Proptmart's Posts
Nairaland Forum › Proptmart's Profile › Proptmart's Posts
A plot of land within a reputable organisation co-operative land @ Ira Nla Ajah for sale. Asking 6.5M. Contact 08023142108 or proptmart@gmail.com |
Hot |
Hot |
Pics |
Check it out |
Pictures upload |
Pics upload later 2day |
Available |
Available |
10 Acres of Land for sale @ Iyana Iyesi off Ota rd behind winners,. Title: C of O. Asking 60M. Contact 08023142108 or proptmart@gmail.com |
Descriptn: a block of four 3-bedrm flat on a plot of land fenced and gated. Location: Directly facing a major commercial rd linking to Ikorodu garage beside main street bank (former Afri bank) in Ikorodu garage. Titles: C of O, deed of assignment, survey. Asking price 27M. Contact - 08023142108 or proptmart@gmail.com |
Waiting |
Still waiting |
Still on |
Still available |
Still available |
A decked 3bedrm bldg placed at d back of a full plot fenced and gated @ Ibeshe for sale. Asking price 9.5M. Title: survey and building approval. Contact 08023142108 |
Still on |
An un-completed 6 bedrm duplex + 2 units of attached 3 bedrm flats and 2 bedrm flat BQ on a full plot of land fenced . Location : off Ijegun Rd Ikotun Title : Registered survey and building approval. Asking price 14M. Contact 08023142108
|
6 bedrm duplex + 2 units of attached 3 bedrm flats and 2 bedrm flat BQ on a full plot of land fenced Nearing completion. Location : Ikotun Title : Registered survey and building approval. Asking price 25M |
The last price is 220K |
Old rugged baby still available |
Old reliable; still much available. |
Still available |
still available with a considerable price slash. |
Toyota Camry V6 for Sale Model: 1990 Transmission: Automatic A/C: factory fitted working & chilling Tyres: Good tyres with aloy rims Asking Price 400K Contact: proptmart@gmail.com or call o8o231421o8
|
@brabus, you have really disappointed this client. I used to wonder where on earth a real construction person will have so much time to answer virtually all the question on this kind of busy tread. You must have derailed due to too much attention to ur tread rather than your job or lack of professionalism. This is quite unfortunate cos is really hacking down the integrity of all profesionals on this forum as forum members will loose confidence in us. where are ur praise singers now no where to be found! I wish you the best and pray that God will make your client to be gracious to you. Mr Client sir; Pls for God's Sake Just give him some time the more you hack on him the more he gets distracted or confused. |
Fence estimate: let;s go tha way of QS style and see rough estimate idea; 1. Block work: The perimeter lent is abt 90.14m say 91m. Then average height of the fence should be 2.4m max. Then the total block arrea in sqm is 218.4 let say 220 sqm to allow for wastage. 2. Concrete for raft: raft inverted T beam Dimension for the raft stem (0.15 x 0.675) the I beam (0.23 x 0.6) Note the total height asumed here is 750mm i:e 0.75 m it could be more or less than this in some cases depending on the diff. btw your site level and the road. Now the area in sqm is (0.101) + (0.138) = 0.239 now the Volume of the concrte is 0.239 * 91 = 21.79 precipitate say 23 precipitate to allow for shrinkage and wastage. column: 0.23 x 023 x2.4 x 32 = 4.1 precipitate Total 27cum 3. Formwork: Raft beam 91 x0.6x 2= 109 say 110 sqm. Columns 32 x 1 x 2.4 = 76.8 Total formwrk =190 sqm 4. Reinforcment: Raft Inverted beam-- 10-12mm = 13kg/m run :. 91 x 13 = 1183 kg of iron. Th columns- 18.87kg/column (total no columns 91/3 + 1= say 32) so: 18.87 x 32= 603.84 say 605kg 0f iron Total iron =1788Kg S/N Description qty unit Rate Amt 1 Block wrk 220 sqm 2600 572,000 2 concrete 27 precipitate 25000 675,000 3. formwork 190 sqm 2 400 456,000 4. reinforcement 1788 kg 250 447,000 total 2,150,000 This is just a rough estimate which exclude Gate columns and the gate, coping, rendering and unforseen contigency. The estimate of this kind takes care of the materia;l labour and contractor's profit |
searching still on, thanks to all response but just need more option for comparism. |
@ Agboforme, thanks for ur response. What we need is not a complete structure a building at foundation level, proposed to be built as a frame structure also with building approval and C of O within the axis i mentioned in my first post thanx |