Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,520 members, 7,816,264 topics. Date: Friday, 03 May 2024 at 08:28 AM

‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ - Politics (5) - Nairaland

Nairaland Forum / Nairaland / General / Politics / ‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ (26017 Views)

NDDC Spent N4.2bn In A Single Day - Akpabio Tells Reps / Shocking: Cbn Documents Show Nddc Spent N82b On Condolences In 5 Months / Sanitary pads, 19 others excluded from VAT hike (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Re: ‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ by Sammy07: 6:06am On Jul 17, 2020
yaki84:
Bros calm down, before u do mistake enter road with just ur pant.
lol
Re: ‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ by Sammy07: 6:08am On Jul 17, 2020
APCNig:


That is what I have been saying, Hausa/Fulanis are not our enemies, we are our own enemies. We are all thieves. Sometimes, I wonder what I will do if I get to political office. Are we angry with the office holders because they are embezzling our money or are we angry with them because we do not have opportunity to steal government money like those in office are currently doing.

You're correct.
Re: ‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ by Ayoade333: 2:59pm On Jul 17, 2020
TECHNICALITY IN BUILDING AND INSTALLATION OF COLD ROOM, NEVER GIVE A COLD ROOM PROJECT TO A QUAKE ENGINEERS

1, COLD ROOM equipment compressor unit assembling and installation-we are professional fabricated compressor rack factory over 10 years.
2, COLD ROOM equipment evaporators installation
When selecting the hanging point position, firstly consider the best position for the air circulation, and then consider the direction of the cold storage structure.
The space between the evaporator and the cold room panel should be bigger than the thickness of the evaporator.
All the hangers of the evaporator should be fastened, and the bolts and hanging bolts should be closed with a sealant to prevent air leakage.
When the evaporator is too heavy, using a 4 or 5 angle iron to make the beam. The beam should span to another roof and wall panel to reduce the weight.
3, Refrigeration equipment piping installation technology
The diameter of copper pipe should strictly match with the interface diameter of compressor suction and exhaust valve. When the condenser and compressor are separated more than 3 meters, the pipe diameter should be increased.
Keep the distance between the condenser suction air side and the wall over 400mm, and keep the distance between the outlet and the obstacle more than 3 meters.
Discharge pipe and return pipe should have a certain slope. When the condenser position is higher than the compressor, the discharge pipe should be sloped to the condenser and a liquid ring should be installed at the compressor discharge mouth to prevent the gas cooling to liquid and returning to the mouth after compressor off.
The U-bend should be installed at the exit of the evaporator air return pipe. The air return pipe should be sloped toward the compressor to ensure oil return smoothly.
The expansion valve should be installed as close as possible to the evaporator. The solenoid valve should be installed horizontally. The valve body should be vertical and we should notice the direction of the liquid.
after the completion of the welding of the entire refrigeration system, to do airtight experiments, high-pressure side of nitrogen filling 1.8MP. The low-pressure side is filled with nitrogen 1.2MP. During filling, soapy water is used for leak detection. Carefully check the welding, flange and valve. The pressure is kept for 24 hours.
4, Electrical system installation
The selection of wire must have a safety factor. The temperature of the wire surface must not exceed 4 degrees during the compressor unit operating or evaporator defrosting .
5, Whole refrigeration equipment system commissioning
Check all valves in the refrigeration system if it is in the normal open state or not, especially the exhaust stop valve. Do not close it.
Open the cooling water valve of the condenser. If it is an air-cooled condenser, turn on the fans. Check that if the amount of water and the air flow rate meet the requirements or not.
the electrical control circuit should be tested separately in advance, we should pay attention to whether the power supply voltage is normal before starting.
Whether the oil surface of the compressor crankcase is in the normal position or not, it should generally be maintained at the horizontal centerline of the oil monitor.
Why choose us?
Your Cold Room Expert....KOL-LEK1 NIG LTD
..CONTACT US 08037110658 OR WHATAP US @ 08188892835
Re: ‘NDDC Spent N82bn On Condolences, DTA, COVID-19, Others In 5 Months’ by sulaak(m): 8:30am On Jul 18, 2020
sulaak:


A Fulani man is heading NDDC. NDDC executive managements are selected and report directly to the president.

Sammy07:


na lie

Buhari appoints Akpabio, Keyamo, Fashola, 40 other ministers

https://www.premiumtimesng.com/news/headlines/342438-breaking-buhari-appoints-akpabio-keyamo-fashola-40-other-ministers.html

(1) (2) (3) (4) (5) (Reply)

I’m Not Emir Of Lagos, Sarkin Fulani Clears Air / Jinxes Broken By The Muhammadu Buhari Administration—Presidency / Rivers Crisis: Winners & Losers In Fubara-Wike Peace Deal

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.