Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,153,356 members, 7,819,275 topics. Date: Monday, 06 May 2024 at 01:37 PM |
Nairaland Forum / Nairaland / General / Politics / Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State (6732 Views)
This Is Asiwaju Tinubu's Greatest Achievement In Lagos State / 2019: Akpabio’s Defection Unsettles Governor Udom, PDP / Governor Udom Stops His Convoy To Buy From Roadside Banana Sellers (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:11pm On May 31, 2018 |
Uyo/Ibesikpo Asutan/Uruan/ Nsit Atai Federal Constituency) UYO LGA 1. Construction of Dr. Ann Ward Gynecology block at St. Luke’s Hospital, Anua, Uyo. 2. Rehabilitation of administrative block and wards at St. Luke’s Hospital, Anua, Uyo. 3. 2 x 5 MVA, 33/11 KV injection substation, Edet Akpan Avenue, Uyo. 4. Completion of the State Secretariat Annex 5. Flood control at Nsikak Eduok Avenue, Uyo 6. 21 Storey modern Office Complex loading… 7. Intervention in Gully erosion. intervention; Etim Umana, St. Luke’s Hospital Gully Erosion sites in collaboration with World Bank Assisted Nigeria Erosion and Watershed Management Project (NEWMAP) 8. Face lift of the Idongesit Nkanga Secretariat Complex, with tarred roads and paved walk ways from the Civil Service Auditorium to Block 5 and adjoining car parks. 9. Ongoing construction of high-rise and investment buildings at the central business district of the Uyo metropolis. 10. Ongoing construction of 8,500 capacity International Worship Centre. 11. Dualization of 25.0km Uyo – Ikot Ekpene Road. 12. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono) 13. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I 14. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road 15. Construction of 2.1km Road around State Secretariat Annex and Believers Assembly, Mbiabong Etoi, Uyo 16. Construction of 1.5km Nsikak Eduok - Tropicana Outfall Drain 17. Construction of 1.05km Information Drive, Uyo 18. Construction of the 6.1 km Atan Offot Road in Uyo 19. Construction of 19.317km Anua – Mbak – Ishiet Road 20. Construction of 5.1km Ewet Housing Extension 21. Remodeling/Rehabilitation of Selected Roads, Strategic Junctions & Roundabouts In Uyo Metropolis, Phase I 22. Construction of 1.3km Ntiedo Udosen Street 23. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road 24. Citrus & Pineapple hybrid plantation, Uyo Village Road 25. Construction of Akparen Street 26. Construction of Ibiono Lane 27. Construction of Etoi Street 28. Construction of Udotung Ubo Lane 29. Construction of Afaha Etok Ibesikpo 30. Construction of Vision Close, Nsukara 31. Construction of Akpasak Extension 32. Construction of Kastrophy Hotel Road Off D Line, Ewet Housing 33. Construction of Graceland School Road, Shelter Afrique 34. Construction of Aka Community School Road with Spur to Aka/road by ‘C’ Division Police Station 35. Construction of Akpa Ube Close by IBB Opposite Ibom Hall 36. Construction of Akpa Ube Crescent by AKEES Office Opposite Ibom Hall 37. Proposed Completion of Nung Ette – Shelter Afrique Dual Carriage 38. Construction of Access Road to Atlantic FM and its Environs 39. Construction of All Grace School Road and Prof. Offiong Street, Shelter Afrique 40. Construction of Youth Avenue (Winners Chapel Mbiabong Road) in Uyo 41. Emergency Completion of Ediye Street by 4Lane, Ewet Housing Estate 42. Emergency Completion of Stallion Hotel Road Linking G-Line, Ewet Housing Estate, Uyo 43. Emergency Completion of Akpan Andem Street, immediately after 4Lane traffic light, Itiam/Ewet Housing, Uyo 44. Emergency Completion of Akpan Andem Street, immediately after 4-Lane traffic light, Itiam/Ewet Housing, Uyo 45. Construction of Ukim Close off D-Line, Ewet Housing Estate. 46. Construction of Akpasak Est. Access Road Inter-ministerial Projects: 47. Renovation of 7 Classroom Block at P/S Ikot Ntuen Oku 48. Renovation of Library Block at Vocation Sch. Ikot Ntuen Oku 49. Electrification at Atai Obio Offot 50. Electrification at Nung Ukim Ikono 51. Renovation of 3 Classroom Block at P/S Ikot Ntuen Oku 52. Renovation of 2Hall/ Classroom at CCSS, Four Towns 53. Construction of 3Classroom at CCSS, Four Towns 54. Renovation of a long Hall at Group Sch. Ikot Odung/ Ikot Obio Mkpong 55. Construction of Civic Centre at Atan Offot 56. Electrification at Ifa Ikot Idang Source http://mrudomemmanuel.com/projects/projects-in-uyo-senatorial-district You can send your feedback/criticism/appreciation/suggestion/complaints directly to Governor Udom Emmanuel via his personal email udom.emmanuel@akwaibomstate.gov.ng |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:13pm On May 31, 2018 |
IBESIKPO ASUTAN LGA 1. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road 2. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road 3. Construction of Afaha Atai Village Crescent 4. Construction of Afaha Ikot Obio Nkan 5. Construction of 1.0km Redeem Church Road, Afaha Etok, Ibesikpo LGA 6. Cassava Processing Factories located at Nung Udoe, Ibesikpo Asutan Inter-ministerial Projects: 7. Production of 1000No Dual Desk 8. Renovation of 4 Classroom Block at Luth. Ps Nung Udoe 9. Construction of Exams hall at Sec. Comm. Sch. Iwaia Ikot Akpaedung 10. Renovation of Classroom Block at Govt. P/S, Aba Ukpo 11. Renovation of 4Classroom at St Bridget PS, Nung Ette 12. Renovation of 3Classroom at St Bridget PS, Nung Ette 13. Renovation of 4Classroom at Govt P/S, Akpa Utong 14. Provision of Solar Powered Borehole 15. Construction of Civic Centre at Mbikpong Ikot Edim 16. Completion of OPD at PHC, Nung Udoe Source http://mrudomemmanuel.com/projects/projects-in-uyo-senatorial-district You can send your feedback/criticism/appreciation/suggestion/complaints directly to Governor Udom Emmanuel via his personal email udom.emmanuel@akwaibomstate.gov.ng |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:14pm On May 31, 2018 |
URUAN LGA 1. Construction of 19.317km Anua – Mbak – Ishiet Road 2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur in Itu/Uruan LGAs under the Alternative Project Funding Approach (APFA) 3. Construction of 9.0km Mbiaya Uruan - Ita – Ikpa – Mbiakong Uruan road with 60m Span Bridge in Uruan Local Government through Alternative Project Funding Approach (APFA) 4.Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur 5.Renovation of Ituk Mbang General Hospital 6. Vegetable Green House 7. Akwa Prime Hatchery 8. Cattle ranch loading… Inter-ministerial Projects: 9. Construction of Assembly Hall at Methodist P/S Adadia 10. Construction of 4 Classroom Block at Methodist P/S Adadia 11. Construction of 3 Classroom Block at Ekpene Ibia 12. Renovation of 4 Classroom Block at Ekpene Ibia 13. Renovation of Assembly Hall at AME Zion School Ndon Ebom 16. Renovation of 3Classroom at AME Zion School Ndon Ebom 14. Renovation of Civic Centre at Ekim Enen 15. Renovation of 4 Classroom Block at Ikpa uruan 16. Electrification at Ikot Inyang Esuk 17. Supply of 220No CBT Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:16pm On May 31, 2018 |
NSIT ATAI LGA 1. Construction of 6.0km Idiaba – Nda Nsit - Ikot Abasi (Nung Udoe) Road in Nsit Atai Inter-ministerial Projects: 2. Renovation of 4 Classroom Block at P/S Essien Itiaba/ Ikot Asua 3. Renovation/ Extension of Assembly Hall at Sec. Sch. Ikot Akpan Ike 4. Construction of 3 Classroom Block at Comm. Sec. Sch. Ikot Asua 5. Renovation of 4Classroom at QIC P/S, Ikot Ekpot 6. Renovation of 3Classroom at CPS, Ikot Akpan Ike 7. Production of Dual Desk 1000 8. Water and Sanitation facility Projects at Ibakang, Odot 11, Nda Nsit, Ikot Akpanike, Ikot Itie Udung communities in collaboration with EU Airport Projects: (Uruan , Nsit Atai) 1. Construction of 2nd airport Runway 2. Upgrade of Airport main runway to category 2 3. Construction of Ibom International Airport 2x15 MVA Injection Substation. |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:18pm On May 31, 2018 |
(Itu/Ibiono Ibom Federal Constituency) ITU LGA 1. Dualization of 25.0km Uyo – Ikot Ekpene Road. 2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur 3.Itu/Uruan Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur 4. Erosion Intervention Ekim Itam along Calabar Itu highway 5. West Itam Sports Complex Inter-ministerial Projects: 6. Completion of Hall at West Itam Sec. Sch. 7. Renovation of 2No Classroom Block at P/S Ekitam 1 8. Electrification at Ikot Ekang 9. Supply of 220No CBT Desk 10. Renovation of 2No 6Classroom Block at West Itam Secondary School 11. Renovation of 4No 5Classroom Block/ Office at West Itam Secondary School 12. Renovation of 4No 4Classroom Block at West Itam Secondary School 13. Renovation of 3Classroom Block/Office at West Itam Secondary School 14. Completion of Fence at PHC West Itam 15. Construction of Emergency Unit at PHC West Itam 16. Renovation of Library/Workshop/Classroom Block at Comm Sec Sch, Ibiaku |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:20pm On May 31, 2018 |
IBIONO IBOM LGA 1. Dualization of 25.0km Uyo – Ikot Ekpene Road. 2. Construction of 3.5km Ikot Udom Road with 15m Span Bridge in Ibiono Ibom LGA 3. Take-over of Union Secondary School, Ibiaku Inter-ministerial Projects: 4. Renovation of 4No Block at General Hospital, Use Abat 5. Renovation of 4Classroom/ Hall at HTS, Ikot Akpabio 6.Renovation of Hall/Office at HTS, Ikot Akpabio 7.Renovation of 3 Classroom at St Paul CS, Nkwa Ibiono 8.Renovation / extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Ekpe 9. Renovation/ extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Esuk 10. Production of 500No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:23pm On May 31, 2018 |
(Etinan/Nsit Ibom/Nsit Ubium Federal Constituency) ETINAN 1. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridge 2. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono) 3. Resuscitation of Peacock Paint Industry Reconstruction and equipping of General Hospital, Etinan 4.Pencils and Toothpick Factory Km2, Uyo-Etinan Road, Ekom Iman, Etinan. Inter-ministerial Projects: 5. Renovation of 2No Block at Etinan Institute 6. Renovation of Block 4 at Salvation Army Sec. Sch. Efa 7. Renovation of Admin Block at General Hospital, Etinan 8. Reconstruction of Ass Hall at ACCS, Iwoetor 9. Renovation of 4Classroom at Salvation Army P/S, Ekom Iman 10. Construction of Classroom at CSS, Asuna 11. Renovation of 6Classroom Block at Salvation Army Sec. School, Efa 12. Renovation of 3Clrm Block at Salvation Army Sec. School, Efa 13. Renovation of Prin Quarters at Salvation Army Sec. School, Efa 14. Renovation of Staff Quarters at Salvation Army Sec. School, Efa 15. Construction of Gatehouse/Sec. at Salvation Army Sec. School, Efa 16. Renovation of Admin Block at Salvation Army Sec. School, Efa 17. Renovation of Assembly Hall at St. Theresa Edem Ekpat 18. Renovation of 4 Classroom Block at Govt School Ikot Eboh 19. Renovation of 6 Classroom Block at Ikot Nte 20. Production of 500No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:37pm On May 31, 2018 |
NSIT IBOM LGA 1. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road 2. College of Education Road Network Inter-ministerial Projects: 3. Renovation of 4 Classroom Block at Comp. Sec Sch, Obotim 4. Renovation of 4 Classroom Block at Apostolic Church Sec Sch, Ikot Oku Nsit 5. Renovation of Laboratory at Apostolic. Church Sec Sch, Ikot Oku Nsit 6. Renovation of 4 Classroom Block at Nsit People Grammar Sch 7. Construction 2No 3 Classroom at Sec Sch. Edebom I 8. Completion of Civic Centre at Mbiokporo II 9. Renovation of Civic Centre at Ikot Offong Nsit 10. Renovation of Classroom Block/office at Sec Sch Mbiokporo II 11. Supply of 220No Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:39pm On May 31, 2018 |
NSIT UBIUM 1. Construction of 9.76km Ancillary Roads in Nsit Ubium LGA 2. Construction of Ukat Aran-Obio Ubium - Ikot Ubo Road under APFA 3. Rice Farm/Mill, Nung Obong-Ubium 4. Cassava Plantation, Ikot Eyo Inter-ministerial Projects: 5. Construction of 4 Classroom Block at P/S Ikot Akpafuk 6. Renovation of 3Classroom at Ikot Imo/ Ikot Edikpe 7. Reconstruction of Assembly Hall at Govt Sch. Ikot Eyo 8. Renovation of 10No. Market Stalls at Ndukpoise 9. Provision of Solar Powered Borehole at Ikot Asang 10.Provision of Solar Powered Borehole at Obio Ekid 11.Production of 1000No. Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:21pm On May 31, 2018 |
PROJECTS IN EKET SENATORIAL DISTRICT (Eket, Onna, Ibeno, Esit Eket Federal constituency) EKET LGA 1. Construction/Remodeling of Selected Roads, Strategic Roundabouts/Junctions in Eket Metropolis (Phases 1 & II). (1.6km Dualized & 2.2km expanded Carriageway (10m) 2. Dualization of the 19.5km Eket – Ibeno Road 3. Dualization of 23.4km Eket – Etinan Road with 3Nos Bridges 4. Construction of 3.0km Osiok Iko Eket 5. Construction of 2.7km Ikot Abasi Road in Eket Local Government 6. Renovation of Secondary School Blocks/Fence at Ikot Akpan Ishiet 7. Construction of 2.7km Ikot Abasi Road in Eket Local Government 8. IKot Udota – Ikot Afaha Road (2.0km) 9. Nim Nnong Road (1.6km) 10. Ikot Ibiok – Ikot Udota Raod (0.9km) 11. Etebi Ikot Udota - Ikot Abasi 12. Ikot Udota Etebi Road (0.46km 13. Construction of 2.08km Assam Crescent in Ede Urua, Eket Local Government 14. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA) 15. Reconstruction of Eket Stadium Inter-ministerial Projects 16. Renovation of 2 No. Hostel/Classroom block (storey Buliding) at Government Secondary School Afaha Eket 17. Renovation of 2 No. Classroom Block at QIC School Ikot Udofa 18. Renovation 4 Classroom Block at Government Primary School Mkok 19. Renovation of 5 No. Classroom Block/Toilet at AME Zion Primary School Usung Inyang 20. Construction of Civic centre & Skill acquisition centre at Idua, Eket 21. Solar Power at Idua, Eket 22. Cassava Processing Factories located at Ikot Okudom, Eket LGA |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:22pm On May 31, 2018 |
ONNA LGA 1. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road 2. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs 3. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin L G As 4. Construction of 10.8km Awa – Nkana Road and 2.3km Ancillary Roads in Awa Village in Onna Local Government Area 5. Construction of 5.0km Mkpok Okat Road 6. Construction of 9.5km Ikot Ebekpo – Ikot Ebidang road with 1No Jetty 7. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridges 8. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road 9. Syringe Manufacturing Factory (Largest in Africa) 10. Electric Digital Metering Solutions Manufacturing Factory 12. Flour Mills loading… Inter-ministerial Projects 13. Renovation of 4 No. Classroom Block/Toilet at Primary School Atimkpat 14. Renovation of Classroom Block at Primary School Nung Uko Ekanem 15. Construction of fence/Gate House at QIC Primary School Awa 16. Solar powered Borehole at Ndon Eyo 17. Town Hall at Ikot Udo Essang 18. Solar powered Borehole at Ikot Udo Essang 19. Production of 220No. Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:24pm On May 31, 2018 |
IBENO LGA 1. Dualization of the 19.5km Eket – Ibeno Road 2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA) Inter-ministerial Projects 3. Renovation 3 classroom Block at Comprehensive High School, Inue Eyet Ikot 4.Renovation of Headmaster Quarters at Primary School Okorutip 5. Renovation of Physic/Chemistry Lab at Secondary Grammar School 6.Renovation of 3 Classroom Block at Primary School Opolum 7. Renovation of Assembly Hall/office at Government Primary School, Mkpanak 8. Renovation of Hostel Block at Secondary Grammar School Ukpenkang 9. Production of 1000No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:25pm On May 31, 2018 |
ESIT EKET 1. Construction of 13.13km Akpambiet Edo – Edida Edo – Ebeekpe road, Ndon Edim – Idung Akpantuen road with Spurs and Rehabilitation of 1.7km Uquo Isi Edoho – Edo road, in Esit Eket LGA 2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA) 3. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges Inter-ministerial Projects 4. Renovation 3 classroom Block at Methodist group school Etibi Esit Eket 5. Renovation 6 classroom Block at St Theresa Primary School Ntak Inyang 6. Renovation 6 classroom Block at Primary School Odoro Nkit 7. Construction of civic centre at Idung Atang Edem 8. Construction of Civic Centre at Ebighi Anwa Uquo 9. Solar Powered Borehole at Ebighi Anwa Uquo 10. Production of 220No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:27pm On May 31, 2018 |
(Ikot Abasi, Mkpat Enin, Eastern Obolo Fed. Constituency) IKOT ABASI LGA 1. Cocoanut plantation/Refinery 2. Secured license for generation of 685megawatt at Ibom Power Plant Inter-ministerial Projects 3. Renovation of 3 Classroom Blocks at Holy Child Convert School Essene 4. Renovation of 3 Classroom Block/Office at St. George Anglican Primary School, Ikot Abasi Urban 5. Renovation of 3 Classroom Block / Office at Primary School Atabrikang 6. Renovation of 10 Hospital Blocks at General Hospital Ikot Abasi 7. Renovated/Reconstructed Classroom at Saint Nicholas Primary School, Ikot Ekara 8. Production of 500No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:30pm On May 31, 2018 |
MKPAT ENIN LGA 1.Construction of 5.0km Ikot Usop – Ikot Edeghe – Ikot Ekpuk road with a 30m Span Bridge in Mkpat Enin 2.Construction of Temporary Access to AKSU Campus, Ikot Akpaden, Mkpat Enin 3. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs 4. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin Local Government Areas 5. Cocoanut Plantation/Refinery 6. Excellence Comprehensive Sec. Sch. Ikot Uya Inter-ministerial Projects 7. Renovation of 7 Classroom Blocks at Estang Secondary School Ekim 8. Renovation of 4 Classroom Blocks at Primary School Ikot Eyiene Mkpat Enin 9. Renovation of Hospital Block at Cottage Hospital Ikot Ekpaw 10. Solar Powered Borehole at Ikpa Ikono Ikot Ekpaw 11. Renovation of 4 Classroom Block at Saint John Primary School, Asong 12. Unity Hall at Ikpa Ibom, Ukam 13. Solar Powered Borehole at Ikpa Ibom, Ukam 14. Power sub-stations, Ekim 15. Production of 500No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:33pm On May 31, 2018 |
EASTERN OBOLO LGA 1. Cocoanut Plantation/ Refinery 2. Migrant Sch., Emeruke Inter-ministerial Projects 3. Renovation of 3 Classroom Blocks at Primary School Emeroke 4. Construction of 3 Classroom Blocks / Assembly Hall at Primary School Ikoro Inyang 5. Renovation of Classroom Block / Hall / Office at St. Silas Anglican School, Okoro 6. Production of 720No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:34pm On May 31, 2018 |
(Oron, Okobo, Mbo, Urue Offong/Oruko, Udung Uko Federal Constituency) ORON LGA 1. Dualization of the 13.5km 2. Okopedi – Oron Road by East-West Road Phase II 2. Emergency Works in the Completion of Oron Urban Road (6.3km) (Additional Works) 3. Construction of Gully Erosion Control Facilities at Oron/Isangedighi Road, Oron Urban Inter-ministerial Projects 4. Renovation 4 classroom Block at General Hospital, Iquita 5. Renovation 3 classroom Block at HCCS 6. Renovation 4 classroom Block at Primary School Oyoku Asang 7.Production of 500No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:36pm On May 31, 2018 |
OKOBO LGA 1. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I 2. Emergency Rehabilitation of Okopedi Road by Community Health Centre through Oti – Oron in Okobo Local Government Area 3. Take over of Community Comprehensive Sec. Sch., Ekeya 4. Airport Projects: a. Construction of 2nd airport Runway b. Upgrade of Airport main runway to category 2 c. Construction of Ibom International Airport 2x15 MVA Injection Substation Inter-ministerial Projects 4. Renovation 4 classroom Block at Community Secondary school Odobo 5. Renovation of 2 No. Block at General Hospital Amanong 6. Solar Powered Water at Primary School Udung Affiang 7. Renovation of 3 Classroom Block/office at Primary School Udung Affiang 8. Renovation of 3 Classroom Block/office at Government School Ekaya 9. Reconstruction of 3 Classroom block/office at Primary School Ebighi Etta / |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:37pm On May 31, 2018 |
Edu LGA 10. Construction of 3 Classroom block/office at St. Andrew’s Primary School OtiOro 11. Production of 220No. Dual Desk MBO 1. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA) 2. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges 3. Construction of 3.2km Road at Ibaka Leading to Delmar Petroleum Harbour and Tank Farm Inter-ministerial Projects 4. Renovation of 4 Classroom Block at St. Paul African primary school Ibaka 5. Renovation/construction of 2 No. 3 classroom Block/office at Primary School Uko Itak Eyulor 6. Electrification at Itak Eyulor 7. Renovation 5 Classroom Block/office at Community Secondary Sch.Udesi 8. Construction of Assembly Hall/2 No. Classroom Block at Primary School Oduo Ebughu 9. Renovation 4 Classroom Block at Enwang Comp. Secondary school 10. Renovation 4 Classroom Block at St. Michael Catholic School Eyonsek 11. Construction of 3 Classroom Block at Government School Eyo Uwe 12. Renovation of Assembly Hall at CSS, Edikor 13. Ibom Deep Seaport loading… 14. Production of 220No Dual Desk |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:42pm On May 31, 2018 |
I love this LGA by LG A listing. Udom is unarguably the best of his generation. 2 Likes |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:46pm On May 31, 2018 |
TonyeBarcanista are you from AKS or do you stay In AKS? Forget these publications and political achievements. The AKS people are hungry and crying. Their youths are jobless and a lot seem to be bleak about the state in recent Times. I reside in Uyo and I know what I'm talking about. 4 Likes |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:47pm On May 31, 2018 |
In sane society this man will be made President not Governor |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:48pm On May 31, 2018 |
ibibiofirstlady: Victor Attah and Godswill Akpabio are miles ahead of him. 4 Likes |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:48pm On May 31, 2018 |
ibibiofirstlady:Fixed! 3 Likes |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:49pm On May 31, 2018 |
kingreign:Is it the cry caused by Buhari? 2 Likes 1 Share |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:50pm On May 31, 2018 |
kingreign:Be objective |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:50pm On May 31, 2018 |
ibibiofirstlady: If you ask me, Na who I go ask? |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:51pm On May 31, 2018 |
ibibiofirstlady:I'm practical |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by buhariguy(m): 4:51pm On May 31, 2018 |
Is he not PDP governor? 419 governor, Like father like son, Like akpabio like udom, They will only used 50% of the revenue received All this project of classroom and hostels renovation and dual desks. And accelerated factory that has not yet laid the foundation. |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:54pm On May 31, 2018 |
kingreign:Akpabio did well and Udom is building on his legacy. Attah did not do anything for Akwa Ibom 3 Likes |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by buhariguy(m): 5:15pm On May 31, 2018 |
ibibiofirstlady:buhari come your village |
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by Randerl: 5:27pm On May 31, 2018 |
l don't expect anything less than what Akpabio bequeathed to him. TonyeBarcanista welldone for documenting these projects for AKSG and our other AzzLickaZ. Try and include pics. |
Shoprite Sales Girl, Arrested For Stealing Over 500 Million Naira With Her POS / Strange Man Spotted At Peter Obi's Rally (picture) / Boko-Haram Denies Killing Major-General Shuwa
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 72 |