Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,546 members, 7,819,939 topics. Date: Tuesday, 07 May 2024 at 07:08 AM

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (1309) - Nairaland

Nairaland Forum / Nairaland / General / Properties / General Topic Thread-To Discuss Anything And Everything in Building Construction (4402187 Views)

Discuss Anything Property And Lets Make Money In The Process / Residential Building Construction Mistakes In Nigeria You Need To Avoid / General Topic Thread - The Roforofo Thread Of Construction Activities (2) (3) (4)

(1) (2) (3) ... (1306) (1307) (1308) (1309) (1310) (1311) (1312) ... (3669) (Reply) (Go Down)

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Perfecttouchade: 7:18am On Jan 31, 2020
Delivering a quality and durable aluminium services at Perfect Touch Aluminium is what we work on, kindly contact us for your windows {Casement, Sliding, curtain walls,Projected windows},frameless doors{aluminium bathroom doors}, partitioning etc. Tel& WhatsApp 08153665659. Quality assurance delivery

1 Share

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Bankyshinani(m): 8:13am On Jan 31, 2020
Charisdesigns:


Nothing can replace anything that is properly done, however if your soil is relatively stable and not prone to water problems, you can go ahead and compact it well, if possible place hardcores, then floor


I don't understand what you mean by placing hardcore
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dbshaywhy(m): 9:00am On Jan 31, 2020
Charisdesigns:


It is better to get things done properly now that you are still in this stage....

Doing your German floor now will save you from lot of headache later

From experience here are some advantages we have noticed German flooring have over normal flooring

1) German floor is also part of the foundation, it should be seen as a structural elements that makes your house to stand. Loads transmitted from the building is recieved by the German floor before transferring to the foundation

2)German floor stops the upward movements of water from the soil into your building. I am sure you wouldn't want your walls to be damp or see algae grow on it.

Lastly, oversite concrete can Serve as a breaking point when there is a non major crack to the wall, it prevents this crackline from getting to the foundation.

About the cost estimate, you will have to provide the plan as that will serve as basis for the estimation

CharisDESIGNS

Waw, this your reasons made me have a total change of mind of doing the oversite concrete.
Can you please dm me ur whatapp contact to discuss better.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by uncleteeh(m): 9:16am On Jan 31, 2020
Do you want a structure like no other? We design and construct so as to make our designs more realistic. contact us today and we will deliver to you the best. OAK Group. 08108408732 uncleteeh@gmail.com
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by khadii1: 9:45am On Jan 31, 2020
Muyi002:
This is my cost below from ground to parapet level. I actually didn't do German Floor after foundation. I am looking to do that now

Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000

Blinding
Cement - 30 bags @ 2500 = 75,000
Sharp Sand - 20 tonnes = 32,000
Granite - 25 tonnes = 105,000
Total = 212,000

Foundation Block Setting & Sock away Pit
Blocks = 1400 @ 150 = 210,000
Cement - 30 bags @ 2400 = 72,000
Sharp Sand =15 tonnes = 24,000
Labour for Soak away = 62,000
Extra Labour Expenses = 20,000
Total = 388,000

Foundation Filling
Labour = 92,000
Laterite = 326,000
Total = 418000

DPC - Half
DPM Nylon = 11,500
Granite= 10 tonnes = 45,000
Tara = 10 tonnes =13,000
Sharp sand = 10 tonnes = 15,500
Planks - 25 pieces & nails = 25000
Iron
16mm - 4 lengths @4400 = 17600
8mm - 3 lengths @ 1250 = 3750
Binding wire =2500
Transport = 2500
Workmanship
Labourer = 40000
Welder and carpenter = 13000
Cement = 28 bags @ 2500= 70000
Wire Mesh = 10500
Total = 273,000

Above Foundation Block setting + 2 soak away pits
Blocks 4100 @ 150 = 615000
Water = 3000
Sharp sand = 36000
Joining sand = 18000
Cement @2500 =162500
labour = 56000
Total = 891000

Lintel and Pillars Casting
16mm - 8 lengths @ 3630 = 29040
8mm - 31 lengths @ 1030 = 31930
12mm - 34 lengths @ 2050 = 69700
1 binding wire = 4000
Transport & logistics = 4000
Wood and planks ➕ TP = 51000
Granite = Used remains
Sharp sand = 15000
Cement = 30 bags @ 2500 = 75000
Workmanship
Labour 40000
Carpenter 22000
Iron bender 17000
Total =360000

Parapet and soak away Casting
Iron plus
12mm - 30 lengths @ 1970 = 59100
8mm - 51 lengths @ 1420 = 72420
Big Binding wire @ 7000
Extra iron = 9000
Quarter rod - 15 lengths @ 200 = 3000
Transport = 3500
Workmanship = 25000
Wood and cutting = 175000
Nail = 11100
Transport = 4000
Workmanship = 40000
Granite = 20 tonnes = 100000
Sharp sand = 15 tonnes = 21000
Cement 50 bags @ = 130000
Labour = 50000
Total = 710,000

Electrical (wall pipe installations)
20mm pipe = 2 bundles @2100
25mm pipe = 1 bundle @ 3200
Electrical materials = 14000

Workmanship =9000

Total = approximately 3.5M


I wish I can get such detailed cost for my project.
Labour wants 70,000 for paraset.
Carpenter wants 70,000
Welder wants 70,000.
Omo onile wants 150,000 before we start roofing
The street association wants 10,000 for foundation and 70,000 for light.
Site is Iju after winners.
Frustrating!!
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dbshaywhy(m): 10:34am On Jan 31, 2020
dbshaywhy:
Good day friends, here is a 3 bedroom flat and 2 room and parlour self contained foundation as shown in the picture.
Filling is on going presently, next after that is the setting of the blocks to the final level.
My enquires are;
How many blocks will it required?
How many bag of cement and cost of sand (mind you, there will be 15 pillars)?
Can it later be floored after block setting, mind you, am using 9 inches block all through?
Thanks in anticipation.


Good morning to all beautiful heart Nairalanders and a big thanks to your quick response.
At some responses, some are asking for building plan/sketch or design but the fact is I only bought that property like that tru my uncle. It's an half plot of land, 30 by 100 with 3 bedroom and 2 unit of room and parlour self contained foundation with each rooms with its toilets and bathrooms, no dining room. The former owner almost used up all d land. The left over at the left and sides wil not b more than 3-4ft and 4-5ft respectively and the back side 3-4ft too.
A good hearted one could further assist me please.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 10:52am On Jan 31, 2020
Bankyshinani:

I don't understand what you mean by placing hardcore

Hardcores are large aggregate's or simply put crushed stones like your normal granite, but this time in bigger size.

Although somepersons use broken bricks/blocks rumble for hardcores.

Generally hardcores provide strength to foundation, and most be systematically placed for evenness.

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 10:53am On Jan 31, 2020
dbshaywhy:

Waw, this your reasons made me have a total change of mind of doing the oversite concrete.
Can you please dm me ur whatapp contact to discuss better.

08027314343
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by dbshaywhy(m): 11:15am On Jan 31, 2020
Good morning to all beautiful heart Nairalanders and a big thanks to your quick response. 
At some responses, some are asking for building plan/sketch or design but the fact is I only bought that property like that tru my uncle. It's an half plot of land, 30 by 100 with 3 bedroom and 2 unit of room and parlour self contained foundation with each rooms with its toilets and bathrooms, no dining room. The former owner almost used up all d land. The left over at the left and sides wil not b more than 3-4ft and 4-5ft respectively and the back side 3-4ft too.
A good hearted one could further assist me please.

I think I finally comes with a sketch.
Mind you, the dotted point will be for pillars and I wish the sitting room could step down, will this still be achieve by doing the oversite concrete?

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 12:22pm On Jan 31, 2020
Building materials require honesty, its not cheap, don't put it in the hand of just anybody. The price you pay is faithfulness & honesty.

Build right
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Bankyshinani(m): 2:24pm On Jan 31, 2020
Charisdesigns:


Hardcores are large aggregate's or simply put crushed stones like your normal granite, but this time in bigger size.

Although somepersons use broken bricks/blocks rumble for hardcores.

Generally hardcores provide strength to foundation, and most be systematically placed for evenness.
okay now I understand
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Sosqui: 3:35pm On Jan 31, 2020
Azino1984:
Imaging what a family asked me to pay at parafa-ikorodu before I could build in the land they sold to me. Foundation #60k, Iwe-ebi #150k, Crops/grass #40k, Security #60k, decking #150k, Roofing #60k, Akowe/Youth #50k, Fencing #70k. This is coming after you might have paid for the land. The government should do something about this especially Lagos government
Please note that any form of Omonile is illegal in Lagos but I will advice you use wisdom. Negotiate to beat down the prize. Good luck
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 4:00pm On Jan 31, 2020
dbshaywhy:


Can I get a rough estimation of the oversite concrete and even assist with the sketching of the building if have any (3 bedroom flat and 2 room and parlour self with each room avin it's toilets, no dining room) ?

You can. That's not a problem
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 4:05pm On Jan 31, 2020
emmanuelike:
If I can get rough estimate for this student hostel. I'll appreciate.

8 single room(Sr) (with 4 toilets(Tb) (erroneously inserted it twice. D idea is for 2 rooms to share 1 toilet.

Then 6 selfcon single room too.

Attached is rough scetch I made

Depending on location and quality of finishes 6-8m
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by boay(m): 4:09pm On Jan 31, 2020
dbshaywhy:
Good morning to all beautiful heart Nairalanders and a big thanks to your quick response. 
At some responses, some are asking for building plan/sketch or design but the fact is I only bought that property like that tru my uncle. It's an half plot of land, 30 by 100 with 3 bedroom and 2 unit of room and parlour self contained foundation with each rooms with its toilets and bathrooms, no dining room. The former owner almost used up all d land. The left over at the left and sides wil not b more than 3-4ft and 4-5ft respectively and the back side 3-4ft too.
A good hearted one could further assist me please.

I think I finally comes with a sketch.
Mind you, the dotted point will be for pillars and I wish the sitting room could step down, will this still be achieve by doing the oversite concrete?

It is better now that you have a sketch but the dimensions are missing
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by remioshy(f): 5:51pm On Jan 31, 2020
Hello All

Please can anyone recommend a good kitchen cabinets fitter/ installer that knows what they are doing . Based in Lagos preferably

Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Person2person(m): 6:53pm On Jan 31, 2020
remioshy:
Hello All

Please can anyone recommend a good kitchen cabinets fitter/ installer that knows what they are doing . Based in Lagos preferably

Thanks

you can contact us for your kitchen cabinets design, fabrication and installation....

call /wasap 08063073913
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by remioshy(f): 6:55pm On Jan 31, 2020
Thanks
Person2person:


you can contact us for your kitchen cabinets design, fabrication and installation....

call /wasap 08063073913
Thanks. Have you done any work for anyone here on Nairaland that I can ask for review

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Person2person(m): 7:51pm On Jan 31, 2020
remioshy:
Thanks
Thanks. Have you done any work for anyone here on Nairaland that I can ask for review

I have not work for anyone on nairaland, but I can assure you that you might be the first to start recomeding us to other nairalander.

you won't regret giving us a chance to design your kitchen.
.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by mufutau55(m): 8:00pm On Jan 31, 2020
remioshy:
Hello All
Please can anyone recommend a good kitchen cabinets fitter/ installer that knows what they are doing . Based in Lagos preferably
Thanks

A guy named Brainconceptz at 08034214305 (Voice/Whatsapp) with threads in this forum has done many jobs for me. I surely recommend him.
Thanks.

@Brainconceptz

https://www.nairaland.com/3968774/contact-us-furniture

Hajji M.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 8:42pm On Jan 31, 2020
I was developing a three and a two bedroom apartment on the same plot of land sometime ago but stopped because the person overseeing it was siphoning funds.

I have decided to travel down to oversee things myself during my annual leave. How much work can be realistically done in two weeks? Both buildings are at lintel level(lintel has been done)

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by uncleteeh(m): 8:52pm On Jan 31, 2020
rationalmind:
I was developing a three bedroom and a two bedroom apartment on the same plot of land sometime ago but stopped because the person overseeing it was siphoning funds.

I have decided to travel down to oversee things myself during my annual leave. How much work can be realistically done in two weeks? Both buildings are at lintel level(lintel has been done)



where is the site location?
I am an architect and a builder.
can help you over see the affairs.
You can trust us at OAK Group.
08108408732
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 9:02pm On Jan 31, 2020
rationalmind:
I was developing a three bedroom and a two bedroom apartment on the same plot of land sometime ago but stopped because the person overseeing it was siphoning funds.

I have decided to travel down to oversee things myself during my annual leave. How much work can be realistically done in two weeks? Both buildings are at lintel level(lintel has been done)





If your funds are right, you can get to turn key stage in 2 or max 3 weeks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 9:04pm On Jan 31, 2020
uncleteeh:

where is the site location?
I am an architect and a builder.
can help you over see the affairs.
You can trust us at OAK Group.
08108408732

undecided
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 9:06pm On Jan 31, 2020
Charisdesigns:

If your funds are right, you can get to turn key stage in 2 or max 3 weeks

Wow shocked

Thanks
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by remioshy(f): 9:51pm On Jan 31, 2020
Thanks a lot. Will do
mufutau55:


A guy named Brainconceptz at 08034214305 (Voice/Whatsapp) with threads in this forum has done many jobs for me. I surely recommend him.
Thanks.

@Brainconceptz

https://www.nairaland.com/3968774/contact-us-furniture

Hajji M.
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by remioshy(f): 9:52pm On Jan 31, 2020
Ok. Will get in touch. Thanks
Person2person:


I have not work for anyone on nairaland, but I can assure you that you might be the first to start recomeding us to other nairalander.

you won't regret giving us a chance to design your kitchen.
.


Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:53pm On Jan 31, 2020
The detailed cost if the project was an idea I got from Segzy post on nairaland.

That is Lagos way of ripping off the land owners. My site is located in ilorin.

khadii1:



I wish I can get such detailed cost for my project.
Labour wants 70,000 for paraset.
Carpenter wants 70,000
Welder wants 70,000.
Omo onile wants 150,000 before we start roofing
The street association wants 10,000 for foundation and 70,000 for light.
Site is Iju after winners.
Frustrating!!
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:55pm On Jan 31, 2020
The detailed cost if the project was an idea I got from Segzy post on nairaland.

That is Lagos way of ripping off the land owners. My site is located in ilorin.

God bless

khadii1:



I wish I can get such detailed cost for my project.
Labour wants 70,000 for paraset.
Carpenter wants 70,000
Welder wants 70,000.
Omo onile wants 150,000 before we start roofing
The street association wants 10,000 for foundation and 70,000 for light.
Site is Iju after winners.
Frustrating!!
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:56pm On Jan 31, 2020
Charisdesigns:

If your funds are right, you can get to turn key stage in 2 or max 3 weeks

My brother I don’t think you can get this done in 2-3weeks in Nigeria.
Don’t forget the building is at lintel stage.

Can you achieve these in the said time.

. Block settings to the final level.
. Concrete facial (optional)
.Roof cacas .
.Roof covering.
. Plastring in and out.
.Electrical work
.plumbing work
Burglary bars, doors, window
.pop or any ceiling work.
. Screeding. (Optional)
.Tiling
.All external work I.e suck away, septic tank, bore hole, compound flooring, fencing and many more.

1 Like

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:58pm On Jan 31, 2020
Chekitaut:
Waoooooh lovely expenditure your lintel is not chain & no dpc... you shld hv factor in crack frm foundation due to settlement of soil.

This was what I did before put blocks above the foundation

Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Chekitaut: 10:03pm On Jan 31, 2020
Muyi002:


This was what I did before put blocks above the foundation
pouring weak concrete in block holes righ?

(1) (2) (3) ... (1306) (1307) (1308) (1309) (1310) (1311) (1312) ... (3669) (Reply)

Viewing this topic: 2 guest(s)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 55
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.