Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,356 members, 7,819,275 topics. Date: Monday, 06 May 2024 at 01:37 PM

Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State (6732 Views)

This Is Asiwaju Tinubu's Greatest Achievement In Lagos State / 2019: Akpabio’s Defection Unsettles Governor Udom, PDP / Governor Udom Stops His Convoy To Buy From Roadside Banana Sellers (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:11pm On May 31, 2018


Uyo/Ibesikpo Asutan/Uruan/ Nsit Atai Federal Constituency)

UYO LGA
1. Construction of Dr. Ann Ward Gynecology block at St. Luke’s Hospital, Anua, Uyo.
2. Rehabilitation of administrative block and wards at St. Luke’s Hospital, Anua, Uyo.
3. 2 x 5 MVA, 33/11 KV injection substation, Edet Akpan Avenue, Uyo.
4. Completion of the State Secretariat Annex
5. Flood control at Nsikak Eduok Avenue, Uyo
6. 21 Storey modern Office Complex loading…
7. Intervention in Gully erosion. intervention; Etim Umana, St. Luke’s Hospital Gully Erosion sites in collaboration with World Bank Assisted Nigeria Erosion and Watershed Management Project (NEWMAP)
8. Face lift of the Idongesit Nkanga Secretariat Complex, with tarred roads and paved walk ways from the Civil Service Auditorium to Block 5 and adjoining car parks.
9. Ongoing construction of high-rise and investment buildings at the central business district of the Uyo metropolis.
10. Ongoing construction of 8,500 capacity International Worship Centre.
11. Dualization of 25.0km Uyo – Ikot Ekpene Road.
12. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono)
13. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I
14. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road
15. Construction of 2.1km Road around State Secretariat Annex and Believers Assembly, Mbiabong Etoi, Uyo
16. Construction of 1.5km Nsikak Eduok - Tropicana Outfall Drain
17. Construction of 1.05km Information Drive, Uyo
18. Construction of the 6.1 km Atan Offot Road in Uyo
19. Construction of 19.317km Anua – Mbak – Ishiet Road
20. Construction of 5.1km Ewet Housing Extension
21. Remodeling/Rehabilitation of Selected Roads, Strategic Junctions & Roundabouts In Uyo Metropolis, Phase I
22. Construction of 1.3km Ntiedo Udosen Street
23. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road
24. Citrus & Pineapple hybrid plantation, Uyo Village Road
25. Construction of Akparen Street
26. Construction of Ibiono Lane
27. Construction of Etoi Street
28. Construction of Udotung Ubo Lane
29. Construction of Afaha Etok Ibesikpo
30. Construction of Vision Close, Nsukara
31. Construction of Akpasak Extension
32. Construction of Kastrophy Hotel Road Off D Line, Ewet Housing
33. Construction of Graceland School Road, Shelter Afrique
34. Construction of Aka Community School Road with Spur to Aka/road by ‘C’ Division Police Station
35. Construction of Akpa Ube Close by IBB Opposite Ibom Hall
36. Construction of Akpa Ube Crescent by AKEES Office Opposite Ibom Hall
37. Proposed Completion of Nung Ette – Shelter Afrique Dual Carriage
38. Construction of Access Road to Atlantic FM and its Environs
39. Construction of All Grace School Road and Prof. Offiong Street, Shelter Afrique
40. Construction of Youth Avenue (Winners Chapel Mbiabong Road) in Uyo
41. Emergency Completion of Ediye Street by 4Lane, Ewet Housing Estate
42. Emergency Completion of Stallion Hotel Road Linking G-Line, Ewet Housing Estate, Uyo
43. Emergency Completion of Akpan Andem Street, immediately after 4Lane traffic light, Itiam/Ewet Housing, Uyo
44. Emergency Completion of Akpan Andem Street, immediately after 4-Lane traffic light, Itiam/Ewet Housing, Uyo
45. Construction of Ukim Close off D-Line, Ewet Housing Estate.
46. Construction of Akpasak Est. Access Road Inter-ministerial Projects:
47. Renovation of 7 Classroom Block at P/S Ikot Ntuen Oku
48. Renovation of Library Block at Vocation Sch. Ikot Ntuen Oku
49. Electrification at Atai Obio Offot
50. Electrification at Nung Ukim Ikono
51. Renovation of 3 Classroom Block at P/S Ikot Ntuen Oku
52. Renovation of 2Hall/ Classroom at CCSS, Four Towns
53. Construction of 3Classroom at CCSS, Four Towns
54. Renovation of a long Hall at Group Sch. Ikot Odung/ Ikot Obio Mkpong
55. Construction of Civic Centre at Atan Offot 56. Electrification at Ifa Ikot Idang

Source http://mrudomemmanuel.com/projects/projects-in-uyo-senatorial-district

You can send your feedback/criticism/appreciation/suggestion/complaints directly to Governor Udom Emmanuel via his personal email
udom.emmanuel@akwaibomstate.gov.ng
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:13pm On May 31, 2018
IBESIKPO ASUTAN LGA
1. Dualization of 9.5km Ring Road III in Aka Nung Udoe Road
2. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road
3. Construction of Afaha Atai Village Crescent
4. Construction of Afaha Ikot Obio Nkan
5. Construction of 1.0km Redeem Church Road, Afaha Etok, Ibesikpo LGA
6. Cassava Processing Factories located at Nung Udoe, Ibesikpo Asutan Inter-ministerial Projects:
7. Production of 1000No Dual Desk
8. Renovation of 4 Classroom Block at Luth. Ps Nung Udoe
9. Construction of Exams hall at Sec. Comm. Sch. Iwaia Ikot Akpaedung
10. Renovation of Classroom Block at Govt. P/S, Aba Ukpo
11. Renovation of 4Classroom at St Bridget PS, Nung Ette
12. Renovation of 3Classroom at St Bridget PS, Nung Ette
13. Renovation of 4Classroom at Govt P/S, Akpa Utong
14. Provision of Solar Powered Borehole
15. Construction of Civic Centre at Mbikpong Ikot Edim
16. Completion of OPD at PHC, Nung Udoe

Source http://mrudomemmanuel.com/projects/projects-in-uyo-senatorial-district

You can send your feedback/criticism/appreciation/suggestion/complaints directly to Governor Udom Emmanuel via his personal email
udom.emmanuel@akwaibomstate.gov.ng
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:14pm On May 31, 2018
URUAN LGA
1. Construction of 19.317km Anua – Mbak – Ishiet Road
2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur in Itu/Uruan LGAs under the Alternative Project Funding Approach (APFA)
3. Construction of 9.0km Mbiaya Uruan - Ita – Ikpa – Mbiakong Uruan road with 60m Span Bridge in Uruan Local Government through Alternative Project Funding Approach (APFA)
4.Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur
5.Renovation of Ituk Mbang General Hospital
6. Vegetable Green House
7. Akwa Prime Hatchery
8. Cattle ranch loading… Inter-ministerial Projects:
9. Construction of Assembly Hall at Methodist P/S Adadia
10. Construction of 4 Classroom Block at Methodist P/S Adadia
11. Construction of 3 Classroom Block at Ekpene Ibia
12. Renovation of 4 Classroom Block at Ekpene Ibia
13. Renovation of Assembly Hall at AME Zion School Ndon Ebom 16. Renovation of 3Classroom at AME Zion School Ndon Ebom
14. Renovation of Civic Centre at Ekim Enen
15. Renovation of 4 Classroom Block at Ikpa uruan
16. Electrification at Ikot Inyang Esuk
17. Supply of 220No CBT Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:16pm On May 31, 2018
NSIT ATAI LGA
1. Construction of 6.0km Idiaba – Nda Nsit - Ikot Abasi (Nung Udoe) Road in Nsit Atai Inter-ministerial Projects:
2. Renovation of 4 Classroom Block at P/S Essien Itiaba/ Ikot Asua
3. Renovation/ Extension of Assembly Hall at Sec. Sch. Ikot Akpan Ike
4. Construction of 3 Classroom Block at Comm. Sec. Sch. Ikot Asua
5. Renovation of 4Classroom at QIC P/S, Ikot Ekpot
6. Renovation of 3Classroom at CPS, Ikot Akpan Ike
7. Production of Dual Desk 1000
8. Water and Sanitation facility Projects at Ibakang, Odot 11,
Nda Nsit, Ikot Akpanike, Ikot Itie Udung communities in collaboration with EU
Airport Projects: (Uruan , Nsit Atai)
1. Construction of 2nd airport Runway
2. Upgrade of Airport main runway to category 2
3. Construction of Ibom International Airport 2x15 MVA Injection Substation.
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:18pm On May 31, 2018
(Itu/Ibiono Ibom Federal Constituency)


ITU LGA


1. Dualization of 25.0km Uyo – Ikot Ekpene Road.
2. Construction of 8.5km Nduetong Oku Ibiaku Uruan – Ekritam Road & Spur
3.Itu/Uruan Construction of 4.0km Mbiatok Ekritam - Mbiaya Uruan Road with Spur
4. Erosion Intervention Ekim Itam along Calabar Itu highway
5. West Itam Sports Complex
Inter-ministerial Projects:
6. Completion of Hall at West Itam Sec. Sch.
7. Renovation of 2No Classroom Block at P/S Ekitam 1
8. Electrification at Ikot Ekang
9. Supply of 220No CBT Desk
10. Renovation of 2No 6Classroom Block at West Itam Secondary School
11. Renovation of 4No 5Classroom Block/ Office at West Itam Secondary School
12. Renovation of 4No 4Classroom Block at West Itam Secondary School
13. Renovation of 3Classroom Block/Office at West Itam Secondary School
14. Completion of Fence at PHC West Itam
15. Construction of Emergency Unit at PHC West Itam
16. Renovation of Library/Workshop/Classroom Block at Comm Sec Sch, Ibiaku
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:20pm On May 31, 2018
IBIONO IBOM LGA
1. Dualization of 25.0km Uyo – Ikot Ekpene Road.
2. Construction of 3.5km Ikot Udom Road with 15m Span Bridge in Ibiono Ibom LGA
3. Take-over of Union Secondary School, Ibiaku
Inter-ministerial Projects:
4. Renovation of 4No Block at General Hospital, Use Abat
5. Renovation of 4Classroom/ Hall at HTS, Ikot Akpabio
6.Renovation of Hall/Office at HTS, Ikot Akpabio
7.Renovation of 3 Classroom at St Paul CS, Nkwa Ibiono
8.Renovation / extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Ekpe
9. Renovation/ extension of 3 to 5 Classroom Block at Presbyterian Primary Sch, Ikot Esuk
10. Production of 500No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:23pm On May 31, 2018
(Etinan/Nsit Ibom/Nsit Ubium Federal Constituency)

ETINAN

1. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridge
2. Dualization of 20.0km Uyo – Etinan Road (Ikot Oku Ikono)
3. Resuscitation of Peacock Paint Industry Reconstruction and equipping of General Hospital, Etinan
4.Pencils and Toothpick Factory Km2, Uyo-Etinan Road, Ekom Iman, Etinan.
Inter-ministerial Projects:
5. Renovation of 2No Block at Etinan Institute
6. Renovation of Block 4 at Salvation Army Sec. Sch. Efa
7. Renovation of Admin Block at General Hospital, Etinan
8. Reconstruction of Ass Hall at ACCS, Iwoetor
9. Renovation of 4Classroom at Salvation Army P/S, Ekom Iman
10. Construction of Classroom at CSS, Asuna
11. Renovation of 6Classroom Block at Salvation Army Sec. School, Efa
12. Renovation of 3Clrm Block at Salvation Army Sec. School, Efa
13. Renovation of Prin Quarters at Salvation Army Sec. School,
Efa
14. Renovation of Staff Quarters at Salvation Army Sec. School,
Efa
15. Construction of Gatehouse/Sec. at Salvation Army Sec. School, Efa
16. Renovation of Admin Block at Salvation Army Sec. School,
Efa
17. Renovation of Assembly Hall at St. Theresa Edem Ekpat
18. Renovation of 4 Classroom Block at Govt School Ikot Eboh
19. Renovation of 6 Classroom Block at Ikot Nte
20. Production of 500No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:37pm On May 31, 2018
NSIT IBOM LGA
1. Construction of Ikot Akpan Abia - Oboyo Ikot Ita - Enen Nsit Road
2. College of Education Road Network Inter-ministerial Projects:
3. Renovation of 4 Classroom Block at Comp. Sec Sch, Obotim
4. Renovation of 4 Classroom Block at Apostolic Church Sec Sch, Ikot Oku Nsit
5. Renovation of Laboratory at Apostolic. Church Sec Sch, Ikot Oku Nsit
6. Renovation of 4 Classroom Block at Nsit People Grammar Sch
7. Construction 2No 3 Classroom at Sec Sch. Edebom I
8. Completion of Civic Centre at Mbiokporo II
9. Renovation of Civic Centre at Ikot Offong Nsit
10. Renovation of Classroom Block/office at Sec Sch Mbiokporo II
11. Supply of 220No Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 3:39pm On May 31, 2018
NSIT UBIUM
1. Construction of 9.76km Ancillary Roads in Nsit Ubium LGA
2. Construction of Ukat Aran-Obio Ubium - Ikot Ubo Road under APFA
3. Rice Farm/Mill, Nung Obong-Ubium
4. Cassava Plantation, Ikot Eyo
Inter-ministerial Projects:
5. Construction of 4 Classroom Block at P/S Ikot Akpafuk
6. Renovation of 3Classroom at Ikot Imo/ Ikot Edikpe
7. Reconstruction of Assembly Hall at Govt Sch. Ikot Eyo
8. Renovation of 10No. Market Stalls at Ndukpoise
9. Provision of Solar Powered Borehole at Ikot Asang
10.Provision of Solar Powered Borehole at Obio Ekid
11.Production of 1000No. Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:21pm On May 31, 2018
PROJECTS IN EKET SENATORIAL DISTRICT


(Eket, Onna, Ibeno, Esit Eket Federal constituency)


EKET LGA

1. Construction/Remodeling of Selected Roads, Strategic Roundabouts/Junctions in Eket Metropolis (Phases 1 & II). (1.6km Dualized & 2.2km expanded Carriageway (10m)


2. Dualization of the 19.5km Eket – Ibeno Road


3. Dualization of 23.4km Eket – Etinan Road with 3Nos Bridges


4. Construction of 3.0km Osiok Iko Eket


5. Construction of 2.7km Ikot Abasi Road in Eket Local Government


6. Renovation of Secondary School Blocks/Fence at Ikot Akpan Ishiet


7. Construction of 2.7km Ikot Abasi Road in Eket Local Government


8. IKot Udota – Ikot Afaha Road (2.0km)


9. Nim Nnong Road (1.6km)


10. Ikot Ibiok – Ikot Udota Raod (0.9km)


11. Etebi Ikot Udota - Ikot Abasi


12. Ikot Udota Etebi Road (0.46km


 13. Construction of 2.08km Assam Crescent in Ede Urua, Eket Local Government


14. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)


15. Reconstruction of Eket Stadium

Inter-ministerial Projects


16. Renovation of 2 No. Hostel/Classroom block (storey Buliding) at Government Secondary School Afaha Eket


17. Renovation of 2 No. Classroom Block at QIC School Ikot Udofa


18. Renovation 4 Classroom Block at Government Primary School Mkok


19. Renovation of 5 No. Classroom Block/Toilet at AME Zion Primary School Usung Inyang


20. Construction of Civic centre & Skill acquisition centre at Idua, Eket


21. Solar Power at Idua, Eket 22. Cassava Processing Factories located at Ikot Okudom, Eket LGA
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:22pm On May 31, 2018
ONNA LGA

1. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road

2. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs

3. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin L G As

4. Construction of 10.8km Awa – Nkana Road and 2.3km Ancillary Roads in Awa Village in Onna Local Government Area

5. Construction of 5.0km Mkpok Okat Road

6. Construction of 9.5km Ikot Ebekpo – Ikot Ebidang road with 1No Jetty

7. Dualization of 29.0km Etinan – Ndon Eyo Road with 2No Cable Bridges

8. Construction of 15.1km Ndon Eyo – Ikot Akpatek – Odio Road

9. Syringe Manufacturing Factory (Largest in Africa)

10. Electric Digital Metering Solutions Manufacturing Factory

12. Flour Mills loading…

Inter-ministerial Projects

13. Renovation of 4 No. Classroom Block/Toilet at Primary School Atimkpat

14. Renovation of Classroom Block at Primary School Nung Uko Ekanem

15. Construction of fence/Gate House at QIC Primary School Awa

16. Solar powered Borehole at Ndon Eyo

17. Town Hall at Ikot Udo Essang

18. Solar powered Borehole at Ikot Udo Essang

19. Production of 220No. Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:24pm On May 31, 2018
IBENO LGA

1. Dualization of the 19.5km Eket – Ibeno Road

2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

Inter-ministerial Projects

3. Renovation 3 classroom Block at Comprehensive High School, Inue Eyet Ikot

4.Renovation of Headmaster Quarters at Primary School Okorutip

5. Renovation of Physic/Chemistry Lab at Secondary Grammar School

6.Renovation of 3 Classroom Block at Primary School Opolum

7. Renovation of Assembly Hall/office at Government Primary School, Mkpanak

8. Renovation of Hostel Block at Secondary Grammar School Ukpenkang

9. Production of 1000No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:25pm On May 31, 2018
ESIT EKET

1. Construction of 13.13km Akpambiet Edo – Edida Edo – Ebeekpe road, Ndon Edim – Idung Akpantuen road with Spurs and Rehabilitation of 1.7km Uquo Isi Edoho – Edo

road, in Esit Eket LGA

2. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

3. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges

Inter-ministerial Projects

4. Renovation 3 classroom Block at Methodist group school Etibi Esit Eket

5. Renovation 6 classroom Block at St Theresa Primary School Ntak Inyang

6. Renovation 6 classroom Block at Primary School Odoro Nkit

7. Construction of civic centre at Idung Atang Edem

8. Construction of Civic Centre at Ebighi Anwa Uquo

9. Solar Powered Borehole at Ebighi Anwa Uquo

10. Production of 220No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:27pm On May 31, 2018
(Ikot Abasi, Mkpat Enin, Eastern Obolo Fed. Constituency)

IKOT ABASI LGA


1. Cocoanut plantation/Refinery

2. Secured license for generation of 685megawatt at Ibom Power Plant

Inter-ministerial Projects

3. Renovation of 3 Classroom Blocks at Holy Child Convert School Essene

4. Renovation of 3 Classroom Block/Office at St. George Anglican Primary School, Ikot Abasi Urban

5. Renovation of 3 Classroom Block / Office at Primary School Atabrikang

6. Renovation of 10 Hospital Blocks at General Hospital Ikot Abasi

7. Renovated/Reconstructed Classroom at Saint Nicholas Primary School, Ikot Ekara

8. Production of 500No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:30pm On May 31, 2018
MKPAT ENIN LGA

1.Construction of 5.0km Ikot Usop – Ikot Edeghe – Ikot Ekpuk road with a 30m Span Bridge in Mkpat Enin

2.Construction of Temporary Access to AKSU Campus, Ikot Akpaden, Mkpat Enin

3. Construction of 13.5km Ikot Ebiere – Ikot Edor – Ikot Iko Ibon – Okom Road and Ukpana – Akpabom – Ikwe Road in Onna and Mkpat Enin LGAs

4. Construction of 12.742 km Awa Iman – Asong – Ikot Edim – Ikot Emem road with 2No Bridges in Onna and Mkpat Enin Local Government Areas

5. Cocoanut Plantation/Refinery

6. Excellence Comprehensive Sec. Sch. Ikot Uya

Inter-ministerial Projects

7. Renovation of 7 Classroom Blocks at Estang Secondary School Ekim

8. Renovation of 4 Classroom Blocks at Primary School Ikot

Eyiene Mkpat Enin

9. Renovation of Hospital Block at Cottage Hospital Ikot Ekpaw

10. Solar Powered Borehole at Ikpa Ikono Ikot Ekpaw

11. Renovation of 4 Classroom Block at Saint John Primary School, Asong

12. Unity Hall at Ikpa Ibom, Ukam

13. Solar Powered Borehole at Ikpa Ibom, Ukam

14. Power sub-stations, Ekim

15. Production of 500No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:33pm On May 31, 2018
EASTERN OBOLO LGA

1. Cocoanut Plantation/ Refinery

2. Migrant Sch., Emeruke

Inter-ministerial Projects

3. Renovation of 3 Classroom Blocks at Primary School Emeroke

4. Construction of 3 Classroom Blocks / Assembly Hall at Primary School Ikoro Inyang

5. Renovation of Classroom Block / Hall / Office at St. Silas Anglican School, Okoro

6. Production of 720No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:34pm On May 31, 2018
(Oron, Okobo, Mbo, Urue Offong/Oruko, Udung Uko Federal Constituency)

ORON LGA


1. Dualization of the 13.5km

2. Okopedi – Oron Road by East-West Road Phase II 2. Emergency Works in the Completion of Oron Urban Road (6.3km) (Additional Works)

3. Construction of Gully Erosion Control Facilities at Oron/Isangedighi Road, Oron Urban

Inter-ministerial Projects

4. Renovation 4 classroom Block at General Hospital, Iquita

5. Renovation 3 classroom Block at HCCS

6. Renovation 4 classroom Block at Primary School Oyoku Asang

7.Production of 500No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:36pm On May 31, 2018
OKOBO LGA

1. Dualization of the 14.5km Uyo/Airport Junction – Okopedi Okobo Road, Phase I

2. Emergency Rehabilitation of Okopedi Road by Community Health Centre through Oti – Oron in Okobo Local Government Area

3. Take over of Community Comprehensive Sec. Sch., Ekeya

4. Airport Projects: a. Construction of 2nd airport

Runway b. Upgrade of Airport main runway to category 2 c. Construction of Ibom International Airport 2x15 MVA Injection Substation

Inter-ministerial Projects

4. Renovation 4 classroom Block at Community Secondary school Odobo

5. Renovation of 2 No. Block at General Hospital Amanong

6. Solar Powered Water at Primary School Udung Affiang

7. Renovation of 3 Classroom Block/office at Primary School Udung Affiang

8. Renovation of 3 Classroom Block/office at Government School Ekaya

9. Reconstruction of 3 Classroom block/office at Primary School Ebighi Etta /
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by TonyeBarcanista(m): 4:37pm On May 31, 2018
Edu LGA

10. Construction of 3 Classroom block/office at St. Andrew’s Primary School OtiOro

11. Production of 220No. Dual Desk

MBO

1. Construction of Proposed 55.1km Ibaka Super Highway with 3No Spurs, Akwa Ibom State under the Alternative Project Funding Approach (APFA)

2. Construction of 19.0km Etebi – Enwang Road Project with 2No. Bridges

3. Construction of 3.2km Road at Ibaka Leading to Delmar Petroleum Harbour and Tank Farm

Inter-ministerial Projects

4. Renovation of 4 Classroom Block at St. Paul African primary school Ibaka

5. Renovation/construction of 2 No. 3 classroom Block/office at Primary School Uko Itak Eyulor

6. Electrification at Itak Eyulor

7. Renovation 5 Classroom Block/office at Community Secondary Sch.Udesi

8. Construction of Assembly Hall/2 No. Classroom Block at Primary School Oduo Ebughu

9. Renovation 4 Classroom Block at Enwang Comp. Secondary school

10. Renovation 4 Classroom Block at St. Michael Catholic School Eyonsek

11. Construction of 3 Classroom Block at Government School Eyo Uwe

12. Renovation of Assembly Hall at CSS, Edikor

13. Ibom Deep Seaport loading…

14. Production of 220No Dual Desk
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:42pm On May 31, 2018
I love this LGA by LG A listing.
Udom is unarguably the best of his generation.

2 Likes

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:46pm On May 31, 2018
TonyeBarcanista are you from AKS or do you stay In AKS?

Forget these publications and political achievements. The AKS people are hungry and crying. Their youths are jobless and a lot seem to be bleak about the state in recent Times.

I reside in Uyo and I know what I'm talking about.

4 Likes

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:47pm On May 31, 2018
In sane society this man will be made President not Governor
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:48pm On May 31, 2018
ibibiofirstlady:
I love this LGA by LG A listing.

[s]Udom is unarguably the best of his generation. [/s]


Victor Attah and Godswill Akpabio are miles ahead of him.

4 Likes

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:48pm On May 31, 2018
ibibiofirstlady:
In sane society this man will be made President not Governorcommissioner
Fixed!

3 Likes

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:49pm On May 31, 2018
kingreign:
TonyeBarcanista are you from AKS or do you stay In AKS?

Forget these publications and political achievements. The AKS people are hungry and crying. Their youths are jobless and a lot seem to be bleak about the state in recent Times.

I reside in Uyo and I know what I'm talking about.
Is it the cry caused by Buhari?

2 Likes 1 Share

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:50pm On May 31, 2018
kingreign:
Fixed!
Be objective
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:50pm On May 31, 2018
ibibiofirstlady:

Is it the cry caused by Buhari?

If you ask me, Na who I go ask? grin
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by kingreign(m): 4:51pm On May 31, 2018
ibibiofirstlady:
Be objective
I'm practical
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by buhariguy(m): 4:51pm On May 31, 2018
Is he not PDP governor?
419 governor,

Like father like son,
Like akpabio like udom,
They will only used 50% of the revenue received

All this project of classroom and hostels renovation and dual desks.
And accelerated factory that has not yet laid the foundation.
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by ibibiofirstlady(f): 4:54pm On May 31, 2018
kingreign:

Victor Attah and Godswill Akpabio are miles ahead of him.
Akpabio did well and Udom is building on his legacy.
Attah did not do anything for Akwa Ibom

3 Likes

Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by buhariguy(m): 5:15pm On May 31, 2018
ibibiofirstlady:

Is it the cry caused by Buhari?
buhari come your village
Re: Governor Udom 3 Years Of Physical Achievement In Akwa Ibom State by Randerl: 5:27pm On May 31, 2018
l don't expect anything less than what Akpabio bequeathed to him.


TonyeBarcanista welldone for documenting these projects for AKSG and our other AzzLickaZ.


Try and include pics.

(1) (2) (3) (4) (Reply)

Shoprite Sales Girl, Arrested For Stealing Over 500 Million Naira With Her POS / Strange Man Spotted At Peter Obi's Rally (picture) / Boko-Haram Denies Killing Major-General Shuwa

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 72
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.