Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:46am On Aug 12, 2020 |
Dennis3D: Definitely. Let me show you the ones I did. The first one is on 550Sqm. 3 Terraces.
I have equally done 8 units on 1200Sqm. See pictures below for evidence.
So if you need such magnificent designs. Contact us via our signature or visit our thread to see more of our works there. So when it comes to design and land management. We have you covered 100%. That's a fact. We can always WOWW you with designs even on the smallest piece of land. Just visit our thread to see things yourself.
We can avail you with Architectural - Structural - Mechanical - Electrical - Plumbing Plans and Designs of any Design we do for you. My TEAM and I are extremely detailed and would be willing to give you value upon your request.
Thank you. We Design and Build |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 8:45pm On Aug 10, 2020 |
diordaves: Cornice is included in the price if your preferred design incorporates cornicing. N4000/sqm is all in all to deliver your choice design. Nothing more, nothing less. POP is cheaper by about 35%. I've done the numbers. Thumb � |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 8:43pm On Aug 10, 2020 |
mufutau55: My brothers and sisters. I have been following the cost comparison between the regular POP and the Plasterboard for ceiling works. Theory is good but practical is a different thing entirely. Please do your due deligence and do not contract anyone until you have done your verifications. We do not need anyone coming back here with story that touches. We have many artisan that does the regular POP here reputably but few people with plasterboard work. I personally beleive if the plasterboard ceilings is cheaper, I am sure most of us would have been using it more. Please make sure you are not following packagings. So, do your due deligence about the cost before you engage in it. Just a warning from experience. I am not recommending between regular POP and Plasterboard ceiling neither am I recommending any artisan or contractor; just do your personal due deligence before you part with your hard earned money. Please beware of packagings, as we call it here. If you experiment with Plasterboard, please come back here and tell us the pros and the cons. Thanks.
Hajji M. Thanks sir. Well said because people tend to use cheap quotes to lure people into what they know it's not attainable in some cases. Your summary is valid. |
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 4:41pm On Aug 10, 2020 |
Happy New Week. |
Properties › Re: NEW Construction - 3 Bedroom Bungalow - Executive Design by Dennis3D(op): 4:40pm On Aug 10, 2020 |
Happy New Week |
Properties › Re: Build A 4 Bedroom Bungalow From Foundation To Roofing With 4.5 Million Naira by Dennis3D(op): 4:40pm On Aug 10, 2020 |
Our work... |
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 4:39pm On Aug 10, 2020 |
More site updates coming your way. Door installations. Kitchen. Entrance doors and gym house doors.
|
Properties › Re: All Interior Redesign - Reconstruction Works of Dennis3D by Dennis3D(op): 9:24am On Aug 10, 2020 |
Happy New Week people.... |
Properties › Re: All Interior Redesign - Reconstruction Works of Dennis3D by Dennis3D(op): 9:21am On Aug 10, 2020 |
Happy New Week people |
Properties › Re: 6 Bedroom Duplex Design For A Plot + 2 Unit 2 Bedroom Flat - Plot 60/120fit by Dennis3D(op): 9:20am On Aug 10, 2020 |
We Design and Build Homes not Houses |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 9:20am On Aug 10, 2020 |
Happy New Week good people |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 12:28pm On Aug 09, 2020 |
Wishing you all a new week |
Properties › Re: 6 Bedroom Duplex Design For A Plot + 2 Unit 2 Bedroom Flat - Plot 60/120fit by Dennis3D(op): 9:16am On Aug 09, 2020 |
Our work |
Properties › Re: 3 Bedroom Bungalow Design - Photos by Dennis3D(op): 9:16am On Aug 09, 2020 |
We Design and Build |
Properties › Re: Semi Detached 4 Bedroom Duplex Design & Concepts by Dennis3D(op): 9:16am On Aug 09, 2020 |
We lead others follow |
Properties › Re: See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 5:21am On Aug 09, 2020 |
Update from our Oke Aro Project
|
Properties › Re: 4 Unit 2 Bedroom Block Of Flats Design - One Plot by Dennis3D(op): 7:13pm On Aug 07, 2020 |
We Design and Build |
Properties › Re: See Most of our Design And Construction Works Of 2018 - Date by Dennis3D(op): 7:13pm On Aug 07, 2020 |
Our works speaks for itself |
Properties › Re: Build & Sale 4 Bedroom Duplex - Lekki Investment Style by Dennis3D(op): 7:13pm On Aug 07, 2020 |
We have so much options and designs for you |
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 6:50pm On Aug 07, 2020 |
We will soon be starting this construction on or before October of this year. Stay tuned |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:50pm On Aug 07, 2020 |
Make us your favorite and watch us deliver precision design and construction for you. |
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 5:43pm On Aug 07, 2020 |
More site pictures as at today. Site Update. We are doing the overhead water tank stand. Tiling. POP and screeding.
Pls follow up if you haven't been following up
|
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 3:47am On Aug 07, 2020 |
More views to come today |
Properties › Re: Build A 4 Bedroom Bungalow From Foundation To Roofing With 4.5 Million Naira by Dennis3D(op): 3:46am On Aug 07, 2020 |
Our work |
Properties › Re: 4 Bedroom Duplex Construction: Live Photos - Less than half plot - Agege Lagos by Dennis3D(op): 3:46am On Aug 07, 2020 |
Our work |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 3:41am On Aug 07, 2020 |
MrOkenwa: This review made me to contact him this evening and I was impressed by his prompt response to my enquiries. I've placed an order for 25 windows of various sizes. I hope to share 5 star testimony, just like you, in days to come. .. Good one. |
Properties › Re: All Interior Redesign - Reconstruction Works of Dennis3D by Dennis3D(op): 3:38am On Aug 07, 2020 |
We lead others follow... |
Properties › Re: NEW Construction - 3 Bedroom Bungalow - Executive Design by Dennis3D(op): 3:38am On Aug 07, 2020 |
What we do |
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 3:38am On Aug 07, 2020 |
Our work |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:37am On Aug 07, 2020 |
SurveyorGeo: Thank you for this
Thank you for this Thank you for following up with us. Well appreciated. Stay tuned for when we resume. |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 11:09am On Aug 06, 2020 |
Thank you all for following up with us and staying with us still. |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:41am On Aug 06, 2020 |
Below is the Breakdown of the Calabar Project.
1. Foundation Cost of the Main building without Block was = 2.3m Material and Labour. Total of 1200 Blocks was estimated for Foundation which ought to have costed = 180,000 with their local price there.
2. Ground Floor to Lintel and Leveling for Decking was = 1.8m. Total of 2,500 Blocks was estimated. Cost would have been = 375,000
3. Decking was estimated to cost 2.9m all included materials and labour for each stage.
4. Security House self contain and Gen House. Built to standard with reinforcements and concrete floors estimated was for 600K to Leveling and set for roofing. Materials and Labour.
Miscellaneous Expenses and Logistics and other project related services = 200,000.00
Total = 7,800,000.00 |