Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Ravon: 8:16am On May 11, 2019 |
The Minister of Transportation, Mr Rotimi Amaechi, said 123km of the 156 km stretch of the Lagos-Ibadan standard gauge rail project has been completed. Amaechi made the disclosure on Friday during his routine inspection of the project along Kila, Olodo, Ilugun corridor of the track in the outskirts of Ogun State. He said the project had been completed up to Kila village, a settlement on the outskirts of Ogun towards Oyo State. “We are already moving towards Ibadan, the track laying is now in Kila, a town on the outskirts of Ogun. “In less than a month from now, we should be in Ibadan with the rate the work is going,” he said. The Minister also said that he would inspect the Apapa port and its connection to the standard gauge rail to address the challenges of traffic gridlock in the area. “We will be visiting the ports tomorrow to address some of the issues we have there. “It’s imperative that the Apapa ports must be connected to the standard gauge rail to ensure proper movement of cargoes,” Amaechi said. The source reports that the minister had during one of his inspection tours on April 8 blamed the China Civil Engineering Construction Corporation (CCECC) for the slow pace of work in the ongoing project. According to him, the Federal Government plans to commence transportation of cargoes from the seaports through the standard rail gauge by December. SOURCE: https://brandspurng.com/2019/05/11/contractors-successfully-completed-123-km-of-156-km-lagos-ibadan-rail-project/ 31 Likes 2 Shares
|
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by rusher14: 8:34am On May 11, 2019 |
33km and we are good. Let's do this. 80 Likes 5 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by etrouble: 8:40am On May 11, 2019 |
All hail Amaechi. All hail Buhari. I live around the railway corner, I see Amaechi more than I see my next door neighbor. He is always inspecting. Politics is investment, you invest your votes and you reap infrastructure and appointments. South-West gave Buhari 60% votes n 2015 and 55% votes in 2019. Now we are reaping our investment. The North gave Buhari 70% votes in 2015 and 75% in 2019. The North is reaping its investment. South-South and South-East gave Buhari about 5% votes in 2015 and 2019. The SS and SE too are reaping their investment. 254 Likes 20 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by juvewalex(m): 8:44am On May 11, 2019 |
When will the remaining kilometres be completed ? The line needs to start operations and kudos to you and your boss in Aso rock for seeing the project to its completion 54 Likes 4 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by bazzyblings: 9:17am On May 11, 2019 |
1 Like 1 Share |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by helinues: 9:17am On May 11, 2019 |
Finally All hail Buhari, Amaechi, Fashola, Apc in general Imagine in just 4 years oo Well done.. 85 Likes 8 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by ezebunafo(m): 9:18am On May 11, 2019 |
I pray you make it into the next cabinet to consolidate on the good works, they are surely speaking for you. 42 Likes 3 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by kaen1317: 9:18am On May 11, 2019 |
How about the ones in the SS and SE? 1 Like |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Onlinealaba(m): 9:18am On May 11, 2019 |
Politics aside.. PDP APC rift aside..this is a very commendable project..if all projects are executed and done same way like this we will surely get there.. Amaechi try on this, Fashola how far Check my signature, get your electronics, SMART TVs, air conditioners, washing machines and sound bars at affordable rate,payment on delivery, BUY4ME services available too with POD option 22 Likes 2 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by chloride6: 9:18am On May 11, 2019 |
etrouble: Send him my greetings when you have the time.. Tell him to please finish the coastal railway before 2023. I'll also tell Fashola to finish work on the 2nd Niger bridge. 23 Likes 3 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Nobody: 9:18am On May 11, 2019 |
etrouble: Yea the north is really reaping I can see 17 Likes 1 Share |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Melison(m): 9:18am On May 11, 2019 |
etrouble:The north is reaping?? 7 Likes |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by andysmith123(m): 9:18am On May 11, 2019 |
nice one |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by PUSSYBOY2: 9:19am On May 11, 2019 |
Damn...this is impressive! Very impressive! If every Gov have been doing it this way we would have gone far by now. Kudos to APC Govt, Ameachi has been doing great 35 Likes 3 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by hisexcellency34: 9:19am On May 11, 2019 |
It's a massive project. Buhari deserves commendation 22 Likes 1 Share |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by FSolar: 9:20am On May 11, 2019 |
So the railway is going to be completed before the highway!! Now,what's going to happen to IGR for police?? 22 Likes 1 Share |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Naija4love(m): 9:20am On May 11, 2019 |
Please report any bet post instantly 3 Likes |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by wonlasewonimi: 9:20am On May 11, 2019 |
Nigerians are gullible sha 4 Likes |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by suyamasta(m): 9:20am On May 11, 2019 |
Good but Shay we sopoz don pass this level sha |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Nobody: 9:22am On May 11, 2019 |
Great development. That's been the idea..then connect the rest of west by rail... For efficient transportation of farm produce from their farmand to Lagos... . please what's happening to.ib seaport..any update. Naija need more functional seaport.. 14 Likes 1 Share |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by suyamasta(m): 9:23am On May 11, 2019 |
hisexcellency34:I don't think so,. Massive is when all regions are linked properly enabling cross regional trading supporting industry/Agric as well as efficient movement of people! 3 Likes |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by LibertyRep: 9:24am On May 11, 2019 |
Something to cheer about. Thumps up to the government on this. 5 Likes |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by LaughButton01(m): 9:26am On May 11, 2019 |
first time I'll read about development on nairaland and there won't be criticism or Apc/PDP war, insult to buhari and tribal bigotry instead of praise... I think we are getting there so what does it take to maintain this type of sanity? lets let peace reign more 41 Likes 2 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Xander85: 9:26am On May 11, 2019 |
etrouble: You people are disgusting!....Seriously!!! 7 Likes 2 Shares |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by YorubaEmir: 9:27am On May 11, 2019 |
etrouble: Cheap blackmail 5 Likes 1 Share
|
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by oPPOSEE: 9:29am On May 11, 2019 |
Nigeria still doing roads in 21st century. For their mind, they are fulfiling election promises. Dunce. 1 Like |
Re: Contractors Successfully Completed 123 Km Of 156 Km Lagos-ibadan Rail Project by Nobody: 9:29am On May 11, 2019 |
suyamasta:all regions can’t be linked in 4years, but we’ll get there somehow 22 Likes 1 Share |
Alleged Forgery: Fresh Criminal Complaints Filed Against Tinubu / Battle Over IGP: Disquiet In Police As Adamu Retires On February 1, 2021 / Unqualified Imaan Sulaiman-Ibrahim Resumes As NAPTIP Boss, Buhari Keeps Mum
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 34 |