|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 2:00pm On Sep 19, 2020 |
michlins: mehn I respect whoever that did that door. Him na baba
I will love to spend about two weeks with him sha Believe me you can do it my brother, I do see the door before honestly I don’t know it’s made in Nigeria here until I meet the guy, there is Turkish version of it too. Don’t be too overwhelmed about the pics I posted there, that is prototype, as I promised I will post the real pics here once I visited the place again this coming week. But the door is good . Let me shed more light to the door Try visit any GEE TEE BEE Bankie branch you will find it there (mainly in Lagos and others south west state) I don’t know much about there branch in eastern and northern part |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 12:11pm On Sep 19, 2020 |
kopell: Rotech77 you add to your name? Just want to make sure na the same Rotech ooo, if so ile lo wa. You most let me know that guy that make so locally iron doors ooo. Yes, it’s me sir same “ rotecch77” Anti spam lock the rotecch77 that the reason I’m using the alternative hand now “rotech77ditto” pending the time it will free me. E Seun sir The fabricator guy is in Orile/ Surulere area. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 12:02pm On Sep 19, 2020 |
EgunMogaji2: Baba you were so close to me. I'm in Elebu just up the street. Next time you;re around please let me buy you lunch. Oh that is good o BABA, I will like to take “ Amala and ogufe “ |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 11:32am On Sep 19, 2020 |
EgunMogaji2: Some days I just gas up my car and drive around visiting fabrication shops to see how the guys at home are getting on. I'm always impressed as to what some are accomplishing under the harsh Nigeria business temperature. I'm very proud of al lot of the guys in business. Some guys are really getting things done this days I was in Ibadan 2weeks Ago i drove along Akala new garage area and I found a guy there who does a wooden panels door I was confused it to Italians door at 1st site until I slow down finally to double checked couple with some doors work in progress then I know realized it’s Nigeria made door. Same thing in ijebu-ode fortnight ago. I need to asked my furniture staff to double there effort to meet or surpass those guys. Here are few work of my furniture staff. But they need to improve Still “rotech77”
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 10:54am On Sep 19, 2020 |
write2obi: Is this door you posted really made in Nigeria or assembled in Nigeria  My brother it’s locally made ooo, when next I visited the guy workshop I will post the real pics from his workshop I’m planing to get some from him soon. I don’t want to mentioned few popular banks that uses the door, |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 10:51am On Sep 19, 2020 |
write2obi: Is this door you posted really made in Nigeria or assembled in Nigeria  My brother it’s locally made ooo, when next I visited the guy workshop I will post the real pics from his workshop I’m planing to get some from him soon. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 10:37am On Sep 19, 2020 |
EgunMogaji2: Very very nice door there. Yes it’s a very solid door. The one without sensor or finger print is about 4ft 150-170k 3ft 120-130k Still” rotecch77” |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 10:28am On Sep 19, 2020 |
michlins: flush doors like this abi? This is iron door too and there's a way I can eliminate the noise you're worried about If you can eliminate the noise that will be a big plus to this grade of door , actually I know of high quality door of Nigeria Made used by some big banks in Nigeria without noise and well sealed against water penetration (see attached pic) but it’s pricey. Also you can fine-tone the finishings to look more elegant( demands/ cost will determines this) but never the less it will add more value to your product.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 9:44am On Sep 19, 2020 |
JustCryptos: Thanks chief. Any particular items? Copper pipe for 9500 is much 6500 is a good deal for better product. Then the 4” pipe of 2500 should be thick pipe of 3-4mm thickness Also the 2” pipe thick one is 1400 against 1700 Others are very good price |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 4:13am On Sep 19, 2020 |
GBAK: WASTE MATERIALS: S/N DESCRIPTION OF ITEMS QTY RATE AMOUNT (₦) 1 100mmx3mm Sacving Pipe 14L 3,500 49,000 2 75mmx3mm Sacving Pipe 5L 2,500 12,500 3 50mmx3mm Sacving Pipe 16L 1,500 24,000 4 100mm Hakan/ Sanica Tee 7 1,000 7,000 5 100mm Hakan Elbow 25 650 16,250 6 100mmx45° Hakan Bend 8 650 5,200 7 100mmx75m Imported Socket 5 600 3,000 8 75mm Hakan Imported Tee 4 500 2,000 9 75mm Hakan Elbow 6 500 3,000 10 75mmx45° Hakan Bend 4 500 2,000 11 50mm Hakan Bend 42 250 10,500 12 50mm X 45° Hakan Bend 30 250 7,500 13 50mm Hakan ‘Y’ Tee 10 450 4,500 14 50mm Hakan Equall Tee 14 400 5,600 15 Old Abro Big Gm 2 5,000 10,000 16 75mm X 50mm Reducing Socket 6 600 3,600 WASTE SUB TOTAL ₦165,650 I can’t access the mail you sent to again. Reach me on 08066619493 Mail: rotech77@yahoomail.co.uk |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 4:10am On Sep 19, 2020 |
BrabusNG: Nairaland antispam is angry these days  Infact it’s serious |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 8:49pm On Sep 18, 2020 |
shogbenga: Good evening all the Gurus on this platform.
Pls I need your advice
I intend to change all the internal doors and toilet doors in my personal house. The old china doors that I installed about 8 years ago are peeling off
Kindly advise on type of doors I can replace them with. The most important is DURABILITY. Thanks and God bless. You can used “Turkish made rugged pvc toilet door Still your one and only “rotecch77”
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 8:46pm On Sep 18, 2020 |
GBAK: WASTE MATERIALS: S/N DESCRIPTION OF ITEMS QTY RATE AMOUNT (₦) 1 100mmx3mm Sacving Pipe 14L 3,500 49,000 2 75mmx3mm Sacving Pipe 5L 2,500 12,500 3 50mmx3mm Sacving Pipe 16L 1,500 24,000 4 100mm Hakan/ Sanica Tee 7 1,000 7,000 5 100mm Hakan Elbow 25 650 16,250 6 100mmx45° Hakan Bend 8 650 5,200 7 100mmx75m Imported Socket 5 600 3,000 8 75mm Hakan Imported Tee 4 500 2,000 9 75mm Hakan Elbow 6 500 3,000 10 75mmx45° Hakan Bend 4 500 2,000 11 50mm Hakan Bend 42 250 10,500 12 50mm X 45° Hakan Bend 30 250 7,500 13 50mm Hakan ‘Y’ Tee 10 450 4,500 14 50mm Hakan Equall Tee 14 400 5,600 15 Old Abro Big Gm 2 5,000 10,000 16 75mm X 50mm Reducing Socket 6 600 3,600 WASTE SUB TOTAL ₦165,650 Over estimated....... but don’t fight your plumber My hand no dey o Just ask him to REDUCEREEEEE All the items, yes All the items. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 8:44pm On Sep 18, 2020 |
JustCryptos: Chairman and other gurus in the house, I need your help. Please a plumber submited this as quotation for plumbing work for a 3 bedroom flat (all ensuite) plus one visitor's toilet. Is this in order?
Cold Water 4” PVC Pipe – 11 length @2500 – 27,500 4” Elbow – 6 pcs @500 – 3,000 4” Y 2 pcs @500 – 1,000 4” x 2” Tee 2 pcs @ 450 – 900 4” x 45o bend 6pcs @450 – 2700 2” x Y 4 pcs @350 – 1400 2” tee 6 pcs @ 350 – 2100 2” x 45o bend 8pcs @350 – 2800 2” x 90o bend 10pcs @450 – 3500 Floor drain 4 pcs @800 – 3200 2” PVC Pipe – 5 length @1700 – 8,500 3/4 PVC Pipe – 8 length @500 – 4000 ¾ elbow 20 pcs @50 – 1000 ¾ tee 10 pcs @50 – 500 ¾ x ½” m/f socket 15 pcs @50 – 750 ¾ x ½” m/f elbow 15 pcs @50 – 750 Abro gum 2 tins @1500 – 3000 Total: #66,600
Hot Water ½” copper pipe 3 length @9500 – 28,500 ½” copper tee 10 pcs @ 500 – 5,000 ½” copper elbow 15 pcs @ 500 – 7,500 ½” copper m/f socket 10 pcs @ 500 – 5,000 ½” copper m/f elbow 10 pcs @ 500 – 5,000 Yarn rope 2-heads @200 – 400 Gasket gum 1pc @500 Total: #51,900 Workmanship: #45,000
Grand total – #163,500 Your plumber is a good man, but ask him to reduce some of the price a little More so your power of negotiation will determine the Labour cost User name still “rotecch77. This is my alternative user name; |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Rotech77Ditto(m): 8:41pm On Sep 18, 2020 |
GBAK: ESTIMATE FOR ALL INTERNAL RUNNINGS WHICH CAN DELAY THE PLASTERING 1 2om Sanitary Hakan Elbow 68 500 34,000 2 20m Hakan PPR Plain Elbow 40 150 6,000 3 20m X 25m PPR Elbow 45 150 6,750 4 20m Hakan PPR Tee 21 150 3,150 5 20mx25m Hakan Tee 45 200 9,000 6 25m Hakan PPR Elbow 55 200 11,000 7 25m Hakan PPR Tee 25 200 5,000 8 20x25m Reducing Nipple 20 200 4,000 9 25mx32m Reducing Nipple 16 250 4,000 10 25mx32m Elbow 18 250 4,500 11 25m/ ½ Female Elbow 10 650 6,500 12 32m Control Seat Valve 10 5,000 50,000 13 32m Elbow PPR 18 250 4,500 14 32m Hakan PPR Tee 7 250 1,750 15 20m Female Socket 5 500 2,500 16 20m Male PPR Hakan Socket 5 500 2,500 17 25m Hakan PPR Socket 15 180 2,700 18 20m Hakan PPR Socket 15 100 1,500 19 20m Hakan PPR Pipe 12L 1,500 18,000 20 25m Hakan PPR Pipe 17 1,800 30,600 21 32m Hakan PPR Pipe 6L 3,000 18,000 21 32m X 25m Tee PPR 10 280 2,800 ₦228,750 I can’t log in with My popular user name “rotecch77” this is my alternative user name. Now back to your request All the materials here are over inflated.... only just 3 items from all the list are partially ok. Mind you if this is in LAGOS only I don’t know of another state. |
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by Rotech77Ditto(m): 2:36pm On Apr 25, 2020 |
mank1234: Throw the questions, I'm equally interested. Before then some questions: 1) If there's leakage at the valve inside, what will be the smell: normal gas or mixture of 'shit' - foul smell? 2) is the answer to his question still yes, if it's only 3 people using the system daily? 3) how many grams or metric volume of gas does it produce from an average person's 'pupu'. This is my second user name ( I posted with rotecch77) the comment was deleted I don’t know why. Now to answer your questions 1- the odor of the biogas is same as that of regular LPG gas (rotten egg odor) why this is that they usually add one a non-harmful chemical( mercaptan) into it to give quick attention Incase of any leakage. 2- A person can give about 0.5kg of feces in a day and 1kg of feces is equal to 0.4m3 of methane gas and 1m3 of this methane gas can Cook for for 5-6 person in 3-4 times |
|
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by Rotech77Ditto(m): 2:05pm On Apr 11, 2019 |
More pics
|
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by Rotech77Ditto(m): 6:34am On Apr 11, 2019 |
kkfada: Sent a mail please reply me.... Thanks, Mail replied |
Properties › Re: Affordable Deal On England WC,spanish,italy Tiles,..FREE DELIVERY by Rotech77Ditto(m): 8:54pm On Apr 10, 2019 |
More coming soon |
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by Rotech77Ditto(m): 7:51pm On Apr 10, 2019 |
buddie: And hope that wouldn't cost a fortune to do sha? Can you give a price range as that's a major deciding factor please. The cost depends on the nature of the water and the current state of the stainless cylinder you have there |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by Rotech77Ditto(m): 5:07pm On Apr 10, 2019 |
I remember some of our past work for nairalader here some yrs back (about 4yrs ago)
|
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by Rotech77Ditto(m): 3:43pm On Apr 10, 2019 |
More coming |
Properties › Re: Advantages Of Shower Cubicles by Rotech77Ditto(m): 2:17pm On Apr 10, 2019*. Modified: 6:54am On Apr 11, 2019 |
Actually imported ones arevof many grade, china low grade price range (55-65k) china high grade(85-90k) real England about170k. China make can never last as well installed nigeria frameless cubicle which made of 8-10mm glass.(price range 75-100k. China made PROBLEM range from, rollers, base, glass.(5-6mm). THE ENGLAND make is very good but its very scarce to get. I'm into sales and fabrication of both for like 15yrs ago so i know the pro and coin about the two. Check the pics below, The square type on the pics is china.(middle pics) The straigh one on the pics is nigeria made. I sold and i constructed both for Diff Nairaland member. MY OLDER USER NAME IS *ROTECH77* but i found it difficult to access now, THAT is the reason of this new user name: ROTECH77DITTO, 08066619493. https://www.nairaland.com/3851900/general-finishings-5bdrs-luxury-duplexhttps://www.nairaland.com/4269104/showcasing-plumbing-tiling-finishings-workYou can check these links for more pics
|
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by Rotech77Ditto(m): 11:40am On Apr 10, 2019 |
08066619493 |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by Rotech77Ditto(m): 11:37am On Apr 10, 2019 |
Thanks for your time here |
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by Rotech77Ditto(m): 11:36am On Apr 10, 2019 |
Watch out |
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by Rotech77Ditto(m): 11:36am On Apr 10, 2019 |
08066619493 |
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by Rotech77Ditto(m): 11:34am On Apr 10, 2019 |
More
|
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by Rotech77Ditto(m): 11:18pm On Apr 09, 2019 |
Update
|
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by Rotech77Ditto(m): 4:51pm On Apr 09, 2019 |
We are here for you |