Thanks to everyone that responded to this post. Complete fund is ready for the project. The location will be at Ilesa, Osun State. I will prefer maximum of 45 days. Analysis on how this project could be achieved in 45 days will be appreciated. Thanks. |
NinaMiliano:Thanks to everyone that responded to this post. Complete fund is ready for the project. The location will be at Ilesa, Osun State. I will prefer maximum of 45 days. Analysis on how this project could be achieved in 45 days will be appreciated. Thanks. |
msogunro:Is 100 days the minimum to complete the project? Please I need a diverse knowledge on this post. Thanks. |
Please I will like to know idea days to complete 5 bedroom duplex from foundation. |
What is the minimum days required to build 5 bedroom duplex, including outside interlock. |
What is the minimum days required to build 5 bedroom duplex, including outside interlock. |