Good day all. We are resuming this site soonest. Pls stay tuned with us. |
Rawgold300:Good day sir, Bamboo Ranges between 700 - 850 Depending on the location one finds it and its proximity to your site. Some charge with transport while others charge for the bamboo alone. To Your second question, certain factors like your building size, height and position on site can all affect the quantity of bamboo you would need for plastering. However, if am to place a range, I would say between 400 - 500 For about 2 Legs. Again, The size of your building can either increase this or reduce it. I hope this helps. |
We are preparing to do The First for Slab concrete works tomorrow. So stay tuned with us as we journey this part. Taking delivery of more Decking concrete work items as electricians are doing their final finishing. Picture 1 - Inverter Provision Picture 2 - 3 Phase Power Inlet from NEPA to the main Building source.
|
More updates from site today in preparation for concrete works...
|
mufutau55:Oh thanks sir. It's about 1.2m wide |
Electrical work Update on Decking.
|
folmus:Thanks very much. Pls keep following |
Keep following up with us. Electrical and plumbing works ongoing too simultaneously.
|
More picture updates from the decking works today.
|
gabbytabby:The decking is massive as you can see. Length of building is about 25m and width is about 18m |
We have also constructed temporary steps for the concrete day works. For ease of movement. This Decking took about 600 pieces of Bamboo. You wouldn't believe it. The decking area is about 300sqm.... Last two pictures are the main building staircase.
|
We have started receiving Bags of cement for the decking as well as granite and sharp sand in preparation for the decking day. This Decking is gonna take more than 200 Bags of cement and a bag is 5250 is what we are buying here. Now do the maths and know what we are spending here
|
The decking has really taking alot of reinforcement. 12mm reinforcement here is about 4 tons and 16mm is about 3.5tons 10mm is about 1.3Ton. Making surer quality is assured...
|
It's a team work we are doing all making sure our work count.
|
folmus:Thanks very much |
More Views from this project. Back Duplex Sitting Room.
|
More reinforcement works On Decking.
|
We have started the flooring reinforcements
|
Staircase landing beam areas.
|
More site updates Decking Works. Keep following up with us
|
More Views from the decking
|
More Decking formation updates. We are set to commence the flooring reinforcement tomorrow as soon as we lay our membrane. Photo view showing the front of the building entrance and the cantilevers
|
mufutau55:Thanks sir. We appreciate your followup |
We are making progress |
More Decking work update today. We have worked non stop from day one we started work here till now.
|
Adedward:Thank you. |
We are making progress. Decking floor about - 85% Completed. Would be finally completed 100% by tomorrow. Then staircase and the temporary step for concrete works will be done ASAP. Meanwhile, our welders have started preparing the decking beams accordingly. Our style of execution and precision.
|
Keep following up with us. We are working back to back. Sitting room and Dinning area Decking formation ongoing now.
|
More pictures of the decking formation.
|
Our work progress today is impressive.
|
Some of the main Duplex Kitchen Views. See how lovely if finally came out... Everything is lovely. The kitchen has so many accessories. Microwave Oven Sensored Heat extractor Dustin Elevator Kitchen top Cooker top Double fridge session Pantry Water heater Plate racks etc
|
We are making progress. Keep following up with us.
|