Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,357 members, 7,815,756 topics. Date: Thursday, 02 May 2024 at 05:47 PM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1160) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4385315 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1157) (1158) (1159) (1160) (1161) (1162) (1163) ... (3667) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 3:24pm On May 04, 2019
GoodFaith:


My brother 700K for labor?
Jesus help the contractors here not to kill us with over prices
Amen
I just finish two living rooms with dinner
Four bedroom en-suite
two storage
two kitchens
Two guest bathroom
Inside plastering I paid 180k
My goal was 140K-I just give the other 40k



Good indeed.
1) Please what rate do you pay your mason/service men and how many partitions do they accomplish?
2) Kindly post some pix of these plastering jobs your mason/service men have done.
3) Please which location precisely are these jobs done at that price?

Thanks.

1 Like 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by twinskenny(m): 3:36pm On May 04, 2019
You see the reason why we have shoddy job everywhere


Say no more.... a duplex is about to be pull down around Gbagada cause owner believe paying professional fees is wrong... how can u plaster a duplex in and out for 300k?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 3:58pm On May 04, 2019
bixton:


Good indeed.
1) Please what rate do you pay your mason/service men and how many partitions do they accomplish?
2) Kindly post some pix of these plastering jobs your mason/service men have done.
3) Please which location precisely are these jobs done at that price?

Thanks.

The job was great
Benin city
the rate is two bricklayer and one services to a room
bathroom is one bricklayer
that would have cost me about 134k but i just paid 180k
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 4:01pm On May 04, 2019
twinskenny:
You see the reason why we have shoddy job everywhere


Say no more.... a duplex is about to be pull down around Gbagada cause owner believe paying professional fees is wrong... how can u plaster a duplex in and out for 300k?

Ok
telling us the number of bricklayers to a room and a services?
What is the cost for one bricklayer and services?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by OALandAgents: 4:11pm On May 04, 2019
happy weekend
mufutau55:
Off-Topic Thread - To Discuss Anything and Everything that doesn't fit into an individual thread.
Let's discuss everything pertaining to Building Constructions, Real estate and some more.

Note: Please no products or services advertisements... there are plenty of other threads for that already. No buying and selling on this thread.

Hajji M.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 5:12pm On May 04, 2019
GoodFaith:


Ok
telling us the number of bricklayers to a room and a services?
What is the cost for one bricklayer and services?

Where do you source your own workers from cos me no understand how you plaster a duplex for 300k labour,or is it a 1 room duplex,please let’s be considerate and stop abusing labor,give what belongs to ceazar to ceazar
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23: 5:39pm On May 04, 2019
Teebawse:


Where do you source your own workers from cos me no understand how you plaster a duplex for 300k labour,or is it a 1 room duplex,please let’s be considerate and stop abusing labor,give what belongs to ceazar to ceazar

Seriously, the way people price ehhh
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by timesup234: 6:43pm On May 04, 2019
topsy23:


Seriously, the way people price ehhh
it is not price. 300k is over charge. I can even do it for 260k with nothing coming to my pocket as a contractor
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by timesup234: 6:44pm On May 04, 2019
bixton:



Good indeed.
1) Please how many partitions does this 5k daily pay(service/mason) collect?
2) Kindly post some of these plastering jobs your mason/service men have done.
3) Please which location precisely are these jobs done at that price?

Thanks.
A 12 by 12 room will cost you 8k, thats means the four rooms will cost you 32k before you move to other areas of the house

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Mubby4luv(m): 8:28pm On May 04, 2019
rotecch77:



To all member here, let me drop this here before i stop arguing about the quote the op brought here.

ALHAJI MUFUTA and all others concerned member needs to sanitized this tread before it will go south.

I dont claimed to be mr know it all, i dont know anything, all God knows things all.

But some peoples that do comes here to mislead people here which cleint(s) which few client will now beleived that some engr reap them off ( although some builder, engr, qs are bad) but we still have so many good profectionals here and outside here but due to some NON profectionals QUOTE, TALK, here make some of these profectionals always come to ready and move away without giving any VALUABLE COMMENTS again.

How can someone says that 250K WILL plaster 4BEDROOMS DUPLEX NOW A DAYS.

Just recently a member here gave me 4 bedroom duplex to palstered he is an Engr too.
The cost is more than 900k.( labour only)
Profectional knows that size of building determine the cost.
Single room in the said building was plastered by 4 Masons, (very big space/height). I have done 4 bedroom duplex for 1m plus, some 700k plus so all depends on size and location.


Now I get why you are trying so hard to defend the price. Surprisingly out of everyone that commented on this, you are the only one defending the qouted sum. Are you saying you are the only professional here? BTW this is an open forum, why you come de carry the matter for head like gele? I have said my peace .

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ak22(m): 8:31pm On May 04, 2019
timesup234:
i plaster two unit of 3 bedroom flats for 150k. Just say you dont know instead of assuming

Which location?
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 8:33pm On May 04, 2019
timesup234:
A 12 by 12 room will cost you 8k, thats means the four rooms will cost you 32k before you move to other areas of the house

Great.
By this your price and the previous quoted of 5k, it means the mason/service man collects probably 6k/2k per room. That's about 2k per partition (mason/service man).
So If you say 5k(mason/service man) as daily pay. It translates to just 2 partitions.
Or is there something I'm not understanding?

Also does this price include dressing of doors and windows internal?

I would very much like if you post pix of this great works.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 8:39pm On May 04, 2019
GoodFaith:

The job was great
Benin city
the rate is two bricklayer and one services to a room
bathroom is one bricklayer
that would have cost me about 134k but i just paid 180k



We know its 2 mason to 1 service man. But at what price do they do it? Is it per partition or on per daily pay ?
No one is in doubt of the great job.
It will be nice to see pix of the great job.
Even contractors, engineers and clients would even love to give such artisans jobs at such prices when its know that the works are appealing to the eyes.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:53pm On May 04, 2019
Mubby4luv:
Now I get why you are trying so hard to defend the price. Surprisingly out of everyone that commented on this, you are the only one defending the qouted sum. Are you saying you are the only professional here? BTW this is an open forum, why you come de carry the matter for head like gele? I have said my peace .


I just modified my previous message here.

But pls don't quote me again
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 8:54pm On May 04, 2019
twinskenny:
You see the reason why we have shoddy job everywhere


Say no more.... a duplex is about to be pull down around Gbagada cause owner believe paying professional fees is wrong... how can u plaster a duplex in and out for 300k?

Oga,
There's no need to argue the price. They are the ones doing the job.

Let them say how much is per partition or if its daily pay, how many partitions make up that pay?
And how many partitions are in the said duplex?


About 2013, my carpenter charged me 120k for roofing wood work/nogging for a simple 3 bedroom apartment. We used aluminium long span.
I told client. He called a friend in Benin who gave him someone who charged 60k. They drove down from Benin to Bayelsa. They were just 3. I got their quotes, purchased wood same day and they started work at about 2pm. They worked extra 3 days. The client paid hotel for them, the head man 5k room and the other stayed in a 3k room together.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by elengine: 9:24pm On May 04, 2019
bixton:


Oga,
There's no need to argue the price. They are the ones doing the job.

Let them say how much is per partition or if its daily pay, how many partitions make up that pay?
And how many partitions are in the said duplex?

OK while we are here deliberating on the reasonableness of Mason charges for plastering, I need a quotation for plastering this 4 bed room duplex plus a small room and a bq. The house is built on approximately 200 Sqm. It is a portable house and am attaching the Pic here. Sorry it is not that clear. The location is inside an estate at warewa, before Arepo

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Mubby4luv(m): 9:33pm On May 04, 2019
rotecch77:



I just modified my previous message here.

But pls don't quote me again
Whatever
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 9:58pm On May 04, 2019
elengine:


OK while we are here deliberating on the reasonableness of Mason charges for plastering, I need a quotation for plastering this 4 bed room duplex plus a small room and a bq. The house is built on approximately 200 Sqm. It is a portable house and am attaching the Pic here. Sorry it is not that clear. The location is inside an estate at warewa, before Arepo

In order to give a quote, the sizes of each room should be known.
Quotes are giving in number of partitions or per area of coverage(SQM) for both internal and external walls.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Arnoldfish(m): 10:17pm On May 04, 2019
On the issue of plastering, there is a normal plastering and there is guage plastering.

Sometimes the walls may not be straight and you may want the plaster guy to correct these block laying and casting mistakes. Sometimes may require chiselling and filling.

Some may require the use of range and pieces of tiles for leveling so as to achieve ruler straight walls and edges. All these are involved in the costing.

700k is actually on the high side, but not too much. No doubt 200k can do the same amount of job but the quality will definitely be different, well you have to be sure of what the higher quote guy can do.

Look at the dressing of the concrete fascia attached. You will notice tiles at intervals used to take guage then a range is used to smoothen. Even before the final dressing, the lines are already straight. You won't expect to achieve this with 250k.esp when you expect them to take their time.

1 Like 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 10:59pm On May 04, 2019
bixton:



Good indeed.
1) Please how many partitions does this 5k daily pay(service/mason) collect?
2) Kindly post some of these plastering jobs your mason/service men have done.
3) Please which location precisely are these jobs done at that price?

Thanks.
good evening house, this issues is very simple, let's him explaine how, it happened but for my experience in this work, I don't think is possible ,

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Royruky(m): 11:01pm On May 04, 2019
Arnoldfish:
On the issue of plastering, there is a normal plastering and there is guage plastering.

Sometimes the walls may not be straight and you may want the plaster guy to correct these block laying and casting mistakes. Sometimes may require chiselling and filling.

Some may require the use of range and pieces of tiles for leveling so as to achieve ruler straight walls and edges. All these are involved in the costing.

700k is actually on the high side, but not too much. No doubt 200k can do the same amount of job but the quality will definitely be different, well you have to be sure of what the higher quote guy can do.

Look at the dressing of the concrete fascia attached. You will notice tiles at intervals used to take guage then a range is used to smoothen. Even before the final dressing, the lines are already straight. You won't expect to achieve this with 250k.esp when you expect them to take their time.







Good write - up. I am however of the opinion that price is not always a function of the quality of the work. Price is sometime determined by the negotiating powers of the parties involved.

Most time when you approached a lawyer to prepare a deed of assignment for you, you are always tempted to conclude that the lawyer who charges more is more competent, but that is not truly the case.


The price is a function of the bargaining powers of the parties. The location no doubt plays an important role.

3 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Adedward(m): 11:01pm On May 04, 2019
timesup234:
i plaster two unit of 3 bedroom flats for 150k. Just say you dont know instead of assuming
which means u plaster 3 bedroom at rate of #75,000. I don't think it possible,
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 11:05pm On May 04, 2019
Adedward:
good evening house, this issues is very simple, let's him explaine how, it happened but for my experience in this work, I don't think is possible ,

Everything is possible.
He only needs to do the explanations to everyone's assimilation.
After that pix of the plastering works as done and let all decide.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Olazzeedris(m): 12:24am On May 05, 2019
timesup234:
another criminal. Pay him 250k for workmanship
Humm, You're correct! Omo baba bricklayer !
See there's big different btw life and death guess u knw?
But here i reference u as quack mind U not just quack, chief quack .
Anyway I can't blame u, why because you always deal within your remotes community. I guess you knw different btw ( building and house ) for intelligent fellows only! Probably give us the look of your just finished project !
Because I guess u dnt knw the meaning of bungalow mind you not just bungalow.
See here's not a platforms that you be posting trash.
Thanks too Eyin Agba to o jee ki ori mo tun tun o woo!
Twinskeny, Rotech ,Bixton Adedward &co.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Olazzeedris(m): 1:02am On May 05, 2019
Matter analyses!
Plastering /Rendering for ordinary A story building or
duplex /detached

Area of works
Bricklayers schedule as per oga quack in the building
1 Ground floor internal
2 Slab suffit
3 First floor internal
4 External Area
Mind you if your schedule is lyk dis you are a novice probably labourer .

Professional Schedule
1 Ground floor internal
2 Dressing of the windows ×
3 Fixings of doors frame and burglary bars ×
4 Soffits of the slab
5 First floor internal ditto as ground floor
6 External Rendering.
Now for each area listed above!
Budget you spend 75k according to you, now 75k x area by professional contractor. moreover 75k can't work minimum 100k

Note; that I star 2 items that's 2 & 3
Why?
TELL QUACK TO OBTAIN HIS FORM!

See henn we no go allow ,make u dey confused pple here. Lagosians are many here, means that Lagos Construction different. No be baam-baam ,obaa ko baa.
Elee baa ibi jee .

1 Like 1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 2:21am On May 05, 2019
bixton:


We know its 2 mason to 1 service man. But at what price do they do it? Is it per partition or on per daily pay ?
No one is in doubt of the great job.
It will be nice to see pix of the great job.
Even contractors, engineers and clients would even love to give such artisans jobs at such prices when its know that the works are appealing to the eyes.

bricklayers are 3k or 3500 and service are 2k or 2500
Benin

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 2:29am On May 05, 2019
Teebawse:


Where do you source your own workers from cos me no understand how you plaster a duplex for 300k labour,or is it a 1 room duplex,please let’s be considerate and stop abusing labor,give what belongs to ceazar - to ceazar
"stop abusing labor,give what belongs to ceazar to ceazar"--your comment is very disrespectful

I pay fair market value for services
Abusing labors for really dude, stop playing your contractor game
What do you pay bricklayer and services daily?
Benin Bricklayer 3k or 3500
services 2k or 2500 is that a fair market price?

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by GoodFaith: 2:31am On May 05, 2019
Lot of you here think you have game
that we are just slow
I am just siting back and watching lot of foolishness
U can just name your price for a services and I will say Yes sir or oga
Watch yourself people
There are lot OF people here who are playing games

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bixton(m): 5:53am On May 05, 2019
GoodFaith:


bricklayers are 3k or 3500 and service are 2k or 2500
Benin

So what's the output of work per day at this rate?
You are a paying client and you're supposed to be more explicit with numerous jobs done.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nozzle(m): 5:55am On May 05, 2019
see contractors trying hard to defend outrageous prices!!!
even some clients too are justifying outrageous prices they paid for plastering so they dont feel bad!
The truth is lagos especially lekki and environs prices are overhyped! simple and short!
contractors and workers are so spoilt in those areas. The funny thing is everyone is a contractor, even the masons and carpenters...nothing like daily pay! its terrible.
Some body is telling you in benin he paid daily rate and got it cheaper and plastered the same house you plastered in lagos with your entire life savings! you all are still arguing.

5 Likes

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nozzle(m): 6:35am On May 05, 2019
There has to be a standard for labour pricing, so we dont under-price workers and over-price clients. Funny enough there are more supply of labour in lagos than anywhere else, yet our prices are still roof-high.
@goodfaith,

i sent you a pm.

i have a project in ibeju lekki that am about to plaster, a 4bedroom duplex and a twin 2bedroom flat. i try to avoid labour from that lekki/ ibeju lekki axis, from experience , so i decided to cross water and get one from ikorodu. when the guy give me bill, i was in shock!.

1.65m internal external and fence!!. (i am pretty sure he saw the size of the building and ofcos the building was in lekki/ibeju lekki axis)

i told him if i see any client give him that kind of money for plastering, i myself will go and learn how to plaster. after a month he is begging for 700k! i still feel i can get it cheaper.

we grind hard for this money.

4 Likes

(1) (2) (3) ... (1157) (1158) (1159) (1160) (1161) (1162) (1163) ... (3667) (Reply)

Viewing this topic: kkonsults, kdaddy and 1 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 74
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.