₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,329,647 members, 8,441,679 topics. Date: Wednesday, 08 July 2026 at 09:48 PM

Toggle theme

CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE - Properties (4) - Nairaland

Nairaland ForumNairaland GeneralPropertiesCONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE (11967 Views)

1 2 3 4 5 Reply (Go Down)

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 5:07am On Dec 27, 2020
kopell:
Are you serious, what part of Lekki will be prefer location for the project, as we speak I have a friend that as about 60 plots for sale in Ibeju before eleko along lekki epe express on that main road. I can send you the video of the location tomorrow if you don't mind
Chat me on WhatsApp. Though we prefer a location that is not beyond Sangotedo.
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 5:09am On Dec 27, 2020
kopell:
That is a lot of investors, I think is better to have few investors that can put better resources together in form of share to the project. That is smart thinking.
The investors wont be up to that. Because most of them would invest more than 5m each, some 10m etc
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by Gloriouspa(m):
Well done brother.

In case you need the services of an horticulture on this project or other projects, I am available please. We plant fresh grass, flowers, trees, shrubs, and palm trees. We also do home and office fumigation.

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 6:08pm On Dec 27, 2020
Gloriouspa:
Well done brother.

In case you need the services of an horticulture on this project or other projects, I am available please. We plant fresh grass, flowers, trees, shrubs, palm trees, etc.
Great
Noted
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by mendii(m): 6:24pm On Dec 27, 2020
abragr8:
Great
Noted
I sent you a pm

Kindly reply
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 7:27pm On Dec 27, 2020
mendii:
I sent you a pm

Kindly reply
Okay thanks
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by DankemzI(m): 8:13pm On Dec 27, 2020
Kudos to your expertise and team members for putting up this amazing edifice. sad
When you get to Landscaping/paving level you give us a call on 08132210421 for a free quotation, we are the only landscape company that specializes in waterlogged areas
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 12:41pm On Dec 28, 2020
cheesy wink
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:47am On Jan 04, 2021
DankemzI:
Kudos to your expertise and team members for putting up this amazing edifice. sad
When you get to Landscaping/paving level you give us a call on 08132210421 for a free quotation, we are the only landscape company that specializes in waterlogged areas
Noted
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 11:33am On Jan 04, 2021
Wherever you see any design, bring it for us to build for you.

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by chuksjuve(m): 6:04pm On Jan 05, 2021
Great job man !

You deserve a follow ..

Keep it up ...
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:16pm On Jan 06, 2021
chuksjuve:
Great job man !

You deserve a follow ..

Keep it up ...
Thanks a great deal
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by damiloladuke: 7:27pm On Jan 10, 2021
abragr8:
In 2021 we are putting together a group of investors to build the best Event Centre with some Lodging suites in Lekki. 500 persons. And each person would invest a Minimum of N1m. You get 100% returns and can divest (exit).
I'm in please
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 8:38am On Jan 11, 2021
damiloladuke:
I'm in please
Okay good. Details sent to your WhatsApp
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 12:37pm On Jan 11, 2021
See

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by Favemmzar200(m): 1:20pm On Jan 11, 2021
abragr8:
See
I went through your work and I was just like wow shocked shocked
Your works are amazing
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by Olantia002(m): 2:45pm On Jan 11, 2021
I love construction.... a graduate in Building from Unilag... My oga keep its up ,nice wrk .
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 7:31pm On Jan 11, 2021
Favemmzar200:
I went through your work and I was just like wow shocked shocked
Your works are amazing
Thank you so much
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by abragr8(op): 1:28am On Jan 12, 2021
Olantia002:
I love construction.... a graduate in Building from Unilag... My oga keep its up ,nice wrk .
Send your CV to.
daystarshelter@gmail.com
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by chigodo(m): 1:21am On Jan 16, 2021
[quote author=abragr8 post=97364084]ADVANTAGES OF MARINE PLYWOOD

Happy new year. Pls where can I buy a batching plant?
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by saferoom: 1:12am On Jan 22, 2021
Great works
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 6:42am On Jan 30, 2021
Lovely

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 12:32pm On Feb 05, 2021
smiley
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by xxxXXXxxx: 4:22pm On Feb 19, 2021
Great work.

How long did it take to finish this construction project.
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 3:41am On Feb 28, 2021
xxxXXXxxx:
Great work.

How long did it take to finish this construction project.
Roughly a year due to the Lockdown
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by honeyguy(m): 4:28am On Feb 28, 2021
opalu:
Roughly a year due to the Lockdown
Roughly how much did it cost?
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 2:59pm On Mar 11, 2021
honeyguy:
Roughly how much did it cost?
abragr8:
With construction, finishes, Electrical and Digital installations etc it is N350m
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by Kharol1234: 9:25am On Mar 18, 2021
Lovely work and delivered at record time.
I am a Neon Signage Artist my contact is on my signature

Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by Nelson1715(m): 8:02am On Mar 22, 2021
abragr8:
Suspended ceiling for wind floor. Handled mainly by my Site Engineer Ola
Amazing Job you have put in place out there Sir. I love Construction with all of my heart... A graduate of Civil Engineering.
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by opalu: 4:02pm On Apr 03, 2021
Nelson1715:
Amazing Job you have put in place out there Sir. I love Construction with all of my heart... A graduate of Civil Engineering.
Re: CONSTRUCTION PROCESS FOR A 3000 SEATER EVENT CENTRE by emae009(m): 4:35pm On Apr 05, 2021
abragr8:
Finishing in top gear for dedication deadline
Good evening Sir, I have some follow up questions regarding the project.
1) Why wasn't steel beams used in place of constructing the 14m RC beams. Steel beams have good unsupported span.
2) If the building was Framed building, why wasn't the blocks of small sized like 6" or 5".
These two cases would have reduced the load footprint of the overall building on the foundation.

I'd be very appreciative of your response. Thank you
1 2 3 4 5 Reply

The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction ProcessConstruction Process Of Four Bedroom Bungalow @ MoweConstruction Process Of Contemporary Mansion At Makogi234

From Foundation To Completion, Pictures Of What We Built For A UK Based ClientThird Mainland Courts Oworonshoki Lagos, Selling Higher, Don't Miss It!5 Bedroom Contemporary Duplex Design