Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,047 members, 7,825,336 topics. Date: Sunday, 12 May 2024 at 11:58 AM

Dayoolawepo's Posts

Nairaland Forum / Dayoolawepo's Profile / Dayoolawepo's Posts

(1) (of 1 pages)

Politics / Re: Group Award Kwara Governor As Worst In History by dayoolawepo: 3:00pm On Aug 19, 2018
Ministry of Energy

Inherited and Completed Projects

1. Rural Electrification works of Woru Oja | 27/07/2010 2. Rural Electrification works of Medinatu Fayda, Il/East LG | 08/06/2010 3. Rural Electrification works of Kabba Kajola, IREPODUN | 27/07/2010 4. Rural Electrification of Tunga Sukababa, KAIAMA | 08/06/2010 5. Rural Electrification Yesele, Adio, MORO | 27/07/2010 6. Rural Electrification works on the electrification of Ogbagba, Ilorin West | 27/07/2010 7. Rural Electrification works on the electrification of Oriho Ikotun, OYUN | 08/06/2010 8. Rural Electrification works on the electrification of Kampepan Koro Axis, PATIGI | 08/06/2010 9. Installation of Traffic Light with in Ilorin(Saw Mill garage junction) | 2009 10. Installation of traffic light at Maraba Junction | 06/04/2010 11. Rural electrification of Owode Kekere, Asa LG | 08/06/2010 12. Electrification Works completed at Shonga Farms Complex | 2008 13. Electrification Works completed at Shonga Farms Complex | 2008 14. Electrification Works completed at Shonga Farms Complex | 2008 15. Construction and Installation of Street light (Tanke Junction to University of Ilorin Gate) | 28/07/10 16. Installation of street light along New Yidi/ Asa-dam road | 21/3/2011 17. Construction of Street Light along Abdul Azzez Road (Geri Alimi to Emirs Palace Junction) | 29/11/10


On-going Projects

1. (Gaa-Imam) 2x15MVA, 33/11KV Injection Sub-Stations, Gaa-Imam Ilorin, Ilorn South | Dec.2008 2. Electrification of Kamanu, Alayin, Pandoro, Kafinta Offa LGA | 01/02/2010 3. Construction of control room building / provision of 33 KV Overhead line Ago, Ilorin West | 02/06/2010 4. LOT A (Budo-Efo 2x15MVA, 33/11KV0 Sub-station | 12/04/2008 5. Procurement/ Installation of Transformer at karuma comm. Ilorin West | 26/8/2013 6. Installation of Injection Sub-station transformers/other equipments at Ago& Stadium/ construction of overhead line from Olalomi T Junction to Ago, Ilorin West | 13/06/2010 7. Supply & Installation of 5nos transformers to rehabilitated General Hospital across 3 senatorial District of the State | 30/01/2014 8. Procurement/ Installation of 1No 500KVA 33/0.415KV relief transformer at FGGC Community Area, Omu-Aran. | 16/3/15 9. Procurement & Installation of transformer at Budo-Tuntun via Agbona Nla | 14/6/13 10. Instalation of Transformers Ifelodun LGA. Sangotayo & 8 other dependent locations | 14/9/09 11. Installation of 1x2.5MVA 33/11KVA at share Township, Ifelodun LGA | 09/05/2016 12. Replacement of faulty transformer at Iyana Share Community in Ifelodun LGA. | 2016 13. Procurement and installation of transformer at three locations in Omu-Aran community in Irepodun LGA. | 19/12/2016 14. Rual Electrification Works at Iwonte, Wara osin, Asa | 2010 15. Linking of 2x15 MVA injection sub-station at Budo Esho Opposite Judges Quarters ,along New GRA, Ilorin to UITH | 19/12/2016 16. Replacement of damaged transformer at ministry of health, Ilorin. 17. Electrification Egberiomo Village in Moro LGA. | 15/5/2014 18. Eletrification of Awodo layout, Share Ifelodun LGA. | 09/02/2014 19. Installation of Uninstalled of transformer in Offa LGA, Gaa-Baba Osi Oyewo, Alfa Funrae. 20. Procurement and installation of transformer at Alfa Uthman Sanu Sheu Street Off Isale Koko Area, Ilorin East LGA | 18/07/14 21. A relief transformer sub-station at Dukwa Area in Kaiama LGA. | 09/08/2016 22. Need assessment request at KWASU Road Malete. | 08/02/2013 23. Procurement and installation of transformer at Gaa, Ori- Oke, Share in Ifelodun LGA. | 15/07/2014 24. Procurement and installation of transformer at Omodada Street, Okekere, Ilorin. | 18/07/2014 25. Procurement and Installation of transformer at Gari Industrial Area/Yesi, Baruten LGA | 2014 26. Procurement & Installation of 1No 500KVA 11/0.415KV relief Transformer at NURTW Headquarters, Checking point area, Ilorin, Ilorin West LGA | 2015 27. Installation of transformer at Ogun Edun, Moro LGA | 2010 28. Procurement & Installation of 1No 500KVA 33/0.415KV relief Transformer at Kwara State College of Health Technology, Offa, Offa LGA | 2017 29. Procurement and Installation of Solar Street Light at Government House Complex | 2017 30. Light Up Kwara within Ilorin Metropolis | 2017
Politics / Re: Group Award Kwara Governor As Worst In History by dayoolawepo: 2:59pm On Aug 19, 2018
Ministry of Water

Inherited and Completed Projects

1. Ilorin Metropolis Pipe Network Extension Project | 2009 2. MDG Solar Boreholes: 37 units | 2008 3. MDG Solar Boreholes: 41 unit | 2008 4. Rehabilitation of Arandun Waterworks | 2010 5. Rehabilitation of Owode Kekere Waterworks | 2010 6. Rehabilitation of Zambufu Waterworks | 2010 7. Rehabilitation of Kanbi Waterworks | 2010 8. Rehabilitation of Pepele Waterworks | 2010 9. Motorised Boreholes: 27 units | 2011 10. Hand pump Boreholes: 5 units | 2011

Completed Projects

1. Rehabilitation of Gwanara Waterworks | July, 2012 2. Rehabilitation of Ilesha-Baruba Waterworks | July, 2012 3. Rehabilitation of Lafiagi Waterworks | July, 2012 4. Rehabilitation of Kaiama Waterworks | July, 2012 5. Rehabilitation of Megida Waterworks | July, 2012 6. Rehabilitation of Rogun Waterworks | July, 2012 7. Rehabilitation of Agbeyangi Waterworks | July, 2012 8. Rehabilitation of Pampo Waterworks | July, 2012 9. Rehabilitation of Otte-Budo Egba Waterworks | August, 2012 10. Rehabilitation of Afon Waterworks | July, 2012 11. Rehabilitation of Oyun Waterworks | July, 2012 12. Rehabilitation of Ojoku Waterworks | July, 2012 13. Rehabilitation of Obbo-Aiyegunle Waterworks | July, 2012 14. Rehabilitation of Ajasse-Ipo Waterworks | July, 2012 15. Reticulation of Pipe Around Emir Palace, Ilorin | Sept., 2012 16. Rehabilitation of Pipes, Along Pipeline Road, Ilorin | Feb., 2013 17. Reconstruction of Share/Tsaragi Water Scheme: Reticulation | July, 2012 18. Reconstruction of Share/Tsaragi Water Scheme: Construction of Reinforced Concrete Tank | July, 2012 19. Reconstruction of Share/Tsaragi Water Scheme: Power Supply to Boreholes | July, 2012 20. Reconstruction of Share/Tsaragi Water Scheme: Provision of Boreholes | July, 2012 21. Repair/Restoration of Washed-off Water Mains at Baba-Ode | Sept., 2014 22. Motorised Boreholes: 160 units 23. Hand-pump Boreholes: 281 units`

On-going Projects

1. Reconstruction of Share/Tsaragi Water Scheme: Installation of Pumps | Sept., 2012 | 60% 2. Rehabilitation of Rore Waterworks | Sept., 2012 | 75% 3. Extension of Water line from Pepele to Elesin-meta | Sept., 2015 | 10%

Ministry of Health

Inherited and Completed Projects

1. Primary Health Centre, Kulende, Ilorin East LGA 2. Oko-Erin Primary Health Centre Oke-Erin, Ilorin West 3. Primary Health Centre, Malete, Moro LGA 4. Primary Health Centre, Sinawu, Baruten LGA 5. Primary Health Centre, Arandun, Irepodun LGA 6. Odo-owa Primary Health Care, Oke-Ero LGA 7. Lamodi Primary Health Centre, Offa LGA 8. Offarese Primary Health Centre, Ifelodun LGA 9. Primary Health Centre,Wara Oja, Ilorin West LGA 10. Primary Health Centre, Marafa Oja, Ilorin East 11. Primary Health Centre, Eye-Korin, Asa LGA 12. Primary Health Centre, Osin Aremu, Ilorin West LGA 13. Primary Health Centre, Tanke, Ilorin South 14. Primary Health Centre, Apado , Ilorin East LGA 15. Primary Health Centre, Ero-Omo, Ilorin South LGA

Completed Projects

1. Rehabilitation of General Hospital, Ilorin | Feb., 2012 2. Rehabilitation of General Hospital, Share | Dec., 2013 3. Rehabilitation of General Hospital, Omu-Aran | Dec. 2012 4. Rehabilitation General Hospital, Offa | Dec., 2012 5. Consultancy Service Rehabilitation General Hospital, Ilorin | Jan., 2012 6. Consultancy Service Rehabilitation of General Hospital Share | Dec., 2012 7. Consultancy Service Rehabilitation of General Hospital Omu-Aran | Dec., 2012 8. Consultancy Service Rehabilitation of General Hospital Offa | Dec., 2012 9. Procurement of Intercom for General Hospital Offa | Feb., 2013 10. Supply of Rapid Diagnostic Test Kits for Malaria | Jan., 2013 11. Procurement and Installation of intercom at General Hospital Omu-Aran | July, 2013 12. Procurement of curtain and window Blind to General Hospital, Ilorin | August, 2013 13. Procurement of curtain and window Blind to General Hospital, Share, Omu-Aran, and Offa | Aug., 2013 14. Renovation of Doctor’s quarter, Gen. Hosp. Ilorin | May, 2014 15. Supply of 10 No. delivery beds (5 No. General Hospital) | May, 2014 16. Installation of lead lining and supply of laser printer machine at the Gen. Hosp. Ilorin | May, 2014 17. Additional furniture at the Gen. Hosp. Omu-Aran, Offa, Share and Kaiama | May, 2014 18. Additional furniture at the Gen. Hosp. Ilorin | May, 2014 19. Renovation of PHC Balogun Fulani Ward | August, 2013 20. Renovation of PHC Rifun in Patigi LGA | August, 2013 21. Renovation of PHC Oke-So Asa LGA | August, 2013 22. Construction of PHC Ajanaku, Moro LGA | August, 2013 23. Construction of Maya Ile-Apa Primary Health Centre | June, 2013 24. Renovation and Supply of Medical Equipment to Cottage Hospital, Ilesha Baruba | May, 2013 25. Supply & installation of 5KVA to 21 Blood Banks | May 2013 26. Procurement and Installation of intercom at General Hospital, Kaiama | Dec., 2012 27. Supply of Internet Access to Ministry of Health HQ | Jan., 2014 28. Supply of Medical Equipment to 5 Rehabilitated General Hospitals | Jan., 2014 29. Supply of Medical Equipment to 5 Rehabilitated General Hospitals | Dec., 2012 30. Construction of 6 medical master incinerator at 6 Health Institution (Gen. Hosp. Ilorin, Afon, Okuta, Lafiagi, Oro) and Cottage Hospital Ilesha Baruba | Aug., 2013 31. Supply of Furniture to Rehabilitated General Hospital, Ilorin | May, 2014 32. Supply of Medical Equipment to Rehabilitated General Hospitals | Feb., 2013 33. Installation of Medical Equipment to 5 Rehabilitated General Hospitals | Feb., 2013 34. Procurement of curtain and window Blind to General Hospital, Kaiama | Feb., 2013 35. Supply of Furniture to Rehabilitated General Hospital, Offa/ Omu-Aran | May, 2013 36. Supply of branded Bed sheet and Pilow cases to Gen. Hospitals | May, 2013 37. Supply of Utility Vehicle and 250 KVA Gen Set for HADC, Ilorin | Dec., 2012 38. Rehabilitation of General Hospita, Kaiama | Dec., 2012 39. Consultant Services rehabilitation of General Hospital , Kaiama | Dec., 2012 40. Purchase of electronics computers, refrigerator, consumable and other alliance accessories to General Hospital | May, 2014 41. Supply of temporary Mortuary equipment for General Hospital Ilorin | May, 2014 42. Supply of 2 No. Dialysis machine with accessories for General Hospital Ilorin 43. Supply and installation of automatic fire instigusher devices for the 5 44. newly renovated General Hospital 45. Supply of 2 No. industrial washing machines, and 1 No. Tumble drier and 3 No. mowers for General Ilorin 46. Supply of Medical equipment to the Kwara State advance Medical Diagnostic Centre 47. Kwara State Advanced Medical Diagnostic Centre (Outstanding balance) 48. Fund for the completion of Primary Health Care centre, Eggi-Oyo Ipo, Irepodun LGA. 49. Equiping of Igbaja Cottage Hospital.

On-going Projects

1. Renovation of office accommodation for the Kwara State Primary Healthcare Development Agency within Gen. Hosp. Ilorin | May, 2014 2. Construction and renovation of Gen. Hosp. Ilorin Mosque | May, 2014 3. Rehabilitation of Kwara State Hosp. Management Bureau office | May, 2014 4. Consultancy services for rehabilitation of Kwara State Hospital 5. Management Bureau office | May, 2014 6. Purchase of needed items and renovation of Civil Service Hospital
Politics / Re: Group Award Kwara Governor As Worst In History by dayoolawepo: 2:40pm On Aug 19, 2018
For those who care to know the truth about Gov. Abdulfatah Ahmed's administration, here are some facts:

Ministry of Works

Inherited and Completed Projects

1. Eyenkorin Ballah-Alapa road, Asa LGA | Nov,2006 2. Afon-Eyenkorin road, Asa LGA | July, 2007 3. Construction of Akerebiata-Zango road, Ilorin East LGA | July, 2007 4. Dualization of Ola-Olu-Offa garage, Ilorin South LGA | April, 2008 5. Rehabilitation of Alabi Owo road, Ilorin, Ilorin South LGA | Nov. 2009 6. Construction of Baba Daudu-varsity avenue road, Ilorin South | June, 2009 7. Construction of Lafiagi township road, Lafiagi, Edu LGA | March, 2010 8. Construction of Eruku-Koro road, Ekiti LGA | March, 2010 9. Ganmo-Afon road, Asa LGA | Oct, 2010 10. Rehabilitation of Zulu Gambari road, Ilorin, Ilorin East LGA | April, 2010 11. Construction of Omu-Aran township-landmark university road | March, 2010 12. Dualization of Offa garage-Micheal Imodu road, Ilorin South LGA | April, 2009 13. Rehabilitation of post office-ITC junction, Ilorin, Ilorin South LGA | April, 2010 14. Construction of Olorunshogo road, off Gaa-Akanbi, Ilorin South | March, 2010 15. Construction of Isanlu-Isin-Ijara-Isin road, Isin LGA | April, 2010 16. Offa-Irra road, Oyun LGA | April, 2010 17. Cargo Terminal Building | Aug., 2008 18. Construction Apron and Taxi way for Cargo Terminal Ilorin West LGA | March, 2013 19. Construction of master concrete drain within Agbaji area | 2010 20. Construction of Ero-Omo-Kilanko Offa garage road, Ilorin South LGA | April, 2008 21. Construction of Offa township road metropolis | April, 2008 22. Construction of Post Office fly over bridge | April, 2008 23. Construction of Chikanda-Kosubosu section II Baruten | May, 2007 24. Construction of Chikanda-Kosubosu section III Baruten | Dec., 2004 25. Construction. of Chikanda-Kosubosu (Section I), Baruten LGA | Jan., 2005 26. Construction of Chikanda-Kosubosu section II Baruten | May, 2007 27. Construction of Chikanda-Kosubosu section III Baruten | Dec., 2004 28. Construction. of Chikanda-Kosubosu (Section I), Baruten LGA | Jan., 2005

Completed Projects

1. Construction of Pakata-Sooto-Anifowose market road, Ilorin West LGA | Oct., 2011 2. Rehabilitation of Kulende-Oyun bridge road, Ilorin South LGA (2.00km) | Aug., 2011 3. Rehabilitation of CBN Quarters-Ola-Olu Ilorin Road, South LGA | Oct., 2011 4. Rehabilitation of Obaro crescent, GRA, Ilorin South | Nov., 2011 5. Rehabilitation of stadium road, Ilorin West LGA | Dec., 2011 6. Rehabilitation of Ejiba street, off stadium road, Ilorin West LGA | Dec., 2011 7. Channelization of Mubo Street Ilorin East LGA | Oct., 2011 8. Rehabilitation of Henry George R/aboutAgbo-Oba road, Ilorin West LGA | Dec., 2011 9. Construction/Rehabilitation of Fate R/ about-Agric Completed R/about, Ilorin | Feb., 2012 10. Construction of Mustapha-Aberi road, Ilorin West LGA | Nov., 2011 11. Landscaping and beautification of IAC Ilorin, Ilorin-West LGA | Dec., 2011 12. Rehabilitation of Umaru Audi road to Fate R/about Ilorin South LGA | April, 2013 13. Construction of Opomalu-Isale Maliki, Ilorin East | April, 2012 14. Construction of Alh. Suebat Abike close, GRA, Ilorin | Dec., 2013 15. Construction of Ayedun-Ilale road, Oke-Ero LGA | April, 2012 16. Construction of Tsaragi market road (asphalt overlay) Edu LGA | May, 2013 17. Construction of Obbo-Ile Isapa road, Ekiti LGA (8.60km) | April, 2013 18. Rehabilitation of Lao airport road, Asa-Dam, Ilorin West LGA (1km) | April, 2012 19. Construction of Tsaragi Batakpan road, Edu LGA (1.20km) | June, 2013 20. Rehabilitation of Obbo road-railway station-Emir’s road | Dec., 2010 21. Construction of Ogere CAC road Babanloma (eart road) Ifelodun LGA | May, 2013 22. Construction of Oniju street, Babanloma Ifelodun LGA (Completed) | May, 2013 23. Rehabilitation of Abayawo-Guniyan-Asalapa road Ilorin West LGA | Aug., 2013 24. Renovation of Kwara Fire Service Hdqters, Ilorin | Sept., 2013 25. Construction of Pakata-Sooto-Anifowose market road, Ilorin West LGA | Oct., 2011 26. Rehabilitation of Kulende-Oyun bridge road, Ilorin South LGA (2.00km) | Aug., 2011 27. Rehabilitation of CBN Quarters-Ola-Olu Ilorin Road, South LGA | Oct., 2011 28. Rehabilitation of Obaro crescent, GRA, Ilorin South | Nov., 2011 29. Rehabilitation of stadium road, Ilorin West LGA | Dec., 2011 30. Rehabilitation of Ejiba street, off stadium road, Ilorin West LGA | Dec., 2011 31. Channelization of Mubo Street Ilorin East LGA | Oct., 2011 32. Rehabilitation of Henry George R/aboutAgbo-Oba road, Ilorin West LGA | Dec., 2011 33. Construction/Rehabilitation of Fate R/ about-Agric Completed R/about, Ilorin | Feb., 2012 34. Construction of Mustapha-Aberi road, Ilorin West LGA | Nov., 2011 35. Landscaping and beautification of IAC Ilorin, Ilorin-West LGA | Dec., 2011 36. Rehabilitation of Umaru Audi road to Fate R/ about Ilorin South LGA | April, 2013 37. Construction of Opomalu-Isale Maliki, Ilorin East | April, 2012 38. Construction of Alh. Suebat Abike close, GRA, Ilorin | Dec., 2013 39. Construction of Ayedun-Ilale road, Oke-Ero LGA | April, 2012 40. Construction of Tsaragi market road (asphalt overlay) Edu LGA | May, 2013 41. Construction of Obbo-Ile Isapa road, Ekiti LGA (8.60km) | April, 2013 42. Rehabilitation of Lao airport road, Asa-Dam, Ilorin West LGA (1km) | April, 2012 43. Construction of Tsaragi Batakpan road, Edu LGA (1.20km) | June, 2013 44. Construction of Ogere CAC road Babanloma (eart road) Ifelodun LGA | May, 2013 45. Construction of Oniju street, Babanloma Ifelodun LGA (Completed) | May, 2013 46. Rehabilitation of Abayawo-Guniyan-Asalapa road Ilorin West LGA | Aug., 2013 47. Renovation of Kwara Fire Service Hdqters, Ilorin | Sept., 2013 48. Construction of hanger workshop and conversion of office/maintenance | Oct., 2013 49. Construction of Igbesi street Tanke Ilorin, Ilorin South | Aug., 2014 50. Rehabilitation of Oloro palace road, Oro road, Irepodun LGA | May, 2013 51. Rehabilitation of Aduralere-Isalekoko-Ojagboro-Sanu Sheu road, Ilorin | Oct., 2013 52. Construction of Oko Bridge-Oro Ago Ifelodun LGA | April, 2012 53. Henry George-Mini Campus-Queen’s school.1.7km Asphalt overlay | June, 2013 54. Rehabilitation of Oke-Andi-Obafemi Taoheed road, Ilorin South | Oct., 2012 55. Renovation of 4No selected R/about in Ilorin metropolis Ilorin East LGA (Phase II) | Nov., 2012 56. Construction of flower garden box culvert, Saadu Alanamu road, GRA | Jan., 2012 57. Construction of Kokorokan Isale Aluko road Ilorin West LGA | May, 2013 58. Renovation of the existing directional signboard/Construction of new boards within some routes in Ilorin metropolis Ilorin East/ South/West LGA | Nov., 2013 59. Construction of Muslim Pilgrim welfare board road (Gerewu road) Ilorin Phase I | Sept., 2015 60. Construction of selected access roads within old GRA, Ilorin East LGA | May, 2013 61. Construction of hanger workshop and conversion of office/maintenance | Oct., 2013 62. Construction of Igbesi street Tanke Ilorin, Ilorin South | Aug., 2014 63. Rehabilitation of Oloro palace road, Oro road, Irepodun LGA | May, 2013 64. Rehabilitation of Aduralere-Isalekoko-Ojagboro-Sanu Sheu road, Ilorin | Oct., 2013 65. Construction of Oko Bridge-Oro Ago Ifelodun LGA | April, 2012 66. Henry George-Mini Campus-Queen’s school.1.7km Asphalt overlay | June, 2013 67. Rehabilitation of Oke-Andi-Obafemi Taoheed road, Ilorin South | Oct., 2012 68. Renovation of 4No selected R/about in Ilorin metropolis Ilorin East LGA (Phase II) | Nov., 2012 69. Construction of flower garden box culvert, Saadu Alanamu road, GRA | Jan., 2012 70. Construction of Kokorokan Isale Aluko road Ilorin West LGA | May, 2013 71. Renovation of the existing directional signboard/Construction of new boards within some routes in Ilorin metropolis Ilorin East/ South/West LGA | Nov., 2013 72. Construction of Muslim Pilgrim welfare board road (Gerewu road) Ilorin Phase I | Sept., 2015 73. Construction of selected access roads within old GRA, Ilorin East LGA | May, 2013

On-going Projects

1. Rehabilitation of Kaiama general hospital road Kaiama LGA | Dec., 2012 | 95% 2. Channelization along Akerebiata Zango road Ilorin, Ilorin East | Sept., 2012 | 70% 3. Construction of Share-Oke-Ode road (section I) | Dec., 2012 | 49% 4. Rehabilitation of Share-Oke-Ode road (section II) Ifelodun LGA | Dec., 2012 | 35% 5. Re-Construction of demolished NAMA building Ilorin West | Nov., 2011 | 72% 6. Re-construction of pipeline bridge Ilorin East LGA | April, 2013 | 99% 7. Construction of Isale Kannike-Idiopopo road Ilorin East LGA | Aug., 2013 | 52% 8. Rehabilitation Anilelerin Agun-Ita-Erin road Offa LGA | Aug., 2013 | 49% 9. Asphalt overlay on Oro-Ago-CBN Saro road junction Ilorin West | May, 2013 | 50% 10. Agba Dam catchment area NNPC road Ilorin South LGA | June, 2013 | 42% 11. Rehabilitation of Gaa-Akanbi-Agbabiaka road, Ilorin South LGA | Sept., 2013 | 38% 12. Painting and marking of some selected roads within Ilorin metropolis | Nov., 2013 | 95% 13. Asphalt overlay of Saratu Mamman street, Fate, Ilorin | Aug., 2013 | 50% 14. Construction of Kaiama-Teshe road (Lot I) | Nov., 2014 | 65% 15. Construction of old garage central mosque mission road, Lafiagi | Oct., 2014 | 26% 16. Construction of Arobadi Maigida road | Oct., 2014 | 45% 17. Construction of Ilesha Baruba-Gwanara road, Baruten LGA | Oct., 2013 | 35% 18. Construction of Arandun-Rore-Aran-Orin-Ipetu road, Irepodun LGA | April, 2013 | 80% 19. Rehabilitation of Abdulsalam Alao street, Gaa-Akanbi, Ilorin South LGA | Nov., 2012 | 80% 20. Rehabilitation of Alawonla-Dada road, Ilorin West LGA | June, 2013 | 55% 21. Rehabilitation of Offa-Ipee road, Oyun LGA | Nov., 2013 | 43% 22. Construction of Ilala bridge, Irepodun LGA | Sept., 2013 | 47% 23. Channelization of network in ItaAlamu road, Ilorin South LGA | Dec., 2013 | 20% 24. Construction of Amule Bridge | Jan., 2015 | 19%
25. Conversion of mechanical workshop to fire service station at Omu-Aran | Sept., 2013 | 33% 26. Rehabilitation of road network at Baboko market through | Jan., 2015 | 50% 27. Rehabilitation of Sobi cantonment road network | Jan., 2015 | 50% 28. Construction of Egbejila-Asa Dam- Airport Road | Oct., 2014 | 32% 29. Construction of culvert and concrete drain in Abiri Aremu area and maintenance of Awolowo Bubu-Oke-Odo road Ilorin South LGA | Nov., 2011 | 65% 30. Construction of Geri-Alimi split Diamond Interchange (Phase 1), llorin, Ilorin-west LGA | Feb., 2017 31. Dualization of Kulende-UITH-Oke-Ose , Ilorin, Ilorin-east LGA | Feb., 2017 | 21% 32. Construction of multiple cells culvert across Orisa River along Oko-Oro-Ago, 33. Ifelodun LGA | April, 2012 | 99% 34. Construction of Kaiama – Tesse road Lot I | Nov., 2014 | 65% 35. Extension of Lubcon Wara express road, Ilorin West LGA | Nov., 2011 | 65%
Politics / Re: Kwarans Reacted To Photo Of Gov. Ahmed Performing Lesser Hajj by dayoolawepo: 10:03am On Jun 21, 2017
I don't see anything wrong in our leaders and people in authority to embark on spiritual journeys like this. It is a moment to seek the face of Allah and also pray ask Allah to guide them. I think we should also join them in our own capacity to pray that Allah grants them wisdom to further govern our dear state. Mashallah!
Politics / Re: Mass Transit Scheme Is Doomed To Fail In Kwara by dayoolawepo: 9:03am On Jun 02, 2017
I want to assume you have not been to Ilorin lately and you have not seen the present population of people in Kwara State. The Governor should be commended for the laudable initiative he has put in place to tackle transportation crisis in the city and the state. I want to believe you have not been to Unilorin Bus Terminus at Tanke when students are on a long queue to board a bus, also you should check out how students and staff of the university cluster on the roadside when headed to the university. With the provision of these buses, which Unilorin-Tanke is one of its routes, i believe it is good news for students, staff and visitors to the University.
You should also note that the Transit Scheme is in partnership with NURTW, so there will be balance in the running of the scheme and would not affect others in the transportation business.
The population of Ilorin has increased drastically over the past few years, and it is only wise to provide means to create a solution for transportion problems at the moment and in the future.
Politics / Re: SAVE KWARA! Kwarans Are Suffering! by dayoolawepo: 8:57am On May 15, 2017
I will like to say putting up this kind of write up is mischievous. First of all the pictures the write has used are not in any way liked to Kwaran and i believe the writer has just downloaded pictures online to support his/her claim. It is also worthy of note that Kwara, unlike many states is one of the states that is not owing its workers salaries or pension, so i think we should commend the state government that has been able to pull this off in this era of recession.

1 Like

Politics / Re: 1,005 Kwara Pensioners Die Over Unpaid Salaries by dayoolawepo: 10:38am On Aug 08, 2016
Not true..... I think our journalist should do proper investigations before making information public. How can they justify the figure quoted here? Are there medical reports to justify deaths of pensioners in the state? We should be more realistic and stop practicing lazy journalism just for cheap publicity and popularity.
Travel / Re: 10 Interesting Facts About Kwara State by dayoolawepo: 4:39pm On Jul 14, 2016
Nice write up. As regards the road, i am aware the state government is working on rehabilitating and constructing new roads in both rural and urban areas of the state. Presently roads in offa are being rehabilitated, and I strongly believe other roads you have mentioned will be treated as well. Well done!

4 Likes

Politics / Re: Kwara Generates N3.2b In Three Months by dayoolawepo: 4:57pm On Apr 19, 2016
That's why you should share your ideas with the state government on how you think IGR can be improved. Take actions and not just make comments on social media that won't bring any improvement. Thanks
mrvitalis:
I still can't believe I will govern a local government and we won't generate 2 billion a month. .. . Not to talk of a state like Kwara

We have fools as leaders I swear down
Politics / Re: Kwara Generates N3.2b In Three Months by dayoolawepo: 4:53pm On Apr 19, 2016
This is a great improvement compared to the meager revenue that used to be generated. This is a sign that some leakages have been blocked and i do hope KW-IRS keeps up the good work.
Agriculture / Kwara State Government Targets 20,000 Youth Jobs Annually by dayoolawepo: 4:02pm On Apr 19, 2016
As part of its impactive economic growth policy, the Kwara State Government is to generate 20,000 agro-related jobs annually aimed at eradicating poverty and creating wealth, especially among youths.

The Kwara State Governor, Dr Abdulfatah Ahmed said this when participants of course 38 of National Institute for Policy and Strategic Studies (NIPSS) Kuru, Plateau State on local study tour of Kwara State paid a courtesy call on him at the Government House, Ilorin.

Dr Ahmed stated that the state government has identified agriculture as one of the keys of economic prosperity as it could improve the lives of the people tangibly.

According to the governor, about 50,000 Small Medium Enterprises have been empowered, adding that another N2billion would be injected into the scheme in the next three years with priority on youths and women beneficiaries.

“Our determination is to generate a successor-generation of commercial farmers driven by an entrepreneurial mindset for job and wealth creation”, the governor explained.

Dr Ahmed expressed concern that challenge of poverty has remained a dominant issue in Nigeria as the 2015 Human Development Index ranked Nigeria “152 out of 188 countries in 2014.

The leader of the NIPSS team, Brigadier General Daniel Chinoko said the team which is Group 6 of the course are in the state to under study the state government's poverty reduction programmes and policies.

Brigadier General Chinoko who said the theme of course 38 is “strengthening institutional mechanism for poverty reduction and inclusive governance”, promised that the team’s report would be unbiased.
Health / Re: The Bad Shape Of Oro General Hospital, Kwara State (Exclusive Photos) by dayoolawepo: 4:11pm On Jan 18, 2016
It is pertinent to know that the administration of Governor AbdulFatah Ahmed has immense concern for the populace, hence part of the reasons for the proposed N20b Bond to execute infrastructural projects in the state. The State Government has also announced its intention to renovate the Oro General Hospital in question alongside a few other cottage hospitals in the state.

(1) (of 1 pages)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 78
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.