try to do when I finish a project is do a stock take on what I would do differently. The benefit of hindsight. If I felt an artisan was too expensive or stole too much, was too slow and would cause significant delays or colluded with another to stress the project etc I would tactfully deal with this.

I reduced my use of local artisan to reduce pilferage. I had only school holidays to do the project which meant every task came with time scale. Cos of space and pilferage issues I only bought supplies as needed and they were on and bolted often times within 24 hours. For example, the blockwork for the top floor was completed in 4 days with day 1 being used by my bricklayer to set the first block and agree spacing in relative calm and day 2 to 4 a total of 6 bricklayers and 6 labour arrived to complete block work with an agreed rate per block and me armed with info from previous day's work on number of blocks and I shared this with them on arrival.

Those major conditions that came into play have an associated cost and I will try to estimate what those are. I will try and work on completing my spreadsheet and share.

Timing, supervision and making my artisan happy to come to work probably helped too cos from July to September I got a helper to cook for all workers on site.
Ma, you always a mind blowing individual... Builder with wisdom. Nice budget
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 5:31pm On Nov 10, 2018
gabbytabby:
I already shared up to carcass and have updated the projection to finish save for the last bits.

What I try to do when I finish a project is do a stock take on what I would do differently. The benefit of hindsight. If I felt an artisan was too expensive or stole too much, was too slow and would cause significant delays or colluded with another to stress the project etc I would tactfully deal with this.

I reduced my use of local artisan to reduce pilferage. I had only school holidays to do the project which meant every task came with time scale. Cos of space and pilferage issues I only bought supplies as needed and they were on and bolted often times within 24 hours. For example, the blockwork for the top floor was completed in 4 days with day 1 being used by my bricklayer to set the first block and agree spacing in relative calm and day 2 to 4 a total of 6 bricklayers and 6 labour arrived to complete block work with an agreed rate per block and me armed with info from previous day's work on number of blocks and I shared this with them on arrival.

Those major conditions that came into play have an associated cost and I will try to estimate what those are. I will try and work on completing my spreadsheet and share.

Timing, supervision and making my artisan happy to come to work probably helped too cos from July to September I got a helper to cook for all workers on site.
hello house,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 6:16pm On Nov 10, 2018
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 6:31pm On Nov 10, 2018
Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?
What is going on here, pls explain.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 6:34pm On Nov 10, 2018
Please what's the usefulness of these holes in the door attached?
I took the picture in a hotel in Abuja?

@Skimaski
@cedarwood
Others

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 7:01pm On Nov 10, 2018
Chekitaut:
What is going on here, pls explain.
I think it is self explanatory.

Bricklayer is for plastering of the entire building and POP separate quote
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 7:41pm On Nov 10, 2018
Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?

For the POP, can't condemn the rate since the designs agreed are not attached. But for standard modern designs like the ones on these thread https://www.nairaland.com/4772973/nairalanders-pop-ceiling-project-anambra, we can do N3,500/sqm for that volume.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 7:47pm On Nov 10, 2018
Dominionng:


For the POP, can't condemn the rate since the designs agreed are not attached. But for standard modern designs like the ones on these thread https://www.nairaland.com/4772973/nairalanders-pop-ceiling-project-anambra, we can do N3,500/sqm for that volume.
either of these designs and he said designs will be different for each section to seem fit.

He said anyone I pick they will do.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 8:37pm On Nov 10, 2018
The spreadsheet to completion is attached.

Costing attached to conditions below

This is for 4 units of room and parlour self contained and 2 units of 2 bedroom flats. Its actually closer to 14million in total.

1) I do have a lot of time on my hands and over 10 years knowledge behind me to do the costing and know what i do need at each stage. comes at a cost of 2.5 million
2) I self project manage and supervise all my buying. Cost of this is approximately 2 million
3) I virtually lived on site. 1 Million.
4) All professional fees are waved because this is phase 2 of a much larger project. Also because of these, stuff like borehole water was already on site. 1 million
5) We pulled down a bungalow and reused windows, roofing wood and filing sand all of which i already adjusted for in the costing. 500k

What i am saying is that if you are new to this and you get it done especially for you by others for approximately 7 million more you would have done well. True contractor cost would be in the region of 22million.

7 Likes 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 8:41pm On Nov 10, 2018
Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?
depend the location of ur sites
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 8:43pm On Nov 10, 2018
Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?
tell me the location, then l will tell u. If it OK or not, thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by gabbytabby: 8:48pm On Nov 10, 2018
The sand is way too much. Double tipper is the 10 tonne that they call 15 tonne right and for my last project we used 4 plaster and 1 sharp.My cement was 120 and he has quoted 350 approximately 3 times that. Negotiate negotiate there is room for this.

As specified the rate for POP on average is about 3000 to 3500 per sq mtrs. Check the square meter also.


Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 8:57pm On Nov 10, 2018
Adedward:
tell me the location, then l will tell u. If it OK or not, thanks
SW(ogun)
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 8:59pm On Nov 10, 2018
gabbytabby:
The sand is way too much. Double tipper is the 10 tonne that they call 15 tonne right and for my last project we used 4 plaster and 1 sharp.My cement was 120 and he has quoted 350 approximately 3 times that. Negotiate negotiate there is room for this.

As specified the rate for POP on average is about 3000 to 3500 per sq mtrs. Check the square meter also.


I suspect sand quote too.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 9:27pm On Nov 10, 2018
I am gonna have to find buyer for my truck now to cover this cost. Whoever is interested or know any interested buyer should visit my profile or click on related thread in my profile for the Jeep. cheesy
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Abdomox: 9:53pm On Nov 10, 2018
Prodigious farms limited is in need of experts in the construction of snail greenhouse using galvanise pipe.

Kindly send your proposal for 20ft by 40ft and 40ft by 60ft to info@prodigiousfarms.com 

Further clarifications can be sought on this thread or via mail.

Thank you.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 10:54pm On Nov 10, 2018
Dominionng:


For the POP, can't condemn the rate since the designs agreed are not attached. But for standard modern designs like the ones on these thread https://www.nairaland.com/4772973/nairalanders-pop-ceiling-project-anambra, we can do N3,500/sqm for that volume.
The doyen of creativity as spoken.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 10:56pm On Nov 10, 2018
Empiree:
SW(ogun)
What Ogun? That have the cheapest building materials in Nigeria... Givie the guy red card... na barawo bansa.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 11:00pm On Nov 10, 2018
Empiree:
I suspect sand quote too.
all quote is high...
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 11:15pm On Nov 10, 2018
Chekitaut:
all quote is high...
can you give quotation idea?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 12:52am On Nov 11, 2018
Empiree:
SW(ogun)
if its Ogun, pls the cost of materials is too much, add me on wattsap, for the materials cost, thanks,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by SVPROJECT(m): 3:29am On Nov 11, 2018
Empiree:
Experienced homebuilders should say something on this. Are these prices fair for the square meters indicated?
Can you give a proper description of the project?
Plastering and Rendering with 350 Bags sounds like a No No, The Sand too.

This ongoing project hasn’t taken more than 3 Trucks of Plaster Sand( Softsand) and 122 Bags of Cement, Scaffold didn’t cost me more than 90k with Workmanship.
That’s a 3 unit of 2bedroom Flat and 1 unit of 3bedroom flat here in Lagos.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Empiree: 5:04am On Nov 11, 2018
SVPROJECT:

Can you give a proper description of the project?
Plastering and Rendering with 350 Bags sounds like a No No, The Sand too.

This ongoing project hasn’t taken more than 3 Trucks of Plaster Sand( Softsand) and 122 Bags of Cement, Scaffold didn’t cost me more than 90k with Workmanship.
That’s a 3 unit of 2bedroom Flat and 1 unit of 3bedroom flat here in Lagos.
actually I'm just looking at the quote properly but I knew something wasn't right when I got it. Bags of cement kinda high. I think the bricklayer gave wrong quote. I just feel like cement quote is close to building a bungalow. Lol

Zoom it and then envisage the other side you can see in the picture

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by SVPROJECT(m): 7:15am On Nov 11, 2018
Empiree:
actually I'm just looking at the quote properly but I knew something wasn't right when I got it. Bags of cement kinda high. I think the bricklayer gave wrong quote. I just feel like cement quote is close to building a bungalow. Lol

Zoom it and then envisage the other side you can see in the picture

Seen, You can Call/WhatsApp 07031112625

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 7:34am On Nov 11, 2018
gabbytabby:
The spreadsheet to completion is attached.

Costing attached to conditions below

This is for 4 units of room and parlour self contained and 2 units of 2 bedroom flats. Its actually closer to 14million in total.

1) I do have a lot of time on my hands and over 10 years knowledge behind me to do the costing and know what i do need at each stage. comes at a cost of 2.5 million
2) I self project manage and supervise all my buying. Cost of this is approximately 2 million
3) I virtually lived on site. 1 Million.
4) All professional fees are waved because this is phase 2 of a much larger project. Also because of these, stuff like borehole water was already on site. 1 million
5) We pulled down a bungalow and reused windows, roofing wood and filing sand all of which i already adjusted for in the costing. 500k

What i am saying is that if you are new to this and you get it done especially for you by others for approximately 7 million more you would have done well. True contractor cost would be in the region of 22million.

I carefully went through your expense log and must confess you did a excellent job managing cost.

I have some observations though I would want you to clarify.

1. The prices of the woods seem very very cheap. Is it peculiar to where you live? 2 by 4 was 420naira!!!

2.what was the need for 2 by 3 furniture wood under roofing to ceiling?

3. I didn't see cost for scaffold and casting labour for upper lintel.

4. Under your plastering, how many cement did you use 50 or 100? It's not clear

5. Super impressed you built and roofed this house with only 8 million

6. How did you achieve that amount for the windows? One will guess that that house carries over 25 windows.

But overall, you killed it at this amount!

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by earthrealm(m): 7:42am On Nov 11, 2018
igwedehxy:
Hello hux. Pls who buys the electric bulb for a new house rented out? Is it the landlord or the tenant . The lampholders are in place but there is no bulb? Its a 3bedroom flat

guess na american returnee grin grin

in the western world, light bulbs and all sorts are in place b4 you move in.
in nigeria, its only the fixtures that are put by landlord, the tenant buys bulbs.

personally, most of the light fixtures installed by landlords are cheap junk, and i have had to change out some to my taste grin grin
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dominionng(m): 8:02am On Nov 11, 2018
Empiree:
either of these designs and he said designs will be different for each section to seem fit.

He said anyone I pick they will do.

Ok I see reason now. Most folks charge dado rails on ceiling separately, but N4,000/sqm is fair for the volume since its being charged together.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 8:47am On Nov 11, 2018
earthrealm:


guess na american returnee grin grin

in the western world, light bulbs and all sorts are in place b4 you move in.
in nigeria, its only the fixtures that are put by landlord, the tenant buys bulbs.

personally, most of the light fixtures installed by landlords are cheap junk, and i have had to change out some to my taste grin grin
lol you are right sir. Even the high profile houses... we went to inspect a building with a client in Lekki... we had to change almost all the electrical fittings

1 Like

(1) (2) (3) ... (1060) (1061) (1062) (1063) (1064) (1065) (1066) ... (3676) (Reply)

Viewing this topic: otedola1(m) and 4 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)