Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 - Properties (13) - Nairaland
Nairaland Forum › Nairaland General › Properties › Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 (47659 Views)
1 2 3 ... 10 11 12 13 14 15 16 ... 21 Reply (Go Down)
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by omanzo02: 4:47pm On Dec 27, 2020 |
rotecch77:It's crass stupidity to go against minimum conventional methods and safety practices, there are minimum & maximum specifications to achieve results, it's the duty of building specialist to propose that and not just imaginary or baba Kunle's unfounded theories and practices. Durability is the first hallmark of a building. |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:25am On Dec 29, 2020 |
omanzo02:Retweet! Thanks |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 3:35pm On Jan 01, 2021 |
WELCOME TO YEAR 2021 Watch out for new restructuring of our firm .. Range from client brief to delivery of the project 1 Rotech building concept 2 Arbo contractor Ltd Both are fully registered firm with CAC Architectural drawing Construction Renovation work Mini estate road Our team includes *Builder *architect *structural engr Our skilled workers includes * plumber *tiler * bricklayer *iron bender/welder *finishings installer (pop, painters, artwork men) *carpenter/ joinery Mail: Rotech77@yahoo.co.uk Direct contact;08066619493 |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:59am On Jan 02, 2021 |
Finishings coming soon |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Timothyoj(m): 9:50pm On Jan 02, 2021 |
Great job sir.... |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:20am On Jan 03, 2021 |
Timothyoj:Thanks so much |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by sgtponzihater1(m): 8:59am On Jan 03, 2021 |
Nice project. What was the estimated cost of this |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:14pm On Jan 03, 2021 |
sgtponzihater1:30m peg down for the job |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 3:38pm On Jan 04, 2021 |
Finishing still in progress here |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by worworbabe: 4:01pm On Jan 04, 2021 |
Well Done. I read from the first page to the last today. I want to know how you ensure there's cross ventilation in the mini flats. |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:13pm On Jan 04, 2021 |
worworbabe:Thanks for the time spent here Most of this type of building can’t get cross ventilation in all the rooms |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:13am On Jan 05, 2021 |
Let’s real building professionals handle your project. You can’t go wrong with them, it’s your building you are the one to enjoy it. |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:12am On Jan 09, 2021 |
More coming |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Commonsense101(m): 12:09pm On Jan 09, 2021 |
Nice , how much did external plastering cost? labour inclusive |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 2:01pm On Jan 09, 2021 |
Commonsense101:Cement 75bags Labour cost only 350,000 |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Engrobiorah(m): 6:54pm On Jan 09, 2021 |
rotecch77:Wow Labor costs more than the cement? |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Commonsense101(m): 11:26am On Jan 10, 2021 |
rotecch77:Thanks, how many trips of sand did you use |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 3:14pm On Jan 10, 2021 |
Commonsense101:4trips |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Commonsense101(m): 10:48am On Jan 12, 2021 |
rotecch77:Gracias, 4 trips of 20 tonnes? wow. these people don dey chop my money |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 11:12am On Jan 12, 2021 |
Commonsense101:Really? |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Commonsense101(m): 12:04pm On Jan 12, 2021 |
rotecch77:Smh. Kindly Confirm that the trips you referred to are 20 tonnes size? |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 10:53pm On Jan 12, 2021 |
I said 4 trips of lorries Not even 20 tonnes lorry as you suggested. It’s only 10tonnes lorry but the driver manages to carry about 13tonnes bcs the sand was hipped. |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by bolajinoni1(m): 6:42pm On Jan 13, 2021 |
We are professional surveyor Call us for ur land and civil engineering survey anywhere in Nigeria. Surveying or land surveying is the technique, profession, art and science of determining the terrestrial or three-dimensional positions of points and the distances and angles between them. A land surveying professional is called a land surveyor. These points are usually on the surface of the Earth, and they are often used to establish maps and boundaries for ownership, locations, such as building corners or the surface location of subsurface features, or other purposes required by government or civil law, such as property sales. Surveying also includes the technique of establishing points by predetermined angular and linear measurements. From the plans, sections, and maps prepared by surveying, the area and volume of a particular plot of land can be calculated. A map represents the horizontal projection of the area surveyed and not the actual area. But the vertical distance can be represented more correctly by drawing sections. During a survey, we use various tools to do our job successfully and accurately, such as total stations, GPS receivers, prisms, 3D scanners, radio communicators, digital levels, dumpy level and surveying software etc Surv. Righteous place concepts Suite 1 elegbede, alausa market, Opp, connect hotel Abeokuta/ Lagos Exp. Rd, Ijako Sango otta ogun state. Call or Whatsapp: 08137651008 or 09053010009 |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by fabulous85: 7:27pm On Jan 13, 2021 |
nice, still waiting for the cost of wiring. quantity of 1mm,1.5mm, 4mm, 6mm and 16mm used. thanks |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 11:38am On Jan 15, 2021 |
fabulous85:I will definitely post it here |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by darkhorizon: 11:11pm On Jan 16, 2021 |
rotecch77:How much does it cost to make these aluminum toilet door? |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:12am On Jan 17, 2021 |
darkhorizon:Materials determine the cost, we used real towal aluminum for this and Turkish key, each one cost 32k |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:08am On Jan 19, 2021 |
Suckaway and septic tank done Suckaway size in ft 6*5*5 Septic tank size in ft 12*10*8 Cost Excavation ;N45k Materials; sand, cement,granite, reinforcements,planks cost; N180k Labour cost N45k Total package N270,000 |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:36am On Jan 22, 2021 |
Suck away slab reinforcement done, waiting to receive concrete
|
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:14am On Jan 24, 2021 |
Suck away Slab cover done.
|
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 2:56pm On Jan 26, 2021 |
Fence work in progress |
| Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by GoodFaith: 3:11pm On Jan 26, 2021 |
rotecch77:Great Price |
1 Storey Building (3nó 2bdrms, 7 miniflats) @ Hilltop Est8, itamaga, Ikorodu#37m • The Erecting journey of 2stories building of 12 flats by Arbo Contractor Ltd • Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 • 2 • 3 • 4
"Face Me I Face You" Experience • The Making Of 4-units Duplex In Iyana-Iba Lagos • Pictures Dont Lie: The Real Mowe And Ofada Agents Wont Tell You About