Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:56pm On Aug 26, 2015
Blinding of Foundation floor in preparation for Raft Reinforcement

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:53pm On Aug 26, 2015
Concrete Works in Fence

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:52pm On Aug 26, 2015
Setting out of Foundation Paths

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:50pm On Aug 26, 2015
Wooden Casement of 300mm Width x 600mm Height. with Iron Reinforcement.

Properties › Re: Lekki Gardens Finishings. by skimanski(op): 9:44pm On Aug 26, 2015
UPDATE ON MASTER'S W.C TILLING

Properties › Re: Lekki Gardens Finishings. by skimanski(op): 9:42pm On Aug 26, 2015
CONCLUSION OF LIVING ROOM AND DINING POP WORKS

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 8:28am On Aug 26, 2015
erico2k2:
Oga first of all I have an Axe to grind with you for Dising my able manager like that in the person of wenger ,I dey come for you grin grin
In other news,just thinking aloud, is creativity not abstract?I have designed many things at work and they cost me nothing as it was all done.I agree that not everybody can build something in their ie develop a visual image head but wont the outcomes of such thought lead to more pricing power on your part as a builder?.In the west where we live,people are bent on developing ways of making their service cheaper not more expensive.People are always on the watch out for new tech to make their service cheaper cos the cheaper the more Biz and customers flow to their site and that them smiling to the bank.
You are correct. But you should know that at the end the work (however how creative it is) will have to pay for its self. Even if you device a method that makes it cheaper, but it's still has a price. And that price is then based on factors which boils down to the 3 arms that I mentioned. Give It to Nigerians still. People are still attempting different ways to make they overall budget cheaper than usual and still with a better results, but ecomomic factors is becoming counter productive to the results.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by skimanski(m): 7:17am On Aug 26, 2015
MAke Una no use Arthritis Derail this thread. Na una talk am say no Other topic. Infact no laff for this Thread on Serious issues. lol cheesy cheesy cheesy cheesy cheesy

Now my 2 kobo on this matter of Materials used in Nigerian Architecture. Like I always say, it depends on the balance between the client, the economy and contractor. i.e what the contractor has in store, what the Client is ready to accept and what the economy can favour.

1 THE ECONOMY
The Nigerian Economy isn't organized enough to enable a company that produces the wood they use in Building houses to stay and make profits. Hence me must import, there by increasing cost of Building with wood relatively. infact no business they make am, just say some business no get choice other than to stay. I'm even sure that the government will intentionally allow an unfavourable environment for these simple Building business Ideas so as to allow thoses their paddies that have cement Factory all over africa to continue making it.


2 THE CONTRACTOR
Some contractors are too based on how much they can make out of a project, and so if any process will slow that cash flow because they'll have to think extra, then its bye bye to such process. What i think is when contractors pick up a project. the first thing they should think of which is what I think of is how best can I make the house the finest and most creative around the environment and not bring a calculator out to calculate how best he can maximise his profit.

CLIENT
Some (Arsene Wenger Mr. BABA IJEBU) clients wants to build cheap house. Them want to use the cheapest labour. them wan use the cheapest professionals, them want the cheapest Architectural design, and the funny thing is them still want the finest Outcome. ahh thats not fair. We will never get a creative house from that. Not possible. How will some1 say he's looking for a tiller that will lay tiles for N200/m2.Make Una still dey sorry for all these workers, some get families ooo. (Oga 3strike, no Strike me oooooo. Na only example i dey make oooo no be u be Arsene Wenger oooo grin grin grin grin grin).
Properties › Re: Lekki Gardens Finishings. by skimanski(op): 9:15am On Aug 25, 2015
twinskenny:
you are a detailed person. Kudos sir
Thanks Boss
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:45pm On Aug 24, 2015
Final Block Level and Resumption of Deck Works

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:34pm On Aug 24, 2015
.

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 9:34pm On Aug 24, 2015
The Estate Requires us to Set out our fence Parameters before we can cut out our building Lines. So fence Parameters ongoing in pics

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 8:57pm On Aug 24, 2015
Decorative
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 3:02pm On Aug 24, 2015
Let the class begin then
Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 3:01pm On Aug 24, 2015
EgunMogaji:
May I ask what the scheme is to protect entry through the windows? Thankfully I'm not seeing the typical bars on the windows.
No plan for burglar bars in the house. It's in a well secured estate. With the house having a security guard. So owner didn't feel the need to put burglar bar. There is an alarm system installed in house.
Properties › Re: Lekki Gardens Finishings. by skimanski(op): 4:12pm On Aug 23, 2015
MASTER'S W.C TILING. Also Requiring some high Details too

Properties › Re: Lekki Gardens Finishings. by skimanski(op): 4:09pm On Aug 23, 2015
Highly Detailed Tiling Works

Properties › Re: Lekki Gardens Finishings. by skimanski(op): 3:58pm On Aug 23, 2015
Updates on Main Lounge POP Works

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 12:05pm On Aug 23, 2015
Meanwhile This is the Design We concept we made for this Particular View you are seeing. It was part of our contract agreement with client not to display his 3D. But this can be displayed as its the Original Concept for the house but was slightly adjusted to reach a final agreement

Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by skimanski(op): 11:53am On Aug 23, 2015
Everybody with their preferences. Client Wanted the Column Built in.
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 7:10am On Aug 23, 2015
Chekitaut:
Me nko Oga? i dey ooooo.
@ Chekitaut my oga, you throwey your boy oooo. u want make hunder kill us from Lagos.
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:43pm On Aug 22, 2015
EXTERNALS

Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:37pm On Aug 22, 2015
Externals

Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:36pm On Aug 22, 2015
W.c & Kitchen Finish

Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:35pm On Aug 22, 2015
INFINITY ESTATE FOUR FLAT

And we can say We are done with our Job here. Keys Handed Over to Client and Dezyns and Structures have moved forward.

Final Building Finish in Pics

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 3:09pm On Aug 22, 2015
Anyway Survey of Site to prepare for launch. Ready to Deliver when needed.

Questions and comments can start flooding in as we are here to answer any.

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 3:06pm On Aug 22, 2015
A Drive around the Estate shows the Very beautiful Architecture in Place. These Builders just know how to do it here. Seems we need to be on top of our game here man.

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 3:03pm On Aug 22, 2015
EndiaSami:
Skimanski baddest....greetings boss. The boy is still looking forward to working with Dezyns n structures o..but anyways we r still loyal, more blessings to u...**front seat tins, we come class early**
We are still waiting too oooo. Ready to work together
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 3:00pm On Aug 22, 2015
Qc1:
Thanks boss. Like how much do you think I will need?


.
Can't say until I see the Job
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:10am On Aug 22, 2015
Construction of 4 Bedroom Duplex in Lekki by Dezyns and Structures Ltd

Kindly follow on

https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:10am On Aug 22, 2015
Construction of 4 Bedroom Duplex in Lekki by Dezyns and Structures Ltd

Kindly follow on

https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension

Properties › 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 8:58am On Aug 22, 2015
Welcome to Victory Park Estate. Femi Okunnu Road, Lekki, Lagos.

This is the Location of our new Building Project. a 4 Bedroom Duplex(3D Perspective view below). Contract have been finalized and Client has clearly state his expectations. As usual we have been contacted because our Clients see us as the way to achieving their Dream Homes, and as usual We shall not disappoint. Like I Always say, there are challenges involved in trying to turn a beautiful 3D representation of any piece of Architecture into real Life. But the first step to achieving that is realising that there will be challenges and preparing yourself for it.

This Thread shall Shed lights on everything involved in our type of Architecture for everyone to see and mostly for those who have wanted their house to look like the 3D representation presented to them by their Architect. A lot of problems with our building these days are the Final Outcome. Hardly ever like what was promised. Without too much talk Lets move down to business.

Building Information

Proposed 4 Bedroom duplex.
Land Size 405 Sq.m
Area of Building 127 Sq.m


GROUND FLOOR
[/b]Guest w/c
Inverter Room
Main Living Room
Dinning
Guest Bedroom
Kitchen
Store

[b]FIRST FLOOR

Private Lounge
Master's Bedroom (With Walk in Closet)
Boy's Room
Girl's Room

Architect: Dezyns and Structures Ltd
Project Contractor: Dezyns and Structures Ltd
Tel: +2348038390386 / +2348185174782
Email: skimanski4life@yahoo.com / info@dnstructures.com
url: www.dnstructures.com
Scope of Work: Architectural Drawings to Complete Finishing.
Client Expectations: Ultra High


Kindly Follow Our other Threads for Other Designs and Finishings.

https://www.nairaland.com/1164230/best-architectural-interior-construction-works
https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction
https://www.nairaland.com/2067260/lekki-gardens-finishings

1 2 3 4 5 6 7 8 ... 120 121 122 123 124 125 126 127 128 (of 155 pages)