Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December - Politics (2) - Nairaland
Nairaland Forum › Nairaland General › Politics › Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December (14771 Views)
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Bifrost: 8:07am On Oct 02, 2020 |
SmartProf:Don't you think using "impressive" to describe the current Nigerian rail development in this administration is rather high praise? Have you seen the trains? They're like upgraded versions of the trains used in the 40's. In 2020, not one high speed/bullet train. Perhaps a fair enough development, certainly not impressive. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by leisuretym: 8:08am On Oct 02, 2020 |
same Lagos Ibadan rail you claimed to have completed in 2019? these people are drunk |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by anonimi: 8:08am On Oct 02, 2020 |
SmartProf:Done well with plenty lies, before, during and after their term of change plus next level? www.nairaland.com/attachments/2831519_stealingamaechi_jpegad74e2c90a1a5fd1bd932c3319614bc3 YouthsPC0: Nigeria Halts China Railway Firm In Its Tracks |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Nobody: 8:08am On Oct 02, 2020 |
valentineuwakwe:Campaign gini? This administration is not like the others we are used to. It's a proactive administration. ![]() |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Dennisana(m): 8:10am On Oct 02, 2020 |
When this means of transportation is sorted out properly. The traffic gridlock on our roads will reduce drastically. Call 07039566136 for your Company Registration enquiries https://instagram.com/cac.registration?igshid=usgu3a7epo55
|
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Aether(m): 8:11am On Oct 02, 2020 |
I refuse to say anything yet until we see the reality, cos in this country everything is a projection. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Bifrost: 8:12am On Oct 02, 2020 |
BTW, I thought the Lagos–Ibadan rail has been completed and ready for use. Or are they planning on building another? |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by valentineuwakwe(m): 8:12am On Oct 02, 2020 |
is this a campaign promise or a realistic target? anyway they better fix it on time as that road is of strategic importance to the nation! |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by anonimi: 8:13am On Oct 02, 2020 |
SilverNorGold:Proactive liars, you mean? www.nairaland.com/attachments/4024299_bubu6_jpeg86aaf8fa6cd32a5104ab6bf996dd1ee3 www.nairaland.com/attachments/3356469_screenshot20160131120000_jpeg639beaec46d4ced684f639998a489af2 titiloyeblog:www.nairaland.com/attachments/10652224_screenshot20191130005132_png5988875e796be33b1cfd3e2644cb5c36 www.nairaland.com/attachments/8711769_fbimg1549641325339_jpegb89d32cf87812989a5d2856fd75eb5b5 |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by anonimi: 8:14am On Oct 02, 2020 |
valentineuwakwe:. Is he talking about road or talking about railways ![]() |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Godisgreatest1: 8:22am On Oct 02, 2020 |
Amaechi is clearly the best minister in this administration. I have used the Abuja-Kaduna Rail line, it was a memorable shuttle. I just hope the rail lines will connect the entire country. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Gval123: 8:23am On Oct 02, 2020 |
That is exactly what u see in the news whenever you turn on the TV in a hopeless country like Nigeria. All una mate don leave una, na now una still day proud to construct Moscow railway. Dead country |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by chris51(f): 8:24am On Oct 02, 2020 |
Seerade029:I pray so |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Youngzedd(m): 8:26am On Oct 02, 2020 |
Seerade029:That one has turned to audio project. I don't know why they neglected it since 2016. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Komu1048(m): 8:26am On Oct 02, 2020 |
Seerade029:Jus keep quiet, u shouldn’t have included farmers into your imaginary progress. If u r not a farmer keep quiet |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by opribo(m): 8:28am On Oct 02, 2020 |
I think its about time we introduce a new way of making every minister of the federal republic pick a date every month to answer to the people. The has become necessary since some of them can just keep say anything and get away with it. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Nobody: 8:28am On Oct 02, 2020 |
anonimi:Blame the Chinese, Amaechi's hands were tied. ![]() It was suspended by the Chinese and the excuse they gave me was that they cannot allow it run because of safety, since they have not completed the second line.
|
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by ThatFairGuy1: 8:30am On Oct 02, 2020 |
SmartProf:Hypocrite. I know why you are Keen to always single out Amaechi for praise in this administration. Alas, that your agenda has FAILED right from its initiation |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by VaselineCrew: 8:30am On Oct 02, 2020 |
Take money from Niger-Delta to build rail in Lagos, then all those small boys will tell same Niger-Deltans in Lagos to go back to their village. Soon this country will be divide, by GOD's special grace, Amen!! |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by flyingpig: 8:33am On Oct 02, 2020 |
SmartProf:I commend this administration very well on rail transportation but since heavy duty vehicles weaken our poorly constructed roads quicker than SUVs I would think too that cargo rails are our priorities over passenger rails. Where the latter can go when the former are already in place. Tankers crashing and igniting fire are still modern news in Nigeria o |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by SmartProf(m): 8:33am On Oct 02, 2020 |
ThatFairGuy1:Satisfy your ignorance and stupidity...as far as freedom of speech is allowed, even a fool has an opinion. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by SmartProf(m): 8:34am On Oct 02, 2020 |
flyingpig:Very wise input...Seconded. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by anonimi: 8:34am On Oct 02, 2020 |
SilverNorGold:Tied to the confessional box for a well deserved punch. anonimi: |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by ThatFairGuy1: 8:36am On Oct 02, 2020 |
SmartProf:Stop foaming from sides of your mouth. Bloody Hypocrite
|
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Nobody: 8:37am On Oct 02, 2020 |
anonimi:Hahaha, my beloved brother. Abeg make we try dey appreciate better thing for once jor. No be everytime we go dey complain. God bless you, bro.. God bless me. God bless the Federal Republic of Nigeria. ![]() |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by segebase(m): 8:38am On Oct 02, 2020 |
t |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by anonimi: 8:40am On Oct 02, 2020 |
flyingpig:He inherited cargo railways but as usual wrecked it with the same incompetence that ruined our economy. anonimi:https://shipsandports.com.ng/wp-content/uploads/2018/01/NRC-train-350x205.jpg NRC moves 3,200 tonnes of goods from Lagos ports in Julywww.nairaland.com/attachments/2045441_image_jpeg9f360c5ab7736510df54c882e9dbf188 |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by SmartProf(m): 8:40am On Oct 02, 2020 |
ThatFairGuy1:Frustration has finished this one, you better go and be useful to yourself than challenge people unintelligently online who in real life you can't lace their shoes. |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by flyingpig: 8:43am On Oct 02, 2020 |
anonimi:Damn! |
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Born2Breed(f): 8:46am On Oct 02, 2020 |
![]() Completion date that keeps changing the way woman changes menstrual pad.
|
| Re: Amaechi: FG Will Complete The Lagos-Ibadan Rail Project By December by Mrpojj(m): 8:59am On Oct 02, 2020 |
Mazigabriel:Ameachi remember ur state and region oh |
Amaechi: FG Has Paid $150m Out Of $500m Chinese Loan On Abuja-Kaduna Railway • Amaechi: FG Will Stop Train Services If COVID-19 Protocols Are Not Observed • Amaechi: FG Needs $656 MillionTo Complete Lagos-Ibadan Railway • 2 • 3 • 4
January 15th 1966: The Day Nigeria Was Changed Forever By A 29 Year Old! • Remi Tinubu Speaks Fluent Itsekiri As She Visits Warri • Biafra Group Applies For UN Membership


, cos diversification has commenced since 2018. But not yet sufficient by 2023 - 2025 we would be seeing the results of these things.
