Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 11:00pm On Aug 25, 2016
Updates on Master's Bedroom

Properties › Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:32am On Aug 24, 2016
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words

architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems)
Dezyns and Structures.

Architect Jude O. Odemwingie.
email: jude@dnstructures.com
email: skimanski4life@yahoo.com
website: www.dnstructures.com
Tel; 08038390386 or 08185174782
follow us on Instagram: @ dezynstructures


Kindly take your time to Follow our numerous professional works on every page of these links below

https://www.nairaland.com/1164230/best-architectural-interior-construction-works
https://www.nairaland.com/2067260/lekki-gardens-finishings
https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex
https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction
https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension
https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4
https://www.nairaland.com/2770635/construction-works-units-flats-new
https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension
https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian
Properties › Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 10:30am On Aug 24, 2016
Counting down to Finish.

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:41pm On Aug 23, 2016
More on Brick Works

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:35pm On Aug 23, 2016
pato405:
where exactly is this estate? and what's the cost of a plot here? any idea pls?
Arcadia Groove Estate. Femi Okunu St. Off the road beside the new Shoprite in Lekki.

Land can be above 50m for a Plot.
Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 9:49pm On Aug 22, 2016
We saw up the Shape of our Head Board.

Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 9:48pm On Aug 22, 2016
We saw up our Solid Core Wood For Doors

Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 9:47pm On Aug 22, 2016
In preparation for Master's Bed

Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 9:46pm On Aug 22, 2016
Girls room Wood Works

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:28pm On Aug 22, 2016
And today we resume Brick Works

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:25pm On Aug 22, 2016
Beulah09:
Was the DPC casting done or was it postponed?
DPC Was done as promised. Pictures below.

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 11:48pm On Aug 19, 2016
Complete Reinforcement and Mechanical Works for drains as we prepare for concrete Cast.

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 11:46pm On Aug 19, 2016
Beulah09:
Now that you are ready for casting, is there any test that is conducted to confirm that none of the pipes are leaking? Something like a leak detection test?
There is no need doing a Leak Test on the pipes run. Its as simple as just Pouring water and ensuring it links out.

This is it. Pipes that require more technical Leak Test is the pressure/Supply Pipes. Waste pipe never have water on them except when you flush. or waste water. This is unlike the supply pipes that have water constantly waiting to be released. Whats important when installing waste and soil pipes is to ensure you use the Thickest and more solid version, seal properly, and Ensure when your pour water it drains out via its outlet.
Properties › Re: Construction Of Flats In Owerri (new Dimension To Nigerian Architecture) by skimanski(op): 11:27pm On Aug 19, 2016
Also Even While we plaster First floor Internal Walls and we did on ground floor internal walls

Properties › Re: Construction Of Flats In Owerri (new Dimension To Nigerian Architecture) by skimanski(op): 11:26pm On Aug 19, 2016
Even With the Arrival of our Roof Wood

Properties › Re: Construction Of Flats In Owerri (new Dimension To Nigerian Architecture) by skimanski(op): 11:25pm On Aug 19, 2016
Still on Masonry works

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 7:46am On Aug 18, 2016
Beulah09:
Good work. How many days of filling with water before casting the DPC?

When are you planning the casting of the DPC considering the logistics challenge you mentioned?

Did you do a soil test or how did you arrive at the foundation design?
We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately

There was no need for soil Test done because it's a storey building and the estate have okayed the land for construction in a memo that contains the building codes. According to the estate documents, Soil Test is required when you have above 2 floors.
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 7:45am On Aug 18, 2016
Beulah09:
Good work. How many days of filling with water before casting the DPC?

When are you planning the casting of the DPC considering the logistics challenge you mentioned?

Did you do a soil test or how did you arrive at the foundation design?
We are working towards casting dpc on Saturday. So after filling, you can reinforce and cast immediately

There was no need for soil Test done because it's a storey building and we could assume the land was solid enough from the surrounding. Also the estate have okayed the land for construction. Soil Test is required when you have above 2 floors in such an area.
Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 11:05pm On Aug 17, 2016
Updates on Boys room.

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 10:25pm On Aug 17, 2016
Wardrobe for Boys and Girls room

Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 10:20pm On Aug 17, 2016
External brick works

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:54pm On Aug 17, 2016
msogunro:
The manual mixer is faster? I would have thought the truck is.

Same quality in the mix and monolithic foundation I assume.

Approximately how much do you think you would have paid to fill the forms had you used the truck mixer?
I mean it has a speed advantage over manual labour mix. Meaning its faster than manual labour mix.


Truck Mixers can be as much and 21,100/m3
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:44pm On Aug 17, 2016
Conclusion of filling as we prepare for Mechanical and Reinforcement works.

Properties › Re: Construction Works On Units Of Flats (a New Dimension To Nigerian Architecture) by skimanski(op): 9:22pm On Aug 17, 2016
External Storm Drain Outlet

Sports › Re: Rio2016 Olympics: Nigeria Vs Germany - 0 - 2 On 19th August 2016 by skimanski(m): 9:19pm On Aug 17, 2016
What you get when you use 30 year old boys and lie that they are 22 and Below. Lack of reaction and Energy. Slow to react and cant even defend. YIMU!!!
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:16pm On Aug 17, 2016
msogunro:
Thanks Skimanski.

I've seen concrete mixer trucks in Lagos and I've seen it used on one of the Nairalnad builds. For such a large quantity of concrete, why aren't concrete mixer trucks used over manual mixing and dumping?

I imagine there would be significant benefits in filling the forms in a few hours than filling it in a day or two - efficiency, better quality monolithic concrete pour. I don't know their cost so that may be the reason why its not widely used.
The cost of Concrete from Mixer Trucks is more than that of the manual ones. The advantage over Manual Labour mix is Speed. Its way faster for sure. So as a result where its advantage can be significant is if you have a lager size of concrete requirement and little time to complete concrete cast, then you can opt for mixers. except you have money to show off.
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 8:08pm On Aug 17, 2016
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words

architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems)
Dezyns and Structures.

Architect Jude O. Odemwingie.
email: jude@dnstructures.com
email: skimanski4life@yahoo.com
website: www.dnstructures.com
Tel; 08038390386 or 08185174782
follow us on Instagram: @ dezynstructures


Kindly take your time to Follow our numerous professional works on every page of these links below

https://www.nairaland.com/1164230/best-architectural-interior-construction-works
https://www.nairaland.com/2067260/lekki-gardens-finishings
https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex
https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction
https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension
https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4
https://www.nairaland.com/2770635/construction-works-units-flats-new
https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension
https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 8:07pm On Aug 17, 2016
msogunro:
Approximately how many cubic meters/feet/yards of concrete did it take you to fill foundation form?
57.63 m3 (Cubic Meter)
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 2:49pm On Aug 17, 2016
.

Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 2:48pm On Aug 17, 2016
wanaj0:
How long after the casting the raft before sand filling can be done? How long after sand filling before doing the DPC?
Once Casting is done, you can take off form work after 24hrs and start filling immediately.

Due to Logistics, we started filling yesterday. Below are pics from yesterday.

Properties › Re: Our Renovation Diary (a New Dimension To Nigerian Architecture) by skimanski(op): 10:11pm On Aug 16, 2016
Close look on making our master's Bedroom

Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by skimanski(op): 9:55pm On Aug 16, 2016
Updates on Fence works