How True Is The Statement That "Obj's Government Spent $16 Billion On Power" - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / How True Is The Statement That "Obj's Government Spent $16 Billion On Power" (1044 Views)

Sowore Reacts To Atiku's Arise Interview. Questions Him On $16 Billion For Power / Senate Approves Buhari’s $16 Billion, €1 Billion Loans Request / How Nigerian Government Spent $2000 To Buy Fendi To Paint Kanu Black(pic) (2) (3) (4)

(1) (Reply) (Go Down)

How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 3:00am On May 23, 2018
"" About the OBJ's $16B power project controversy, Dr Nura Alkali posted this: �

"How true is the statement that "OBJ's government spent $16 billion on power and had nothing to show for it"?

Fact Checks:

1. By May 1999 when OBJ took office, Nigeria had seven functional power plants generating 1,500 mW daily. These were Kainji, Jebba and Shiroro hydroelectric plants; and Egbin, Afam, Delta and Sapele gas thermal plants.

2. The two coal thermal plants at Orji River and Ijora were non-functional for lack of coal and obsolete equipment.

3. During 1999-2007, the FGN built six gas power plants now supplying electricity to the national grid. They include Afam II (276mW), Papalanto (330mW), Geregu (414mW) and Omotosho (330mW), all completed by May, 2007.

4. A fifth plant at Alaoji, Delta State (545Mw), was under construction. A sixth plant was under construction at Ikot-Abasi, Akwa-Ibom State (145Mw). It was a state government partnership with the FGN.

5. Also during 1999-2007, seven states initiated power projects under the NIPP Program with FGN support (though not partnerships) at: Sapele (Delta State), Egbema (Imo), Ehobor (Edo), Gbaram (Bayelsa), Calabar (Cross-River), and Omoku (Rivers).

6. In the private sector, the Agip oil company built and commissioned a 480Mw thermal plant at Okpai, Delta State.

7. Two hydroelectric projects at Zungeru (Niger State) and Mambilla (Taraba State) were at the design and conception stage by 2007. Construction work started at Zungeru (700mW) in 2013, to be completed in 2020, while construction work at Mambilla (3,050mW) started only in 2018.

8. During 1999-2007, the FGN also rehabilitated existing power plants at Kainji, Egbin and Shiroro, which were all performing far below capacity due to accumulated neglect.

9. Also during 1999-2007, the FGN initiated new power transmission projects (though most of them commenced after 2007) and passed into law the Power Sector Reform Act which allowed the privatization of NEPA/PHCN.

Summary:

Today, Nigeria owes at least 2,520 mW of her daily power generation to FGN policies conceived and executed during 1999-2007. That excludes investments in power transmission and distribution, as well as FGN support for NIPP projects which came on stream after 2007.

Conclusion:

OBJ's government has something to show for its power projects. It is left for auditors, engineers and other experts to determine how much billions justifies that achievement."

2 Likes 1 Share

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by hakeem4(m): 3:11am On May 23, 2018
Yet in spite of this the truth is that the record of the Obasanjo government in the power sector was not nearly as bad as many Nigerians have been led to believe. Let us take the frustrations, the bitterness, the emotion and the sentiments out of it and instead let us look at the facts. And here they are. In 1999 when Obasanjo was elected into office Nigeria was only generating 1200 megawatts per day. By 2007 this figure had increased to just over 4000 megawatts per day despite all the daily sabotage that was going on throughout those years. All the additional, vast, complex and extreemly expensive equipment that we needed to import in order to lift our power generation to the next level of over 10,000 megawatts per day arrived at our ports three days after President Obasanjo left office and just after President Umaru Yar’adua was sworn in. Now let me share with you exactly what Yar’adua did with that equipment when he came in. Instead of clearing them at the ports, sending them to the to the relevant sites all over the country and installing them he simply refused to let them into the country, he refused to pay the custom duties on them or waive it and he left them to rot at the ports. He did this for one reason and for one reason alone, so that he could lie to the whole world that Obasanjo had done virtually nothing for the power sector between 1999 and 2007.

3 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by MANNABBQGRILLS: 3:31am On May 23, 2018
Paper talks.....

Where is/was the power?!

5 Likes 1 Share

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by MANNABBQGRILLS: 3:32am On May 23, 2018
I can see how Nigeria was like America with 24 hours electricity when OBJ was the President.

Oshisko!!

5 Likes 1 Share

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by Mikeross62: 3:46am On May 23, 2018
Where is the light that I or we can't see

3 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 3:47am On May 23, 2018
Another reality check during Obasanjo's tenure could be captured below;
There was never any $16B purportedly spent on power in 8 years of OBJ government. Add all the budgetary allocation for the 8 years and the NIPP project inherited by Yar'adua and Jonathan administration which was $5.2B and as at the time of Faruq Lawan panel only $1.6B was drawn against the Letter of Credit at the CBN against equipment supplied by the different contractors. Today, most of the projects have been delivered and commissioned and others are waiting to be connected to feedstock (Gas). It was all politics.
In fact Geregu power project was delivered and commissioned ahead of schedule by Siemens. A record and the only gas powered generating plant in northern Nigeria.

2 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by hakimi1974(m): 3:51am On May 23, 2018
the monies that was frittered away by obasanjo and his thieving gangs in active connivance with a fantastically corrupt national assembly was actually in the region of between 10-12 billion dollars. it's just that most nigerians have selective amnessia, i remember when this scandal blew open, honourable olumelu was almost made a scape goat untill he threatened to open pandora's box. and that made e.f.c.c to back peddalled. and of course nigerians being who we are, as if dem swear for us, forgot about it and everything died a natural death. now you see why a THIEVE like obasanjo will always prance about like a featheress peacock? because we forget EASILLY.

5 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 4:05am On May 23, 2018
hakimi1974:
the monies that was frittered away by obasanjo and his thieving gangs in active connivance with a fantastically corrupt national assembly was actually in the region of between 10-12 billion dollars. it's just that most nigerians have selective amnessia, i remember when this scandal blew open, honourable olumelu was almost made a scape goat untill he threatened to open pandora's box. and that made e.f.c.c to back peddalled. and of course nigerians being who we are, as if dem swear for us, forgot about it and everything died a natural death. now you see why a THIEVE like obasanjo will always prance about like a featheress peacock? because we forget EASILLY.

Actually, you are the one that forgets easily,the truth is the $16 billion figment of imagination figures was politics in tone and when the opportunity came for Obj to clear all doubts he did that perfectly well through his Senior Special Assistant, Seke Somolu, who was the head of the Power Sector Reform and Coordinator, NIPP Project. Actually, all that was spent was $6.5b after all the reconciliation of figures. Indeed as far as Seke Somolu was concerned from his own records, what was spent was $6.3b. He drew the attention of Yar'Adua to this which enraged him. He flawed up because Seke spoke up when he saw that the orchestration of the falsehood was being given fresh oxygen almost on a daily basis to rubbish Obj. He thought he needed to speak as someone who should know, a step Yar'Adua considered an insubordination and embarrassing after he had spoken to the public on the matter. It was the figure of $6.5b Obj himself filed before the Senate. That was what led to Seke Somolu's sack by Yar'Adua. Seke sought to educate us saying $16b was voted but warrant was issued for no more than $6.3b spent largely on orders for turbines which could only be manufactured to specifications since they could not be picked from department store shelves. Part of the disbursements also went into drawings, building of bridges on which the turbines would be ferried and compensation for communities from whom pieces of land were acquired. And much more.

2 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by hakimi1974(m): 4:18am On May 23, 2018
?

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by Dumdumfashion(f): 5:24am On May 23, 2018
True or not I know then we dey get light wella pass now. It's just a hopeless situations where I am presently

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by buhariguy(m): 5:39am On May 23, 2018
Dumdumfashion:
True or not I know then we dey get light wella pass now. It's just a hopeless situations where I am presently
ask every sensible person, if it is not now you enjoy more light despite more population, more industries and services.

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by HoluwarTohbar(f): 6:08am On May 23, 2018
buhariguy:
ask every sensible person, if it is not now you enjoy more light despite more population, more industries and services.
...add more job loss, poverty, insecurity and hopelessness.

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by krasican(m): 7:23am On May 23, 2018
tomakint:
"" About the OBJ's $16B power project controversy, Dr Nura Alkali posted this: �

"How true is the statement that "OBJ's government spent $16 billion on power and had nothing to show for it"?

Fact Checks:

1. By May 1999 when OBJ took office, Nigeria had seven functional power plants generating 1,500 mW daily. These were Kainji, Jebba and Shiroro hydroelectric plants; and Egbin, Afam, Delta and Sapele gas thermal plants.

2. The two coal thermal plants at Orji River and Ijora were non-functional for lack of coal and obsolete equipment.

3. During 1999-2007, the FGN built six gas power plants now supplying electricity to the national grid. They include Afam II (276mW), Papalanto (330mW), Geregu (414mW) and Omotosho (330mW), all completed by May, 2007.

4. A fifth plant at Alaoji, Delta State (545Mw), was under construction. A sixth plant was under construction at Ikot-Abasi, Akwa-Ibom State (145Mw). It was a state government partnership with the FGN.

5. Also during 1999-2007, seven states initiated power projects under the NIPP Program with FGN support (though not partnerships) at: Sapele (Delta State), Egbema (Imo), Ehobor (Edo), Gbaram (Bayelsa), Calabar (Cross-River), and Omoku (Rivers).

6. In the private sector, the Agip oil company built and commissioned a 480Mw thermal plant at Okpai, Delta State.

7. Two hydroelectric projects at Zungeru (Niger State) and Mambilla (Taraba State) were at the design and conception stage by 2007. Construction work started at Zungeru (700mW) in 2013, to be completed in 2020, while construction work at Mambilla (3,050mW) started only in 2018.

8. During 1999-2007, the FGN also rehabilitated existing power plants at Kainji, Egbin and Shiroro, which were all performing far below capacity due to accumulated neglect.

9. Also during 1999-2007, the FGN initiated new power transmission projects (though most of them commenced after 2007) and passed into law the Power Sector Reform Act which allowed the privatization of NEPA/PHCN.

Summary:

Today, Nigeria owes at least 2,520 mW of her daily power generation to FGN policies conceived and executed during 1999-2007. That excludes investments in power transmission and distribution, as well as FGN support for NIPP projects which came on stream after 2007.

Conclusion:

OBJ's government has something to show for its power projects. It is left for auditors, engineers and other experts to determine how much billions justifies that achievement."








$16b NIPP funds: THE FACT-SHEET



Why was a whopping $16 billion invested in the National Integrated Power Project (NIPP)? This is a question that has lingered for more than a decade. Managing Editor Yusuf Alli writes on while the multi-billion power sector investment did not yield the desired result.

LIKE a recurring decimal, the debate on what happened to the $16 billion power project vote yesterday returned to the front burner of public discourse.

President Muhammadu Buhari said Nigerians deserve to know why there was no corresponding power supply in the homes and business premises after the administration of former President Olusegun Obasanjo for disbursed whopping $16 billion cash on power projects.

He threw the jibe when the Nigerian Customs Service Comptroller-General, Col. Hameed Ali Presidential (rtd) led members of the Buhari Support Organisation (BSO) to the State House in Abuja yesterday.

The power project budget has been a subject of controversy since expiration of President Olusegun Obasanjo’s tenure on May 29, 2007.

In 2008, the House of Representatives described the $16 billion spent on power projects between 1999 and 2007 as “a colossal waste.”

Also in 2016, a Non-Governmental Organisation (NGO) the Socio-Economic Rights and Accountability Project (SERAP) called for a probe into the disbursements.

The group specifically asked the Chief Justice of Nigeria (CJN) “to appoint an independent counsel to investigate allegations of corruption in the spending of $16 billion on electricity by the government of former President Olusegun Obasanjo between 1999 and 2007”.

SERAP said its request was brought “pursuant to Section 52 of the Independent Corrupt Practices and Other Related Offences Act 2000, and the letter and spirit of the Act, and the object and purpose of the 1999 Constitution (as amended).”

Speaking at the Sixth Annual Trust Dialogue, organised by Media Trust Limited, former House of Representatives Speaker Dimeji Bankole, shed more light on the issue.

He told the audience: “As for the power probe, $16 billion was truly appropriated but $13.5 billion was released. For your information, we are going to consider that report. We will take a whole week and we will do our recommendations live on television.

“We are not interested in the personality involved, we are dealing with institutions. Our recommendations will be on how to strengthen those institutions such that we will never have a repeat of this kind of thing again.”

The ad-Hoc Committee on Power Probe in the Green Chamber gave insights into why the nation was in darkness despite the huge cash withdrawal from the Excess Crude Account (ECA).

The 2009 Report of the then Ndudi Elumelu panel was submitted to Bankole.

It said that $13.278 billion was spent on power projects between 1999 and 2007.

The committee recommended the termination of 13 contracts and the review of 10 others.

According to the report, about 15 contracting and consulting companies were to be investigated by the appropriate agencies.

These highlights were contained in the report of the committee on Power Generation Transmission and Distribution between June 1999 and May 2007.

The Elumelu Committee was put in place by the House on January 31, 2008.

The report, which was exclusively obtained by The Nation, also indicated that the Central Bank of Nigeria (CBN) and the Office of the Accountant-General of the Federation OAGF could not account for the whereabouts of $1 billion.

The committee sought investigation of 18 people involved in power projects between 1999 and 2007 by anti-graft agencies Economic and Financial Crimes Commission (EFCC) and Independent Corrupt Practices and other Related Offences Commission (ICPC).

Among those recommended for probe in the National Integrated Power Project (NIPP) report was Chief Obasanjo, under whose watch the cash was withdrawn and spent

Others are: former governors Liyel Imoke (Cross River) and the late Olusegun Agagu (Ondo), who were Power Ministers; former Minister of State for Energy Abdulhamid Ahmed;  a former Managing Director of the Power Holding Company of Nigeria (PHCN) Joseph Makoju;  the ex-Chief Executive Officer of Transmission Company of Nigeria (TCN) G.O.P Osakue;  TCN Transmission Head C.E. Ifesie; Acting General Manager (Lines) Mike Ezeudenna; Technical Committee Chairman/General Project Manager C. N.O. Nwachukwu; Technical Committee Deputy Chairman I. Onuoha and Niger Delta Power Holding Company NDPHC/NIPP Managing Director J. A. Olotu, among others

The report said in part: “From the oral and documentary evidence, it was clearly established that the total expenditure in the power sector during the period 1999-2007 was $13, 278,937,409.94 billion.

“Indeed, had the supplementary budget of the power sector in 2007 been implemented, the expenditure could then have been over $16 billion reported by the Honourable Speaker of the House of Representatives.

“There are also unfunded commitments to the tune of $7.265 billion for NIPP projects as at May 29, 2007.

“There is another $1 billion for PHCN capital projects awarded between 2000 and 2007, which have been captured in the 2008 Appropriation Act.

“Additionally, the total commitment of the NNPC and its Joint Venture partners (of which the Federal Government, through the NNPC has an average of 51 per cent interest) towards the Independent Power Plants (IPP), gas sources development, gas transmission and metering of JV IPPs, PHCN power plants and NIPP power plants, according to the submission of the acting GMD of the NNPC is $7 billion, out of which about $1.62 billion has been expensed, leaving outstanding commitments of over $5.5 billion out of which the Federal Government will provide about $3 billion.

“Recognition of these unfunded commitments would bring the total (funded and unfunded) FGN expenditure commitments in the power sector to over $24.5 billion between 1999 and 2007.

“From the assessment done during the committee’s tour of the project sites, it is safe to conclude that no meaningful progress was made in the execution of power contracts.

“It is curious and quite strange that officials rush to pay contractors in full even before engineering design for the projects have been completed and approved.

“NIPP contracts were not only overpriced in comparison with PHCN contracts, they are also wide off the mark when viewed against comparable power stations in several parts of the world.

“A comparable review of the cost of power installations in varied regions of the world such as South Korea, Saudi Arabia, U.S.A, Taiwan, Hong Kong, Mexico and Chile showed that $10billion could have built plants to produce between 5,000 to 6,000 MW of electricity. But this amount failed to do so in Nigeria.

“Unfortunately, all NIPP payments were made without following due process. In its place, a process called ‘Waiver of Due Process Certification for Payment’ was adopted in flagrant disregard of Due Process Policy, thus paving the way for dubious and highly risky payments to contractors and consultants by the Federal Government.

“The committee found hard and widespread evidence of systematic over scoping of projects in order to inflate costs both in PHCN and NIPP.

“At least 15 transmission lines and substation projects have been identified. For example, the New Haven-Ikot-Ekpene 2x330kv Double Circuit Line was over-scoped by 49 per cent whilst the Afam-Ikot Ekpene 330kv line was over-scoped by more than 100 per cent.

“The estimated aggregate cost inflation identified so far for transmission projects is over N20 billion and this is recoverable from contractors.

“A clear example of project cost inflation is the proposed supply of 9No GE frame 9 gas turbines and auxiliaries at the cost of N185billion ($1.55 billion) awarded to Rockson International.

“In comparison, it is noteworthy that GE supplied 18No turbines of similar specification previously at about $404 million, including cost of Technical Assistance (TA) services and Long-Term Service agreements (LTSA). The implicit cost inflation on the 9No additional turbines and associated services exceeds $1.145 billion.

“Another example is the costing of the so-called change-order provisions for Alaoji Power Plant (Phase I) at a highly-questionable amount of $123 million.

“NIPP Distribution EPC contracts were awarded at costs averaging about 10 times the norm when compared to PHCN contracts costs for similar projects in the past five years. This 1,000 per cent cost inflation of the NIPP Distribution EPC work scopes translates to an aggregate overpricing of over N50 billion.”

On the funding of NIPP projects, the panel said: “The contracts were not funded from any Appropriation Act. What this means is that the National Assembly had no knowledge of the source of the funds of the NIPP projects.

“All the government functionaries who testified referred to what they termed Excess Crude Account as the source of funding.

On the role of the CBN, the panel’s report adds: “The committee is perturbed by the failure of the CBN governor to provide information in respect of Letters of Credit opened and where the money involving over $1 billion has been kept all these years

“It is necessary to note that the CBN refused to provide the committee with schedule of utilisation and draw-downs on Letters of Credit as well as interest accrued on unutilised balances.

“The committee strongly believes that these monies might be on fixed deposit accounts with some banks.

“In view of the apparent unwillingness of the CBN to cooperate with the committee in this matter, or provide the committee with a proper account of withdrawals from Excess Crude Account, the balance on the account, where the monies in respect of the unutilised Letters of Credit are kept and interest that have accrued thereto, we recommend that the EFCC be invited to investigate the Office of the Accountant-General of the Federation and the Central Bank of Nigeria in respect of the above issues relating to Letters of Credit opened.”

Besides recommending the termination of 13 contracts and the review of 10 projects, the panel recommended 15 contracting and consulting companies for investigation by appropriate agencies.

The projects for review are: Owerri-Ahoada-Yenagoa Trx Line; Alaoji-Calabar 330kv Dc Trx Line; Maiduguri 330/132kv S/S; Alaoji-Umuahia 132kv DC Trx Line; Gombe Damaturu-Maiduguri 330kv Trx Line; Calabar 330/132/33kv S/S; Arochukwu 132/33kv S/S; Ado-Ekiti 132/33Kv S/S; Umuahia 132/33kv S/S and Damturu 330/132/33kv S/S.

Those for cancellation are 2nd Benin-Onitsha 330Kv Trx Line; Gombe-Yola-Jalingo 330kv Trx Line; Katampe-National Stadium 132kv DC Trx Line; Umuahia- Mbalano 132 kv Trx Line; Mbalano-Okigwe 132kv Trx Line; Yola 330/132/33kv S/S; Umuahia-Ohafia 132 Trx Line; Ohafia-Arochukwu 132 kv Trx Line; Mbalano 132/33kv S/S; Okigwe 132/33kv S/S; Ohafia 132/33kv S/S; Akure-Ado-Ekiti 132kv SC Trx Line; and Onitsha  330/132/33kv S/S.

The report added: “Having reviewed the figures provided by the Ministry of Energy (Power), the NDPHC, the PHCN, the Office of the Accountant-General of the Federation , the CBN, the Revenue Mobilisation, Fiscal and Allocation Commission (RMFAC), the Office of the Auditor-General of the Federation, the Nigerian National Petroleum Corporation (NNPC), Shell Petroleum Development Company (SPDC), Federal Ministry of Finance and the Budget Office of the Federation, the Committee came to the following findings of fact:

“From all available evidence, the strategic plan for transforming the electric power sector envisaged in the Electric Power Sector Reform Act 2005 has not been faithfully prosecuted or diligently implemented.

“The investigation revealed widespread and flagrant abuse of legal process, resulting in avoidable waste, continued power failure and inestimable human suffering on the part of Nigerian masses.”

The report further highlighted specific lapses by the indicted institutions in charge of power reform.

Concerning the Ministry of Energy (Power), the committee said the Ministry, which ought to work with the NCP to “expeditiously complete the process of unbundling the defunct National Electric Power Authority as spelt out by the Act, did not live up to expectations.

“In this regard, the ministry failed in its duty to ensure that parastatals under its jurisdiction existed and carried out their functions in accordance with laws of the land.

“The committee strongly believes that no official or institution of government has a right to override the law or operate as if the law did not exist.

“There is no need for parliament to make laws at all as if the laws are to be flagrantly ignored and abused by institutions and officers of government. Without rules, the country has not even started on the road to progress.

“It was found that either by acts of omission or commission, the Federal Ministry of Energy (Power) turned a blind eye to the illegality of PHCN continuing to oversee the power sector long after the expiry of the period allowed for its existence under the law.”

On the NCP, the committee said from the evidence adduced by relevant sector operators during the hearings, “it is apparent that the NCP since 2006 abdicated its responsibilities in respect of the management of the reforms in the power sector.

“Section 3, sub-section 1 of the Electric Power Sector Reform Act 2005 authorised the NCP to fix an initial transfer date of the assets and liabilities of PHCN to the successor companies contemplated by and prescribed by the Act.

“The NCP via an official Gazette fixed the transfer date to be July 1, 2005. The same Act authorised and mandated NCP in Section 10(1) to not later than one year from the initial transfer date to transfer the assets and liabilities of PHCN to the unbundled successor companies.

“The NCP directed PHCN to transfer its assets, employees, liabilities, rights and obligations to the 18 companies arising out of the unbundling exercise commencing March 1, 2006 and also adopted June 30, 2006 as the transfer date. Flowing from the above, the PHCN ceased to exist as of that date and should have been wound up immediately thereafter.”

Regarding PHCN, the committee said by virtue of ESPRA Act 2005, it is an illegal body.

The report said: “In spite of the above provisions of the law, the PHCN continued to operate, in direct contravention of the ESPRA Act 2005 as well as the gazetted orders at the NCP.

“From the testimony of the CEOs of the unbundled companies, which was corroborated by the coordinator of PHCN liaison unit, it is clear that the transfers contemplated and mandated by the Act were only carried out cosmetically.

“The continued existence of PHCN as an amorphous or inchoate agglomeration of dysfunctional and powerless successor companies or a resurgent NEPA is a clear violation of the law and is not imbued with any potential to grapple with the grave power challenges facing the nation.”

“The PHCN is stinking of large scale corruption,” the committee wrote in its report.

It went on: “The public hearing and site visits exposed high-level corruption and unspeakable inefficiency and waste in the execution of project and disbursement of funds meant for power projects.

“From all available facts, a prima facieevidence of corruption and inappropriate disbursement of funds amounting to corrupt practices and economic sabotage have been established.

“In spite of the cosmetic unbundling, nothing was done to check the culture of impunity that had eaten deep down into the administrative structure of NEPA/PHCN over the decades.”

Another aspect of the report bordered on the funding of the controversial NIPP.

The committee said the funding strategy was abandoned for withdrawals from Excess Crude Account by the Obasanjo administration.

It added: “Contrary to the funding strategy for the MSPSND/NDHC/ NIPP projects articulated by the Steering Committee and the Presidential Implementation Committee of NIPP and approved by President Obasanjo in June 2005, funding for these projects became solely dependent on withdrawals from the Excess Crude Account.

“From the testimony of the former Finance Minister Mrs. Ngozi Okonjo-Iweala and the Minister of State for Finance, Mrs. Nenadi Usman, funding of the NIPP from the Excess Crude Account was conceived as a loan to be repaid to the accounts of the Federal, State and Local Governments at a later date.”

 

Confusion

 

But the EFCC, in a report by its former Acting Chairman, Ibrahim Lamorde, cleared ex-President Obasanjo of any involvement in the NIPP fraud.

The report of the anti-graft agency said in part: “After an in-depth investigation and rigorous check on all documents relating to these contracts, the payments made so far, and the contractors handling the project, it is impossible to draw a nexus between the former President or any individual or companies associated with him and the proceed accruing from the contract payments.”

2 Likes

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by yemmight(m): 7:31am On May 23, 2018
Corruption in Power, Legislative, Executive, Judiciary all increased during Obasanjo's regime. He should not claim to be saint.

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by CodeTemplar: 8:22am On May 23, 2018
OBJ was better compared to Buhari. The man is so insecure aboutvhis second term he goes after anything that threatens his reelection.

1 Like

Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 11:46am On May 23, 2018
@krasican I really appreciate your contribution and I took my time to read through the conflicting reports but will still appreciate more revelations of what actually transpired in those dark ages of 1999-2007 under Obasanjo in the power sector.
Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by Enice(m): 1:33pm On May 23, 2018
tomakint:
"" About the OBJ's $16B power project controversy, Dr Nura Alkali posted this: �

"How true is the statement that "OBJ's government spent $16 billion on power and had nothing to show for it"?

Fact Checks:

1. By May 1999 when OBJ took office, Nigeria had seven functional power plants generating 1,500 mW daily. These were Kainji, Jebba and Shiroro hydroelectric plants; and Egbin, Afam, Delta and Sapele gas thermal plants.

2. The two coal thermal plants at Orji River and Ijora were non-functional for lack of coal and obsolete equipment.

3. During 1999-2007, the FGN built six gas power plants now supplying electricity to the national grid. They include Afam II (276mW), Papalanto (330mW), Geregu (414mW) and Omotosho (330mW), all completed by May, 2007.

4. A fifth plant at Alaoji, Delta State (545Mw), was under construction. A sixth plant was under construction at Ikot-Abasi, Akwa-Ibom State (145Mw). It was a state government partnership with the FGN.

5. Also during 1999-2007, seven states initiated power projects under the NIPP Program with FGN support (though not partnerships) at: Sapele (Delta State), Egbema (Imo), Ehobor (Edo), Gbaram (Bayelsa), Calabar (Cross-River), and Omoku (Rivers).

6. In the private sector, the Agip oil company built and commissioned a 480Mw thermal plant at Okpai, Delta State.

7. Two hydroelectric projects at Zungeru (Niger State) and Mambilla (Taraba State) were at the design and conception stage by 2007. Construction work started at Zungeru (700mW) in 2013, to be completed in 2020, while construction work at Mambilla (3,050mW) started only in 2018.

8. During 1999-2007, the FGN also rehabilitated existing power plants at Kainji, Egbin and Shiroro, which were all performing far below capacity due to accumulated neglect.

9. Also during 1999-2007, the FGN initiated new power transmission projects (though most of them commenced after 2007) and passed into law the Power Sector Reform Act which allowed the privatization of NEPA/PHCN.

Summary:

Today, Nigeria owes at least 2,520 mW of her daily power generation to FGN policies conceived and executed during 1999-2007. That excludes investments in power transmission and distribution, as well as FGN support for NIPP projects which came on stream after 2007.

Conclusion:

OBJ's government has something to show for its power projects. It is left for auditors, engineers and other experts to determine how much billions justifies that achievement."
2500MW of electricity by OBJ? utter rubbish. Are you saying that GEJ/Yaradua did not contribute even 1kw of electricity in 8 years. Just because of the hatred you have for PMB you wants to twist history? You lie.
Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 2:29pm On May 23, 2018
Enice:
2500MW of electricity by OBJ? utter rubbish. Are you saying that GEJ/Yaradua did not contribute even 1kw of electricity in 8 years. Just because of the hatred you have for PMB you wants to twist history? You lie.
I don't think you have s clearer understanding of what you quoted please you can read it again but this time around slowly and meditatively.
Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by Enice(m): 3:15pm On May 23, 2018
tomakint:

I don't think you have s clearer understanding of what you quoted please you can read it again but this time around slowly and meditatively.
Nyamirin keep quiet. You cannot change history on this.
Re: How True Is The Statement That "Obj's Government Spent $16 Billion On Power" by tomakint: 3:45pm On May 23, 2018
BUHARI, LEAVE LIES FOR LAI MOHAMMED: THERE WAS NEVER A TIME NIGERIA SPENT $16B ON POWER IN THE LAST 45 YEARS.

-Kehinde Ayoola JP (Writes Buhari Exposing Detail Of Expenses On Power From 1973 To 2015 That Buhari Took Over)

Dear President Buhari,

Sir, it is sad you can push fictitious figures out just to score political point when you have all the available information at your fingertip.

I believe this type of narratives suits the person of Alhaji Lai Mohammed.

There was never a time Nigeria spent $16bn on the dead power sector during the Obasanjo era or in the last 45years.

The chronological timeline is shared below

1973-1998

The Nigerian government spent $1.83bn on installing 5.715GW Hydro and Gas power plants.

Pls note the Nigerian Naira was stronger than the USD from 1973 till 1985 and it started tumbling from 1986 onwards.
++++++++++++++++++++++++++++++
*1999-2015*

Our federal lords spent

N955bn+ which was released to the power ministry within the year captured

as follows:

*1999 – N11.206 billion appropriated, N6.698billion released;

*2000 – N59.064billion appropriated, N49,785 billion released;

*2001 – N103. 397 billion appropriated, N70.927 billion released;

*2002 – N54.647billion appropriated, N41.196 billion released;

*2003 – N55.583billion appropriated, N5.207billion released;

*2004 – N54.647billion appropriated, N54. 647billion released;

*2005 – N90.283 billion appropriated, N71.889 billion released;

*2006 – N74.308 billion appropriated, N74. 3 billion released;

*2007 – N100 billion appropriated, N99.8 billion released;

*2008 – N156 billion appropriated, N112 billion released;

*2009 – N89. 5 billion appropriated, N87billion released;

*2010 – N172 billion appropriated, N70 billion released;

*2011 – N125 billion appropriated, N61 billion released;

*2012 – N197. 9 billion appropriated, N53. 5billion released;

*2013- N146 billion appropriated, N49 billion released;

*2014 – N69.8 billion appropriated, N48 billion released; and,

*2015 – N5. 240billion appropriated, no record but we can say it is not 100% funded.

N155b released as subsidy fund for MYTO Multi Year Tariff Order (MYTO)

The funds were given for a period of five years. A breakdown of the interventions funds are as follows:

*2009 – N30.8 billion

*2010 -N43.2 billion

*2011 – N37.0 billion

*2012 – N11.5 billion

*2013 – N32.6 billion.

$8.23bn was released to NIPP from ECA to push our installed generating capacity with 5GW and OBJ regime released $3.08bn while the balance was spent between 2007-2015

Federal Government made $2.238 billion about N358 billion from the sale of 15 Power Holding Company of Nigeria, PHCN.

Adding all up with what we earned we spent a total of $13.38bn between 1999-2015.
===============================
The Presidential Review Panel on the NIPP set up by the NEC, said the panel found that as at 2007, total project allocations/ estimates to NIPP was $10.231 billion inclusive of the $2 billion Federal Government counterpart funding for Mambilla Hydro Power project and $1.4 billion for additional nine turbines.

out of these commitments, $3.08 billion was funded and scrutinised with advance payment guarantees from “first class” Nigerian banks and Letters of Credits issued by the Central Bank of Nigeria (CBN). $1.5 billion of the sum is still in the custody of the banks.

At no time did OBJ spend $16bn on power or the Nigerian government spent $16bn in the last 45years. it is outright falsehood peddled from the highest office of the Federal Republic of Nigeria.

(1) (Reply)

Boko Haram’s Shekau Critically Ill / Asari Dokubo Blasts Plateau, Benue Residents For “crying Like Babies” Over Killi / 2019 Presidency: Why I Call Atiku Corrupt – Keyamo Tells Senate

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 93
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.