Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
kopell:
Well done oga Spyder, this building is massive. If you don't mind can you share the square meter of the decking? Over the years, in most of your construction my observation like others, you don't use temporary stairs for your decking like others asked. It's an eye opener, I believe you save money by casting the stairs first to get access to the decking casting. I notice some of these mass project you handle you chain the internal lintel together, though you answer the question in one of the post. Is it really necessary to chain the internal lintel together? That question is really for the structural engineer. Isn't it better to do the decking once rather than twice? (just an observation). Can you educate us more in that aspect.
This first decking is about 268 sqm.

About temporary stairs, its usually done in a site we have difficulty climbing through the main stairs. If we have too many concrete casters and time is of the essence, we use temporary stairs. The cost is not very substantial, the average cost is about N40,000. We save money by making use of the main staircase, but we choose the option that best works for the project.

As for chaining the lintels, its actually a requirement in the structural drawing of most storey buildings, the structural drawings usually specify the use of the lintel before the decking.

It's better to do the decking once if you can afford to, but the nature of work in our country makes this very difficult.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 1:06pm On Nov 12, 2020
Putting finish touches to the house before the concrete cast of the first parapet and the penthouse decking......

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 1:11pm On Nov 12, 2020
More

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
Completing the staircase to the penthouse.......

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
At the top.........

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
Working on the decking frames.......

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
More pictures of the work today........

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:05pm On Nov 12, 2020
The mat.....

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 2:03pm On Nov 13, 2020
More from this site.........

Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 4:38pm On Nov 15, 2020
spyder880:
Taking blocks up on the deck, in readiness for block setting for the first floor.
Spyder,
Is it safe to keep or stock the blocks on the deck for about 4 weeks or more before setting without any load imbalance effect on the structure?
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:25pm On Nov 15, 2020
omanzo02:
Spyder,
Is it safe to keep or stock the blocks on the deck for about 4 weeks or more before setting without any load imbalance effect on the structure?
As long as your bamboo supports are still under the slab, there is little risk.
Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 6:51pm On Nov 15, 2020
spyder880:
As long as your bamboo supports are still under the slab, there is little risk.
What are the likely risk on the structure if the bamboo are already removed and the slab have long cured?
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:31pm On Nov 15, 2020
omanzo02:
What are the likely risk on the structure if the bamboo are already removed and the slab have long cured?
None, if the slab is cured and the supports removed, it should bear the weight of blocks.
Re: The Making Of The "White Penthouse" In Anambra by bixton(m): 2:12pm On Nov 16, 2020
omanzo02:
What are the likely risk on the structure if the bamboo are already removed and the slab have long cured?
Avoid stacking all the blocks on only a section.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 10:48pm On Nov 16, 2020
bixton:
Avoid stacking all the blocks on only a section.
Very correct.
Re: The Making Of The "White Penthouse" In Anambra by omanzo02: 11:04pm On Nov 16, 2020
bixton:
Avoid stacking all the blocks on only a section.
Definitely, the loads must be evenly distributed over the areas of the slabs to avoid overloading a section.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 11:07pm On Nov 16, 2020
Meanwhile, work is still going on here today and tomorrow. We are doing the electrical and plumbing piping for this penthouse deck.
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 3:14am On Dec 13, 2020
Please I would like to know the total cost to build this house from start to finish level.
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 4:13am On Dec 13, 2020
spyder880:
May all the Glory and all the Honour be given to our Lord God Almighty!

Ladies and gentlemen, welcome to another thread where we are going to document the house construction procedure of a new home project for a friend I have known for long. The details of this project are as follows;

Project: Construction of a new 7 bedrooms duplex with penthouse
Client: A Nairalander
Location: Anambra state
Architects: Casa-Phils Designs (Phildecasa)
Duration: 90 days (Shell of 5he building only)
Budget: To be revealed later.

This house will have the following arrangement;

Ground floor
1 Entrance porch
1 Ante room
1 Main living room
1 Dining room
1 Bar
1 Central lobby
1 Kitchen
1 Kitchen store
1 Laundry room
2 Ensuit bedrooms
1 Side veranda
1 Curved staircase
1 Main staircase

First Floor
1 Ensuit Master bedroom
1 Ensuit Madam bedroom with balcony
1 Ensuit bedroom with balcony
1 Family lounge
1 Main balcony overlooking the front
1 Lobby

Pent floor
2 Ensuit bedrooms
1 Private lounge
1 Lobby
2 Balconies

We pray for a smooth working operation. Work is planned to start this weekend.
Oga Spider I'm waiting to hear from you about the total estimate to build this house thanks.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:29am On Dec 13, 2020
UwaMmebii:
Oga Spider I'm waiting to hear from you about the total estimate to build this house thanks.
If this house is being built at today's building materials costs, about N28m will complete the carcass of this building, while about N25m might complete the finish of the building. Thanks.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:30am On Dec 13, 2020
We plan to restart work here in this site by early next week. More pictures when we start..
Re: The Making Of The "White Penthouse" In Anambra by UwaMmebii(m): 5:36am On Dec 13, 2020
spyder880:
If this house is being built at today's building materials costs, about N28m will complete the carcass of this building, while about N25m might complete the finish of the building. Thanks.
Ok Thanks bro.
Re: The Making Of The "White Penthouse" In Anambra by alexsandro(m): 6:05pm On Dec 13, 2020
What kind of staircase are better to choose?
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:25pm On Dec 13, 2020
alexsandro:
What kind of staircase are better to choose?
Any type you like.
Re: The Making Of The "White Penthouse" In Anambra by alexsandro(m):
spyder880:
Any type you like.
I am thinking about marble anyway. It seems to be the best option smiley
Marble stairs are amazing additional to marble wall at the second floor. I will share some photos after we finish
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:35am On Dec 14, 2020
alexsandro:
I am thinking about marble anyway. It seems to be the best option smiley
Yes some people use tiles, others use marble finish, it will depend on what the client chooses after seeing the options and considering the cost.
Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 6:57pm On Dec 15, 2020
We are back in this site, to complete the decking cast after the cement increase........

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 7:03pm On Dec 15, 2020
More pictures

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:38am On Dec 18, 2020
Concrete cast still in progress..........

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op): 5:56am On Dec 18, 2020
Staircase area.......

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
Some of the completed parapet works.......

Re: The Making Of The "White Penthouse" In Anambra by spyder880(op):
More

1 2 3 ... 8 9 10 11 12 13 14 ... 16 Reply

OFFPLAN PROPERTY. Luxury 3 Bedroom + BQ (penthouse) In Camberwall Advantage 1The Making Of The "7 Bedrooms High Ceiling Bungalow" In AnambraThe Making Of The "Owerri Royal Manor"234

Current Price Of Roofing Sheets, Building Materials In Lagos, Rest Of NigeriaFire Guts A Building In Ketu, Lagos (Photos, Video)Pictures Of Kolapo Isola Estate, Best Estate In Ibadan

Viewing this topic: 1 guest(s)