CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS - Properties (3) - Nairaland
Nairaland Forum › Nairaland General › Properties › CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS (41285 Views)
1 2 3 4 5 6 7 8 9 10 ... 19 Reply (Go Down)
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by SmartHomes(m): 9:27am On Nov 17, 2019 |
Following |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Umarzy(m): 9:42am On Nov 17, 2019 |
Why are you not posting pictures again. I mean, the progress of work |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 1:30pm On Nov 17, 2019 |
Umarzy:Due to uncontrollable circumstances & recent stringent measures put in place, henceforth. We will only be able to post milestones on this particular project... Thanks |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 1:32pm On Nov 17, 2019 |
Umarzy:At the completion of the foundation the thread will be updated thanks. Client has the final say on this particular work I hope you understand better. |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Umarzy(m): 3:49pm On Nov 17, 2019 |
Timtol:Yeah. Okay then |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 2:49pm On Nov 21, 2019*. Modified: 10:46am On Nov 22, 2019 |
... |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 2:50pm On Nov 21, 2019*. Modified: 10:45am On Nov 22, 2019 |
... |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by aleniboro(m): 12:09am On Nov 22, 2019 |
Good job sir! More power to your elbow! Please, what type of method to cast Parapet is the best out of this too sir? and what is the difference? which one is available? Please anyone that has the knowledge in this area as we are about to choose between the two and we did not have the knowledge of this.
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 8:26am On Nov 23, 2019 |
![]() |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 12:22pm On Nov 24, 2019 |
Timtol:Loading.... ![]() |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 8:33am On Nov 27, 2019 |
CONTACT INFO: CALL: +234-8100452977(calls and what's app), +234-8127167275 MAIL: dioritestructureslimited@gmail.com, dioritestructures@gmail.com VISIT:http://www.dioriteplanstudio.com.ng OFFICIAL WEBSITE http://www.dioritestructures.com.ng |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 4:57pm On Nov 29, 2019 |
Here we are ![]() |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 4:59pm On Nov 29, 2019 |
Raft base(Mat)
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 5:01pm On Nov 29, 2019 |
Raft beam @1200mm height
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 5:03pm On Nov 29, 2019 |
Formwork!!! The beauty of marine board with its pure result
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 5:05pm On Nov 29, 2019 |
Filling!! Done in just Two days
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:39pm On Nov 29, 2019 |
Soil compaction done,DPM laid in preparation for lean concrete.
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:40pm On Nov 29, 2019 |
Lean concrete done. 10bags of cement used to this excellent effect.
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:42pm On Nov 29, 2019*. Modified: 9:22pm On Nov 29, 2019 |
Oversite Concrete over lean concrete
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:44pm On Nov 29, 2019 |
Current update. More update on the next milestone. Thanks for following, questions will surely be handled and been more interactive,learning together ![]()
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:46pm On Nov 29, 2019 |
Foundation time span. 3weeks 3days. We ensure all stages is well handled for excellent work as for you know us for. |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 9:22pm On Nov 29, 2019 |
Timtol:Breakdown on cement! Blinding 18bags dry mix Raft beam and base 134bags Lean concrete 10bags Oversite Concrete 97bags. |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 10:11pm On Nov 29, 2019 |
Timtol:More views to make you fall in love ![]()
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 9:17am On Nov 30, 2019 |
Aerial View. More update after this milestone.
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 9:18am On Nov 30, 2019 |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 4:50pm On Nov 30, 2019 |
Timtol:Hence our headroom will be @3.7m. Any changes will be communicated. |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by kaysy(m): 5:09pm On Nov 30, 2019 |
Weldone sir, please can we supply with some materials like wires, electrical pipes and fittings or any other thing that can be sourced from Alaba international market Electrical pipe 25pieces of 25mm pipe is N3,500. 25pieces of 20mm pipe is N2,250.
|
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Umarzy(m): 6:33pm On Nov 30, 2019 |
Nice work ![]() |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 6:34pm On Nov 30, 2019 |
kaysy:Noted! Thanks |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 6:34pm On Nov 30, 2019 |
Umarzy:Yeah! Thanks |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Umarzy(m): 6:39pm On Nov 30, 2019 |
Why lean concrete. Why not oversite concrete on DPM directly ? |
| Re: CONSTRUCTION Of A 5bd/rm Duplex @OSAPA LONDON LEKKI LAGOS by Timtol(op): 7:10pm On Nov 30, 2019 |
Umarzy:First of all will like to share a popular idea on lean concrete. Main function of the lean concrete is to provide the uniform surface to the foundation concrete and to prevent the direct contact of foundation concrete from the soil. Lean concrete is used under the foundations. It is good for providing a flat bottom in uneven or dirt terrain. The following method is used here: Filling with sharp sand Wetting of the the filled surfaces Ramming for soil compaction DPM put in place all over the surfaces except the Runner points Lean concrete thereafter Iron works(decking works) with the uniform surface the lean concrete provided, check previous images uploaded for clarifications Casting of German floor. With this it's certain no contact with anything called soil or dampness. I believe should answer your question. |
Construction Of A 4bd/rm Duplex Benin City, Edo State • Construction Of A 5bd/rm Duplex With A 2flat Bq Lekki Peninsula • Construction Of A 4bd/rm Duplex With A Bq @Abeokuta by Dioritestructures • 2 • 3 • 4
Abuja Property Dealers/agents Let Us Meet Here. • The Nigeria Retirement Home Mastering The Odyssee • Exclusive!!! | Twenty Two "2" Bedroom House Plan



