Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,239 members, 7,818,814 topics. Date: Monday, 06 May 2024 at 05:32 AM

4 Bedroom Bungalow Enquiries on Design, Construction and Cost - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost (41085 Views)

Design + Construction Of 7 Bedroom Family House, Enugu / Two Bedroom Bungalow Design, Construction Pictures And Cost / One Bedroom Bungalow Enquries On Design, Construction And Cost (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply) (Go Down)

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by mrbigseun(m): 7:16pm On Mar 18, 2019
Following full time! And the plan for 8 apartments of 2bedroom flat
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by michtob(m): 7:32pm On Mar 18, 2019
Keenly following. All the best sir
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:12pm On Mar 18, 2019
michtob:
Keenly following. All the best sir
mrbigseun:
Following full time! And the plan for 8 apartments of 2bedroom flat


You are all welcome.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:16pm On Mar 19, 2019
7. Damp proof membrane (DPM) = N20,800
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:33pm On Mar 19, 2019
8. Oversite Concrete. a.k.a German floor
It is 100mm (4inches)thick.

105bags of cement @2500 =262,500
14tonnes of sharpsand@ 3,000= 42,000
28tonnes of granite@4500. =126,000
Labour. =105,000
Total. =N535,500

The total cost of the oversite concrete is N535,500

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:23pm On Mar 19, 2019
segzy14:
1. Site clearing: This has to do with a site that doesn’t have trees, shrubs,stumps etc.
A site that just have bushes grown on it.

2Labourers will be needed for this task@N2,500 =N5,000

The Cost of clearing the plot is N5,000
please specify state and location.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:30pm On Mar 19, 2019
segzy14:
8. Oversite Concrete. a.k.a German floor
It is 100mm (4inches)thick.

105bags of cement @2500 =262,500
14tonnes of sharpsand@ 3,000= 42,000
28tonnes of granite@4500. =126,000
Labour. =105,000
Total. =N535,500

The total cost of the oversite concrete is N535,500
What's the mix ratio of cement, sand and aggregate and how many cubic meter of concrete are we talking here sir.....we are all learning.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by GoodFaith: 4:34pm On Mar 19, 2019
segzy14:
We will be attending to the above topic, that is the design,construction and other questions on 4bedroom bungalow using the plan below as a case study.



ABOUT SAMUEL AJOSE ENGINEERS LTD(S.A.E LTD)
S.A.E is an indigenous BUILDING AND CIVIL ENGINEERING COMPANY of dedicated and highly motivated Architects, Builders, Civil Engineers, Quantity Surveyors and Land Surveyor engaged in providing Professional services in the field of BUILDING and CIVIL ENGINEERING WORKS.
Our services are for both domestic and foreign Clients.

OUR VISION
To be the undisputed and dominant World Class Construction Company with Intergrity and Professionalism.

Our services include,

a) BUILDING AND CONSTRUCTION SERVICES
b) WE PROVIDE THE SERVICES OF PROPERTY AND PROJECT MANAGERS(e.g LANDS,HOUSES AND PROJECTS
c) ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS
d) BILLS OF QUANTITIES AND MEASUREMENT BILLS
e) REMODELLING, REHABILTATION AND RENOVATION WORKS
f) REAL ESTATE BROKERAGE AND CONSULTANCY


You can contact us through the following means;

Tel: +2347035596641
Whatsapp: +2347035596641
website :www.saelimited.com
Email: saeltd14@gmail.com and samuelajoseengineers@gmail.com



Fix it
They should be a door from kitchen to Dinning
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by temmy6996(m): 4:36pm On Mar 19, 2019
segzy14:
7. Damp proof membrane (DPM) = N20,800
Expatiate sir.

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by bumperno4: 4:40pm On Mar 19, 2019
smiley
segzy14:
We will be attending to the above topic, that is the design,construction and other questions on 4bedroom bungalow using the plan below as a case study.



ABOUT SAMUEL AJOSE ENGINEERS LTD(S.A.E LTD)
S.A.E is an indigenous BUILDING AND CIVIL ENGINEERING COMPANY of dedicated and highly motivated Architects, Builders, Civil Engineers, Quantity Surveyors and Land Surveyor engaged in providing Professional services in the field of BUILDING and CIVIL ENGINEERING WORKS.
Our services are for both domestic and foreign Clients.

OUR VISION
To be the undisputed and dominant World Class Construction Company with Intergrity and Professionalism.

Our services include,

a) BUILDING AND CONSTRUCTION SERVICES
b) WE PROVIDE THE SERVICES OF PROPERTY AND PROJECT MANAGERS(e.g LANDS,HOUSES AND PROJECTS
c) ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS
d) BILLS OF QUANTITIES AND MEASUREMENT BILLS
e) REMODELLING, REHABILTATION AND RENOVATION WORKS
f) REAL ESTATE BROKERAGE AND CONSULTANCY


You can contact us through the following means;

Tel: +2347035596641
Whatsapp: +2347035596641
website :www.saelimited.com
Email: saeltd14@gmail.com and samuelajoseengineers@gmail.com


Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 5:01pm On Mar 19, 2019
GoodFaith:


Fix it
They should be a door from kitchen to Dinning


Noted
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 5:03pm On Mar 19, 2019
temmy6996:

What's the mix ratio of cement, sand and aggregate and how many cubic meter of concrete are we talking here sir.....we are all learning.


See Oga himself. Twuale
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:43pm On Mar 20, 2019
9.Blockwork After Foundation

The blockwork is 11courses(coaches)high

68bags of cement @2500. = 170,000
Sharp Sand-1tipper. @38,000. = 38,000
3,400 nos of blocks@200naira. =680,000
Labour. 3500blocks x50naira. = 175,000

Total cost of blockwork. = N1,063,000

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 7:54pm On Mar 20, 2019
10. Lintel
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by completey(f): 3:21am On Mar 21, 2019
segzy14:
9.Blockwork After Foundation

The blockwork is 11courses(coaches)high

68bags of cement @2500. = 170,000
Sharp Sand-1tipper. @38,000. = 38,000
3,400 nos of blocks@200naira. =680,000
Labour. 3500blocks x50naira. = 175,000

Total cost of blockwork. = N1,063,000
Good job! Pictures pls?

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by joycluv: 7:03am On Mar 21, 2019
completey:

Good job! Pictures pls?
Seconded

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 11:39am On Mar 21, 2019
completey:

Good job! Pictures pls?


Please read the first write up on page one.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 12:50pm On Mar 21, 2019
10. Lintel

Concrete
41bags of cement @2500. =102,500
6tonnes of sharp sand@3000. = 18,000
12tonnes of granite @4,500. = 54,000
Labour. = 33,000
Total. = 207,500

Reinforcement
53lengths of 12mm@2250 = 119,250
44lengths of 10mm@1600. = 70,400
1/2 roll of binding wire@8,000. = 4,000
Labour. = 23,000
Total. = 216,650

Formwork
110numbers of1x12@1,000. = 110,000
52numbers of 2x3@ 250. = 13,000
Labour. = 25,000
1bag of nail. = 7,5000
Total. = 155,500

Grand Total. =N579,650
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by timesup234: 3:36pm On Mar 21, 2019
segzy14:
10. Lintel

Concrete
41bags of cement @2500. =102,500
6tonnes of sharp sand@3000. = 18,000
12tonnes of granite @4,500. = 54,000
Labour. = 33,000
Total. = 207,500

Reinforcement
53lengths of 12mm@2250 = 119,250
44lengths of 10mm@1600. = 70,400
1/2 roll of binding wire@8,000. = 4,000
Labour. = 23,000
Total. = 216,650

Formwork
110numbers of1x12@1,000. = 110,000
52numbers of 2x3@ 250. = 13,000
Labour. = 25,000
1bag of nail. = 7,5000
Total. = 155,500

Grand Total. =N579,650
your quotation on d very high side. 53 length of 12mm and 110 planks? Haba!!!

2 Likes

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 3:42pm On Mar 21, 2019
timesup234:
your quotation on d very high side. 53 length of 12mm and 110 planks? Haba!!!


Have you checked the size of the building and the number of windows,openings and doors?

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:02am On Mar 22, 2019
11. Headcourse
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 4:58pm On Mar 23, 2019
11. Headcourse
Concrete
15bags of cement @2500. =37,500
2.3tonnes of sharp sand@3000. = 6,900
4.6tonnes of granite @4,500. = 20,700
Labour. = 10,000
Total. = 75,100

Reinforcement
20lengths of 12mm@2250 = 45,000
16lenghts of 10mm@1600. = 25,600
1/2 roll of binding wire@8,000. = 4,000
Labour. = 8,000
Total. = 82,600

Formwork
1x12(reuse)
2x3(reuse)
Labour. = 7,500
1/2bag of nail. = 4,000
Total. = 11,500

Grand Total. =
N169,200

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:24pm On Mar 23, 2019
segzy14:
11. Headcourse
Concrete
15bags of cement @2500. =37,500
2.3tonnes of sharp sand@3000. = 6,900
4.6tonnes of granite @4,500. = 20,700
Labour. = 10,000
Total. = 75,100

Reinforcement
20lengths of 12mm@2250 = 45,000
16lenghts of 10mm@1600. = 25,600
1/2 roll of binding wire@8,000. = 4,000
Labour. = 8,000
Total. = 82,600

Formwork
1x12(reuse)
2x3(reuse)
Labour. = 7,500
1/2bag of nail. = 4,000
Total. = 11,500

Grand Total. =
N169,200

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:23am On Mar 24, 2019
12. Roofing

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:25pm On Mar 24, 2019
segzy14:
12. Roofing
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Muyi002(m): 4:26pm On Mar 25, 2019
timesup234:
your quotation on d very high side. 53 length of 12mm and 110 planks? Haba!!!

is this same as parapet
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by timesup234: 5:02pm On Mar 25, 2019
Muyi002:


is this same as parapet
i think he was talking about the lintel, not parapet
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 8:24pm On Mar 25, 2019
Muyi002:


is this same as parapet


It is lintel, the concrete fascia(parapet) was replaced with the headcourse.
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 9:56pm On Mar 25, 2019
12. Roofing
Carcass

50x50mm(2x2)Noggings-272numbers@350.
=95,200
50x75mm(2x3)Purlins-172numbers@450
= 77,400
50x100mm(2x4)Rafter-52numbers@600
= 31,200
50x100mm(2x4)Kingpost-10numbers@600
= 6,000
50x100mm(2x4)Struts- 96numbers@600
= 57,600
50x100mm(2x4)tie beam-48numbers@600
= 28,800
75x100mm(3x4)wall plate-22numbers@1000
= 22,000
7 bags of nail@8000. = 56,000
Tie rod. = 8,000
Carpenter Labour. = 90,000
Total. = N472,200

1 Like

Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Nobody: 6:41am On Mar 26, 2019
segzy14:
12. Roofing
Carcass

50x50mm(2x2)Noggings-272numbers@350.
=95,200
50x75mm(2x3)Purlins-172numbers@450
= 77,400
50x100mm(2x4)Rafter-52numbers@600
= 31,200
50x100mm(2x4)Kingpost-10numbers@600
= 6,000
50x100mm(2x4)Struts- 96numbers@600
= 57,600
50x100mm(2x4)tie beam-48numbers@600
= 28,800
75x100mm(3x4)wall plate-22numbers@1000
= 22,000
7 bags of nail@8000. = 56,000
Tie rod. = 8,000
Carpenter Labour. = 90,000
Total. = N472,200
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Asquare84(m): 8:23am On Mar 26, 2019
this is not interesting because there are no pictures attached
Re: 4 Bedroom Bungalow Enquiries on Design, Construction and Cost by Evaowokotomo(f): 9:28am On Mar 26, 2019
This is a demonstration sir to enlighten us, the floor plan is on page 1. He is just doing this to let us know the details and how much to build this type of house not that he is engaging on the project
Asquare84:
this is not interesting because there are no pictures attached

6 Likes

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (18) (Reply)

Is It Possible To Estimate The Cost Of Electrical Wiring Of A Duplex / Man Singlehandedly Saved A Filling Station From Burning Down. Photos And Video. / How Much Will It Cost To Finish This Building Please? (pics)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.