₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,328,903 members, 8,437,889 topics. Date: Thursday, 02 July 2026 at 03:15 PM

Toggle theme

FG Awards N206bn Contract For Main Work Of Second Niger Bridge - Politics (2) - Nairaland

Nairaland ForumNairaland GeneralPoliticsFG Awards N206bn Contract For Main Work Of Second Niger Bridge (18782 Views)

1 2 3 4 Reply (Go Down)

Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Ijaya123: 2:21pm On Nov 13, 2018
Cool.

Some irredeemably pathetic enemy of Nigeria who have sold their souls to hatred will not like this.

Well I have a prayer for them, as they despise good news for this country, let good things be far from them. And as they rejoice in bad news, let bad things continually surround them.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by edupedia: 2:21pm On Nov 13, 2018
fergie001:
Akuko Mike Ejeagha grin grin grin grin grin grin grin grin grin grin



Let there be elections everyday ooooooo
...Sai Baba ....una toooooo muuuush
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Alexgeneration(m): 2:21pm On Nov 13, 2018
Election don reach, time for awarding contracts on paper don reach.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by seguno2: 2:22pm On Nov 13, 2018
kingcalipha:
Is it the same Bridge that is 90% complete?
Ayam not understanding.
Someone please help.
grin
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by michoim(m): 2:23pm On Nov 13, 2018
IPOB INGRATES will always be ingrates
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by ArinzeAnthony03: 2:24pm On Nov 13, 2018
Do the work...stop talking without nothing to show...nevertheless, if you like start from Onitsha and build bridge to Lagos... Me and my IBO brothers are already articulated and Obiliated...we are not voting Buhari...he is evil...we will not vote for someone that will turn your place to Dubai before election and kill you after election...we are voting Atikuobi for peace and progress not the other way round...so go and tell your master that we and our brothers here in the south south and more middle belt including some sane ones from SW have already rejected him as we did before... Thanku
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Yomboy4ever(m): 2:24pm On Nov 13, 2018
That idiot only gave them map and drawings and the Mumus said he was ther hero..
An incompetent President is completing all projects the competent ones have abandoned decades ago.
Sai Baba

Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Ijaya123: 2:24pm On Nov 13, 2018
PresidentAtiku:
I thought they have finished the bridge according to propaganda
Yes. GEJ finished and commissioned the bridge before leaving office.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Azumagcc(m): 2:26pm On Nov 13, 2018
BruncleZuma:
grin grin grin grin

Before we chant Sai Baba, edakun who are the contractors?

[img]https://i./7cZo.gif[/img]
Maybe you can't read. JB.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by xtravanganza: 2:26pm On Nov 13, 2018
Almaiga:
Buhari is doing in 3 years, what Jonathan, Stella Oduah, Peter Obi and all the entire Eastern Political leaders could not do in 16 years. Yet, they have the guts to insult him.
Nigerians are wiser now.

Sai Baba, Sai Jubril. grin
Zombie... you funny die
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by GavelSlam: 2:27pm On Nov 13, 2018
ednut1:
With massive "corruption' and low oil prices IBB was able to build 3rd mainland bridge. Today we cannot even build 4th mainland bridge or this 2nd niger bridge. All gimmick
What other project did IBB complete?
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by fablani(m): 2:27pm On Nov 13, 2018
useless federal government, Igbos are not zombies like other tribes you can easily deceive as you like
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by edupedia: 2:28pm On Nov 13, 2018
Alexgeneration:
Election don reach, time for awarding contracts on paper don reach.
....like your FIDIFI in those days?....but not now....wake up from your sleep....
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by ogunnoikitaiwo(m): 2:29pm On Nov 13, 2018
some people w still talk rubbish.... useless people..
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Kennydoc(m):
Corrinthians:
Charlie just watch. The lovers of bad news and hate propagators will still wail.. cheesy
Didn't you guys say the bridge was more than 50% completed? Are they still awarding contract? And he had to wait till 3 months before election to award it. Hahahaha. You guys think we are fools?
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by sirvvy: 2:31pm On Nov 13, 2018
undecided until work starts on the bridge before I believe this news..
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by whitebeard(m): 2:32pm On Nov 13, 2018
Almaiga:
Buhari is doing in 3 years, what Jonathan, Stella Oduah, Peter Obi and all the entire Eastern Political leaders could not do in 16 years. Yet, they have the guts to insult him.
Nigerians are wiser now.

Sai Baba, Sai Jubril. grin
u have serious problem
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by kernel001: 2:34pm On Nov 13, 2018
Almaiga:
Buhari is doing in 3 years, what Jonathan, Stella Oduah, Peter Obi and all the entire Eastern Political leaders could not do in 16 years. Yet, they have the guts to insult him.
Nigerians are wiser now.

Sai Baba, Sai Jubril. grin
People like you, "if" you're a woman, you will be easily be swayed. This is three years, yet they are still pilling, can't you think?
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by mimimile93: 2:34pm On Nov 13, 2018
celeiyke:
Mr Babatunde Fashola, the Minister of Power, Works and Housing, says the Federal Government has awarded N206 billion contract for the main work on the Second Niger Bridge. 2nd-Niger-Bridge Fashola who spoke in Abuja during an interactive session with newsmen noted that the contract was awarded to Julius Berger Construction Company. He said that the project, expected to be completed in 36 months would be funded under the Presidential Infrastructure Development Fund (PIDF). A-Ibom govt to Akpabio: You lied over Uyo-Ikot Ekpene Road According to him, funding the project under PIDF means that work will no longer stop on account of lack of funding. He said that the Lagos-Ibadan expressway and Abuja-Kaduna-Zaria-Kano road projects would also be funded under PIDF. Fashola said that the contract for the main work on the Second Niger Bridge was awarded after the completion of the four phases of the project. He said that the early works were preliminary projects to be completed before the main work, adding that all the early works were done in the river and not visible from the existing bridge. According to him, with the award of the main work, there will be a lot of piling works in the water and that is what people will see.

Read more at: https://www.vanguardngr.com/2018/11/just-in-fg-awards-n206bn-contract-for-main-work-of-second-niger-bridge/
God bless u PMB..

What Goodluck Badluck could not do in his region Baba is doing it..
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Deepthoughts: 2:34pm On Nov 13, 2018
celeiyke:
Mr Babatunde Fashola, the Minister of Power, Works and Housing, says the Federal Government has awarded N206 billion contract for the main work on the Second Niger Bridge. 2nd-Niger-Bridge Fashola who spoke in Abuja during an interactive session with newsmen noted that the contract was awarded to Julius Berger Construction Company. He said that the project, expected to be completed in 36 months would be funded under the Presidential Infrastructure Development Fund (PIDF). A-Ibom govt to Akpabio: You lied over Uyo-Ikot Ekpene Road According to him, funding the project under PIDF means that work will no longer stop on account of lack of funding. He said that the Lagos-Ibadan expressway and Abuja-Kaduna-Zaria-Kano road projects would also be funded under PIDF. Fashola said that the contract for the main work on the Second Niger Bridge was awarded after the completion of the four phases of the project. He said that the early works were preliminary projects to be completed before the main work, adding that all the early works were done in the river and not visible from the existing bridge. According to him, with the award of the main work, there will be a lot of piling works in the water and that is what people will see.

Read more at: https://www.vanguardngr.com/2018/11/just-in-fg-awards-n206bn-contract-for-main-work-of-second-niger-bridge/
imagine this kind of stupid propaganda just because elections are near!,when was the project contract awarded n how come even people around the site couldn't notice the presence of Julius Berger even though they were doing some invisible spiritual aspects of the contract?,it's up to the igbos to refuse or accepts to be fooled again,they were fooled with the presidency of 2023 before fashola let the cat out of the bag,now even okorocha who was so voiceferous about it has realized how stupid n foolish he has been all along.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by princfred(m): 2:34pm On Nov 13, 2018
Good to hear left to see.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by putin4: 2:35pm On Nov 13, 2018
After 3 years in office hahaha election is coming
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by almarthins(m): 2:35pm On Nov 13, 2018
promise4040:
Even if Buhari build a mansion for every indigene of South east, Daura is waiting for him.
You people never voted him before so what difference does it make good by taking the back stage again. Abeg jare! The man na die hard creature
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by alen4smith(m): 2:38pm On Nov 13, 2018
Olukat:
grin grin grin grin grin Still at contract awarding stage?
But it was said the work on the bridge was at advance stage!
Even "Joe Lagos boy" confirmed it with some pics.
I think their panic mode are activated shocked shocked shocked shocked shocked shocked shocked
go back and read the news again
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Bizibi(m): 2:39pm On Nov 13, 2018
Na lie!!!! Which money.....nobody should believe them,most of the monies now is for the elections. The projects fr 2018 aren't much.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Omooniya1: 2:40pm On Nov 13, 2018
Ijaya123:
Cool.

Some irredeemably pathetic enemy of Nigeria who have sold their souls to hatred will not like this.

Well I have a prayer for them, as they despise good news for this country, let good things be far from them. And as they rejoice in bad news, let bad things continually surround them.
I beg please mercy them, this prayer is too heavy for them,” Genesis 4:13 But Cain said to the LORD, “My punishment is greater than I can bear". they are the descendant of Cain.. they don't like good things.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by deomelo: 2:42pm On Nov 13, 2018
funding the project under PIDF means that work will no longer stop on account of lack of funding. He said that the Lagos-Ibadan expressway and Abuja-Kaduna-Zaria-Kano road projects would also be funded under PIDF.



Best move ever by PMB and Fashola.


The thieves and unpatriotic clowns in the house and senate can not stop, sabotage or obstruct these projects..



#SAIPMB2019


#VIVANIGERIA
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by fekolastic(m): 2:43pm On Nov 13, 2018
You see why these thieves continue to prosper, simply because people like do not read not keep tab of informations that APC churns out. Did you read what Fashola just said, he said that all the other works were done in side the River and cant be seen from the Surface even standing on the First bridge, and that it is from this second phase that physical structures will be see.So my question is all the pictures that APC have been posting showing physical structures where did they get it from? meaning that to prove GEJ right he awarded the contract of the phases that have taken care of all the substructure phases. lies lies upon lies HOW did we get here










Almaiga:
Buhari is doing in 3 years, what Jonathan, Stella Oduah, Peter Obi and all the entire Eastern Political leaders could not do in 16 years. Yet, they have the guts to insult him.
Nigerians are wiser now.

Sai Baba, Sai Jubril. grin
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by celeiyke(op): 2:44pm On Nov 13, 2018
The Federal Executive Council on Wednesday approved the contract for a 11.9-kilometre link road for the Second Niger Bridge.

The road that cut across Anambra and Delta states will gulp N206bn.



The Minister of Information and Culture, Alhaji Lai Mohammed, disclosed this to State House correspondents at the end of a meeting of the council presided over by President Muhammadu Buhari at the Presidential Villa, Abuja.

Mohammed explained that the contract for the link road also included the provision of associated infrastructure for the bridge.

He said the contract was awarded to Julius Berger Plc, which is already working on the project.

The minister stated that the Public Private Partnership model adopted for the project by the last administration had failed but that the present government was determined to complete it.

He added that the council awarded a contract for the rehabilitation of a road in Enugu State for N11.58bn.

According to him, the council also approved contracts for the provision of consultancy services and mining exploration at the cost of N12.7bn.

Mohammed added that the FEC ratified a multilateral competent agreement to assist in curbing tax evasion and improve revenue collection.

He said the council approved the Africa Project 50th Article of Association with two windows to allow for project finance by the Africa Development Bank as well as the Financial Transparency Policy Guideline memo, which would allow for more transparency on how government revenue were being handled.



He explained, “The three memos from the Ministry of Finance that were approved include the ratification of the multilateral competent authority agreement on automatic exchange of financial accounting information, ratification of the Africa 50th Articles of Association and the approval for the financial transparency policy guidelines.

“The first memo sought for the ratification of the multilateral competent authority agreement on automatic exchange of financial account information.”

Mohammed added, “The memo is going to assist in curbing tax evasion and improve the revenue collection of government.

“The Minister of Finance also presented a memo asking for approval for the ratification of the African 50th Articles of Association. This particular memo is unique in the sense that both the African 50th Project Finance and African 50th Project Development Association are actually two windows, which have been created by the African Development Bank to allow for bankable infrastructural projects to be financed by the subsidiaries of the African Development Bank. The memo will take care of certain projects, which cannot be financed simply by the AfDB.

“Such projects are to be financed by these two platforms and already, Nigeria is one of the founding members of these two platforms and has invested heavily in them, and the ratification of this treaty has made it possible for Nigeria to take advantage of this.”

According to him, the Minister of Finance is seeking the council’s approval for the financial transparency policy guidelines.

He stated, “This memo was approved and I think the unique thing about this memo is that it is going to bring more transparency to how government revenue and accounts are being handled.

“As a matter of fact, with the approval of this memo, it will now be possible for the public to know exactly how much revenue is collected by the government, how much is being spent just by going on the website of the various ministries, department and agencies.”

Mohammed said the council also approved the revised estimated total cost for the engineering, procurement and construction of the OB3 gas pipeline project.

He explained, “This is a project that has been awarded but there was a need for the cost of the redesigning to seek for council’s approval so that there will be enough funds to execute the project.

“The project is important because it has to do with the delivery of gas from the eastern part of the country to the power turbines to improve our power supply. This contract is awarded to Nestor Limited and Olisa Limited and the total cost of the contract is $92m and N765,968,000,000.”


https://punchng.com/2nd-niger-bridge-fg-approves-n206bn-anambra-delta-link-road/

ARE WE IN FOR ANOTHER SCAM? IN JULY LAI MOHAMMED SAID THEY AWARDED ROADS OF THE BRIDGE FOR N206b. NOW THEY SAID THE BRIDGE IS OF THE SAME COST.

GOD SAVE US FROM APC
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by Kana80: 2:44pm On Nov 13, 2018
Keep developing crisis. Fool.
Re: FG Awards N206bn Contract For Main Work Of Second Niger Bridge by fekolastic(m): 2:44pm On Nov 13, 2018
Omooniya1:
I beg please mercy them, this prayer is too heavy for them,” Genesis 4:13 But Cain said to the LORD, “My punishment is greater than I can bear". they are the descendant of Cain.. they don't like good things.
Your Punishment will be more for supporting lies, and those that churn out lies to the masses.
1 2 3 4 Reply

FG Awards Lagos-Calabar Coastal Highway To HitechFG Awards Zinox Technologies Over N85bn 2023 Digital Census ContractFg Approves N206bn For 2nd Niger Bridge234

Unknown Gunmen Kidnap Father Geoffrey Mark Chimezie In UmuahiaFubara To Commissioners: You Were Caught In Crossfire, I Have Nothing Against U"Social Media Is A Very Big Problem For This Country" - Garba Shehu