Staircase Details Carefully been Adhered to
|
# OSAPA TOWN TWIN DUPLEX Preparation of First Floor Slab Re-enforcement
|
breakages helped in expanding kitchen.
|
"507601" LEKKI GARDENS PHS.2 *507601 UNIT S* Re-appearance of our Utility Blocks and we Kickoff Design making on our Main lounge Partitioning.
|
"507601" LEKKI GARDENS PHS.2 *507601 UNIT S* MORE BREAKAGES ON GROUND FLOOR. We want to take some space from the dinning and give to the Kitchen, to allow for bigger kitchen
|
.
|
"507601" LEKKI GARDENS PHS.2 *507601 UNIT S* MASONRY ADJUSTMENTS ON GOING
|
"507601" LEKKI GARDENS PHS.2 *507601 UNIT S* BREAKAGES TO ALLOW FOR MASONRY ADJUSTMENT
|
"507601" LEKKI GARDENS PHS.2 *507601 UNIT S* Our New Lekki Gardens works in Pics. Begining Stages as we break and Create Additional Toilets to enable for the luxury of all bedrooms been En-suite INITIAL VIEW IN PICS
|
LEKKI GARDENS PHS.2 *0001 UNIT R* MASTER'S BEDROOM
|
.
|
LEKKI GARDENS PHS.2 *0001 UNIT R* MASTER'S BATHROOM
|
LEKKI GARDENS PHS.2 *0001 UNIT R* KITCHEN
|
.
|
LEKKI GARDENS PHS.2 *0001 UNIT R* Main Lounge
|
This Thread was opened to Specifically Chronicle our transformation of Lekki Gardens Apartment units for Our different Clients. You can find this Lekki Gardens finishing and Other Architectural master piece on our main Nairaland Thread ( https://www.nairaland.com/1164230/best-architectural-interior-construction-works ), but We feel the need to distinct our Lekki Gardens diary, to enable easy viewing by our esteemed followers, newcomers and Lekki Gardens clients who wish for the best on their home finishing, as well as other home finishing alike. To Start up this thread, I shall present pics of previous Lekki Garden works before We start off with pictures of new Lekki Gardens works Ongoing at the moment. Through this forum, we shall be able to clearly engrave at the mind of our followers, how much strength we posses in terms of Unique and Mind blowing Architecture. |
# OSAPA TOWN TWIN DUPLEX Masonry works In pictures.
|
babaeko1:@babaeko1, First thing First, the Number of boards for the foundation is 5. which makes it a 1.5m High Foundation. Plus the German floor is 1.6m. Now, before we ever commenced Filling on this soil, we did a soil test which indicated that the soil property contained less than 0.3m high clay soil on the top layer, and sharp sand beneath. which means the bad soil is very minimal and not signification to affecting our foundation. but we had to fill up due to the fact that it was water logged on top of our soil, thus enabling us to work. Now, our total high of filling used was just 0.9m to 1m high. which means even if the building had to magically dig through the filling, we still have about 0.3m to 0.4m above the ground. but the building can't dig through because we had specifically chosen the sand to be white beach sand to be filled to the level of the water. Now note something about the beach filling sand that makes it different from the red filling, is that because of its more stone sandy and less dusty components, it settles into water in less than 48hrs, the loosed part you saw in pics are the extra filling that are above water level. underneath those loosed once are very strong and well compacted white sand. Furthermore, if you notice the foot of our foundation was wider than the remaining part, this is to further reduce the settling levels. as a result, we have made a foundation hight of 1.6m height to fit into a 1.2m floor requirement (giving us an extra 0.4m), and has put it onto a floor sand filled with sharp sand on water and wider foot foundation. All this factors individually is ok for our building, talk less of having them all together. Feel free to further more questions Arch. Jude Odemwingie |
# OSAPA TOWN TWIN DUPLEX Conclusion of DPC Slab concrete cast, and resumption of brick works on ground floor.
|
# OSAPA TOWN TWIN DUPLEX FIlling works done. Prepared to cast our German floor.
|
BUCHOX:Hello Sir, Responded to your email on friday December 12 at 5.32 am. Kindly check through your emails. or I can resend again Thanks |
TILING WORKS Showing what can be done with metal Chrome Trims on Tile Surface.
|
bravoalpha:More bar design on going |
# OSAPA TOWN TWIN DUPLEX Arrival of Filling sand for our foundation floor.
|
BAR AREA DESIGN. Lekki
|
GBGHOSTBOY:email received |
# OSAPA TOWN TWIN DUPLEX Concrete Cast on Foundation Beam.
|
GBGHOSTBOY:Hello @GBGHOSTBOY I haven't seen your email. I have gone through my list of emails and do not seem to find any email from you. Kindly resend Thanks |
Proposed 4 Bedroom duplex. GROUND FLOOR Guest w/c Main Living Room Dinning Guest Bedroom Kitchen Store 1 Bedroom B.Q FIRST FLOOR Private Lounge Master's Bedroom (With Walk in Closet) Boy's Room Girl's Room
|
# OSAPA TOWN TWIN DUPLEX PREPARATION FOR CONCRETE CAST ON FOUNDATION BEAM
|
MORE PHOTOS
|
# OSAPA TOWN TWIN DUPLEX Formwork for RAft foundation.
|