Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. (1937 Views)

Construction Of 4bedroom,2bedroom Boys Quarters & Security Post At Oko Afo,lagos / Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)

(1) (2) (Reply) (Go Down)

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 9:24pm On Mar 20, 2022
All the lintel casted left for the cantilevered staircase sections.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 9:33pm On Mar 20, 2022
More pic

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 1:02pm On Jan 11, 2023
We are back to site prepare for the building suspended floor slab. So continue in this journey with us. Please feel free to ask questions and make contributions where necessary. Thanks

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 5:27pm On Jan 19, 2023
For now the form work has reach 90%, reinforcements 90%, plumbing work 100% and electrical works ongoing.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 5:30pm On Jan 19, 2023
More

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 6:00pm On Jan 19, 2023
Reinforcements

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 6:03pm On Jan 19, 2023
Plumbing works

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Huracan(m): 7:14pm On Jan 19, 2023
Phildecasa:
Works has been going on past few weeks. So far the far the foundation walls has been levelled, sand filling commenced immediately. We use laterite and compacted before we fill to level with sharp sand.
Also conduit plumbing services were done too.
You really did a good job as a professional builder and engineer but since it's a one storey duplex were you afraid to cast the German floor which is 100mm without putting beam because I see that as waste of rod and labour unless there is dampness in the soil of the land. Secondly, the plumbing work. I have a question. I was alittle bit confused when the pipe went down to the foundation. I thought it would have started from the dpc block..if person flush the toilet won't it go down to the foundation?

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 9:08am On Jan 20, 2023
Huracan:

You really did a good job as a professional builder and engineer but since it's a one storey duplex were you afraid to cast the German floor which is 100mm without putting beam because I see that as waste of rod and labour unless there is dampness in the soil of the land. Secondly, the plumbing work. I have a question. I was alittle bit confused when the pipe went down to the foundation. I thought it would have started from the dpc block..if person flush the toilet won't it go down to the foundation?
Thanks for your compliments sir. So answer the question, there is an opening for supply and waste pipe at the foundation wall. Sometimes you may not see it at this stage of the construction but when the plumber want to connect the waste pipes to the inspection chambers, the walls be open and the connection will be done appropriately.

1 Like

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Huracan(m): 4:58pm On Jan 20, 2023
Phildecasa:

Thanks for your compliments sir. So answer the question, there is an opening for supply and waste pipe at the foundation wall. Sometimes you may not see it at this stage of the construction but when the plumber want to connect the waste pipes to the inspection chambers, the walls be open and the connection will be done appropriately.
Oh thanks!!...don't fail to update us chief
Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 8:07pm On Jan 20, 2023
Huracan:

Oh thanks!!...don't fail to update us chief
Sure I will.

1 Like

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by topsy23: 1:41pm On Jan 22, 2023
Phildecasa:
For now the form work has reach 90%, reinforcements 90%, plumbing work 100% and electrical works ongoing.

Good to see this
Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 8:20am On Jan 26, 2023
topsy23:


Good to see this
Thanks
Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 8:22am On Jan 26, 2023
Here we have a typical opening for the pipe connections.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 1:45pm On Jan 26, 2023
Suspended slab ready for casting.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by folmus: 3:46pm On Jan 26, 2023
Welcome back!
Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 11:51am On Jan 27, 2023
folmus:
Welcome back!
Thanks.
Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 12:00pm On Jan 27, 2023
Casting started in ernest from the staircase to the beams and later to the slab.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 12:56am On Jan 31, 2023
We arrived at the end of this casting. Thanks be to God wink

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 4:46pm On Apr 12, 2023
We are back to site. Wall forming and iron works ongoing.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 5:39pm On Apr 14, 2023
Carpenter loosens the decking form work.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 5:41pm On Apr 14, 2023
More material on site

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 5:43pm On Apr 14, 2023
Walling still ongoing. We targeting lintel level soon.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 2:34pm On Apr 28, 2023
Works gone beyond lintel level.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 2:37pm On Apr 28, 2023
Block leveling and scaffolding ongoing.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 9:28am On May 06, 2023
Concluding the leveling. Next week for concrete fascia and eave.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 7:09pm On Aug 15, 2023
Forming and casting of concrete fascia (parapet) of both buildings.

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 7:12pm On Aug 15, 2023
Roofing, electrical conduit piping

Re: Construction Of A 6 Bedroom Duplex And Its Security Post At Anambra State. by Phildecasa(m): 7:14pm On Aug 15, 2023
Plastering of concrete fascia and eave.

(1) (2) (Reply)

Misconception About 10kva Inverter Package / LUXURY DRY FLAT LAND IN ELEKO IBEJU LEKKI..HOSANNA GARDENS. / Urban Crest TITLE C Of O

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 20
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.