Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta (3098 Views)

Lovely 6 Bedroom Fully Detached Duplex (smart Home)with A Room Bq / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost / Proposed Renovation And Completion Of 5bedroom BUNGALOW (2) (3) (4)

(1) (2) (Reply) (Go Down)

Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:29am On Mar 05, 2020
Fellow Engineers and Builders, Join me in this journey as we take on the task of completing a 4 bedroom duplex in Abeokuta... and of course it is a SMART HOME

Client: A Nairalander
Location: Abeokuta, Ogun State


I will try and update everyone daily about site activities and I am open to advice and suggestions.
Project Details
Ground FLOOR Features
some section of the ground floor are existing already but we will be modifying some sections and we will be adding an extension to accommodate an office
1 Main Sitting Room (existing)
1 Dining room void at the top with staircase
1 Bedroom Ensuite (existing)
1 KItchen with a store
1 office with conveniences
1 conference room


First Floor Features
3 bedroom ensuite
1 living room with balcony
1 Gym
1 laundry room
1 central Lobby

The task at hand is to incorporate the proposed extension and bring it up to the same level as the existing building on site

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:24pm On Mar 07, 2020
According to the drawings, a new extension to be joined to the existing structure on site of the proposed duplex and we need to add columns to two different location within the the existing building for the sake of structural stability.

Setting out and excavation of the proposed extension part of the building started already

1 Like

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:28pm On Mar 07, 2020
We poured the foundation blinding and casted the column footings(1200 X 1200)

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:31pm On Mar 07, 2020
I had to be so firm about the depth of my foundation and columns with the labourers, these are areas where they usually do what is most comfortable to them.. grin grin
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:37pm On Mar 07, 2020
We have started raising the Foundation blocks to DPC level already and hopefully by Monday 9/3/2020, we will start backfilling...

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 11:41pm On Mar 07, 2020
We got two 4000litres of Storex tank @70,000 each for this Project and we are planning to drill a borehole next week

1 Like

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:55pm On Mar 12, 2020
We backfilled the foundation of the extension yesterday and we casted the DPC today

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:19pm On Mar 12, 2020
Laying of DPM

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:28pm On Mar 12, 2020
And so we casted the DPC today grin , even though the mixing machine we used broke down at some point, but it came back to life

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:32pm On Mar 12, 2020
We are using hand moulded Blocks for this project, You can see my guys handling that for me

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Nobody: 8:01pm On Mar 13, 2020
Following!!

God bless Hardworking Engineers like you
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by peterock100: 11:06pm On Mar 13, 2020
Hargbo:
Laying of DPM

Please what is DPC because all I'm seeing is black nylon?
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:16pm On Mar 14, 2020
peterock100:


Please what is DPC because all I'm seeing is black nylon?
The Black Nylon is a Polythene that serve as our DPM (damp-proof membrane) and it is a membrane material applied to prevent moisture transmission. We laid it before casting our concrete slab.

1 Like

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by pman06(m): 9:13pm On Mar 14, 2020
Which part of abeokuta is this? Can you tell us how much building such might cost? Or how much is involved. The
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 9:17pm On Mar 15, 2020
pman06:
Which part of abeokuta is this? Can you tell us how much building such might cost? Or how much is involved. The
The Location is confidential but the Proposed Budget at the time of inception of this project is 18.5million
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:59am On Mar 16, 2020
Present stage of work on site, we have successfully raised the extension to Lintel level

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by peterock100: 12:51pm On Mar 16, 2020
Hargbo:

The Black Nylon is a Polythene that serve as our DPM (damp-proof membrane) and it is a membrane material applied to prevent moisture transmission. We laid it before casting our concrete slab.

Thanks bro
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 2:57pm On Mar 25, 2020
Casting of a drainage Wall in front of the house

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 3:39pm On Mar 25, 2020
We are done with the Ground Floor and all Structural elements are well placed to receive the First Floor..

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 3:50pm On Mar 25, 2020
I estimated the cost of buying woods I needed to cast the formwork for the First floor slab + workmanship to be around 750k..

And to rent the same wood + workmanship is around 320k..

.So I eventually opt for wood rentage to save cost...

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 12:42pm On Mar 28, 2020
Cost of Decking Formwork + Workmanship.. 320,000naira

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:40pm On Apr 05, 2020
My Team was able to finish the Construction of Formwork in Four days

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:44pm On Apr 05, 2020
During the construction of Formwork, we were able to drill and install a Borehole system on the property for easy access to Water. I need more than enough water to cast the First Floor Slab

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 5:55pm On Apr 05, 2020
With the guide of a detailed Structural Drawing, we started Reinforcement arrangement... I gave my Iron Bending team 3days to conclude reinforcement arrangement and my plumbing and electrical team two days and they were able to deliver.

My aim was to cast the First-floor slab before the Lockdown begins on Saturday, April 4 in Abeokuta, and we were able to finish all Formwork, Reinforcement, Plumbing and Electrical work on Thurs, April 2, 2020

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:09pm On Apr 05, 2020
Friday April 3, 2020

We cast the First Floor Slab without any issue, we started the casting around 9 am and we finished around 6 pm in the evening

Material Used
45 tons of 3/4 Granite
5 trailer buckets of Sharp Sand
180 bags of cement
2tons of 16mm reinforcement
4tons of 12mm reinforcement
60 nos of 10mm reinforcement
2 bundles of Binding Wire
About 9000litres of water
Planks and Bamboo for Formwork

Equipment Used
2 mixing Machine @ 15K per day
40 nos of Labour
6 Masons
Concrete Vibrator

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:12pm On Apr 05, 2020
more pics

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 6:15pm On Apr 05, 2020
and more more pics

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 7:16am On May 03, 2020
Happy Corona Lockdown everyone.

I leveraged on the Corona Lockdown to start moulding the Blocks I will need to raise the first Floor.

Now we have about 4200 blocks ready for use.

All things be in equal We will start raising the first floor walls on Monday..

For the 4200 blocks, I used about 140bag of cement to mould it

Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hum2020: 7:52am On May 03, 2020
@Hargbo what a nice job congratulations pls how much did cost you get borehole done thanks
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by Hargbo(m): 8:05am On May 03, 2020
Hum2020:
@Hargbo what a nice job congratulations pls how much did cost you get borehole done thanks
Survey - 30k
Drilling and Installation - 600k

They will also manage it for a Year, I have been working with them for a while now and they are very good in what they do.
Where is your Location?
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by money121(m): 8:17am On May 03, 2020
Baba let handle this Roofing project ooo

Help my roofing ministry

Edakun grin
Re: Construction And Completion Of A Four Bedroom Duplex (Smart-Home) In Abeokuta by money121(m): 8:18am On May 03, 2020
Hargbo:
With the guide of a detailed Structural Drawing, we started Reinforcement arrangement... I gave my Iron Bending team 3days to conclude reinforcement arrangement and my plumbing and electrical team two days and they were able to deliver.

My aim was to cast the First-floor slab before the Lockdown begins on Saturday, April 4 in Abeokuta, and we were able to finish all Formwork, Reinforcement, Plumbing and Electrical work on Thurs, April 2, 2020

Baba let handle this Roofing project ooo

Help my roofing ministry

Edakun

2 Likes

(1) (2) (Reply)

4 Units Of 3bedroom Flat For Sale @ Surulere.... Price...65m / A Very Good Land For Sale In Port-harcourt, Rivers State / Simple Way To Determine Painting Charges.

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.