PropertiesRe: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 1:52pm On Jul 13, 2016
Thanks to everyone that responded to this post.
Complete fund is ready for the project.
The location will be at Ilesa, Osun State.
I will prefer maximum of 45 days.

Analysis on how this project could be achieved in 45 days will be appreciated.
Thanks.
PropertiesRe: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 1:40pm On Jul 13, 2016
NinaMiliano:
If dia is total funding, and available materials 6am - 6pm, 30-40 days.
But u must tripple d number of masons n other artisans
Thanks to everyone that responded to this post.
Complete fund is ready for the project.
The location will be at Ilesa, Osun State.
I will prefer maximum of 45 days.

Analysis on how this project could be achieved in 45 days will be appreciated.
Thanks.
PropertiesRe: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 6:24am On Jul 13, 2016
msogunro:
https://www.nairaland.com/3112019/making-cute-5-bedroom-duplex
Is 100 days the minimum to complete the project?
Please I need a diverse knowledge on this post.
Thanks.
PropertiesRe: Minimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 5:59am On Jul 13, 2016
Please I will like to know idea days to complete 5 bedroom duplex from foundation.
PropertiesMinimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 5:50am On Jul 13, 2016
What is the minimum days required to build 5 bedroom duplex, including outside interlock.
PropertiesWhat Is The Minimum Days Required To Build 5 Bedroom Duplex by Tony2016(op): 5:42am On Jul 13, 2016
What is the minimum days required to build 5 bedroom duplex, including outside interlock.