PropertiesRe: 6 Bedroom Contemporary Smart Duplex - Isheri North by Dennis3D(op): 9:22pm On Sep 29, 2023
Good day all.

We are resuming this site soonest.

Pls stay tuned with us.
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 9:20pm On Sep 29, 2023
Rawgold300:
Good evening oga Dennis , how much is a piece of bamboo going rate now please?

And how many do you think one would need for plastering pls. The plastering is for 5bed duplex as well
Good day sir,

Bamboo Ranges between 700 - 850 Depending on the location one finds it and its proximity to your site. Some charge with transport while others charge for the bamboo alone.

To Your second question, certain factors like your building size, height and position on site can all affect the quantity of bamboo you would need for plastering.

However, if am to place a range, I would say between 400 - 500 For about 2 Legs. Again, The size of your building can either increase this or reduce it.

I hope this helps.
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 5:43pm On Sep 28, 2023
We are preparing to do The First for Slab concrete works tomorrow.

So stay tuned with us as we journey this part. Taking delivery of more Decking concrete work items as electricians are doing their final finishing.

Picture 1 - Inverter Provision
Picture 2 - 3 Phase Power Inlet from NEPA to the main Building source.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:19pm On Sep 28, 2023
More updates from site today in preparation for concrete works...

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:19pm On Sep 28, 2023
mufutau55:
Very nice wide staircase… that I like. Nice work Sir.

Hajji M.
Oh thanks sir.
It's about 1.2m wide
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 11:42am On Sep 27, 2023
Electrical work Update on Decking.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 11:42am On Sep 27, 2023
folmus:
Welldone!
Thanks very much.
Pls keep following
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:29am On Sep 27, 2023
Keep following up with us.
Electrical and plumbing works ongoing too simultaneously.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 7:08pm On Sep 26, 2023
More picture updates from the decking works today.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 7:07pm On Sep 26, 2023
gabbytabby:
About 8 tons of irin the person get broad chest.
The decking is massive as you can see.
Length of building is about 25m and width is about 18m
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:18pm On Sep 26, 2023
We have also constructed temporary steps for the concrete day works. For ease of movement.

This Decking took about 600 pieces of Bamboo. You wouldn't believe it. The decking area is about 300sqm....

Last two pictures are the main building staircase.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:15pm On Sep 26, 2023
We have started receiving Bags of cement for the decking as well as granite and sharp sand in preparation for the decking day. This Decking is gonna take more than 200 Bags of cement and a bag is 5250 is what we are buying here. Now do the maths and know what we are spending here

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:12pm On Sep 26, 2023
The decking has really taking alot of reinforcement. 12mm reinforcement here is about 4 tons and 16mm is about 3.5tons 10mm is about 1.3Ton.

Making surer quality is assured...

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:09pm On Sep 26, 2023
It's a team work we are doing all making sure our work count.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:08pm On Sep 26, 2023
folmus:
Wonderful!
Thanks very much
PropertiesRe: 8 Bedroom Duplex Construction - Lakowe Golf � by Dennis3D(op): 9:02pm On Sep 24, 2023
More Views from this project.

Back Duplex Sitting Room.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 8:01pm On Sep 24, 2023
More reinforcement works On Decking.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 7:56pm On Sep 24, 2023
We have started the flooring reinforcements

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 11:24am On Sep 24, 2023
Staircase landing beam areas.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 11:21am On Sep 24, 2023
More site updates
Decking Works.
Keep following up with us

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 4:56am On Sep 23, 2023
More Views from the decking

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 4:55am On Sep 23, 2023
More Decking formation updates.
We are set to commence the flooring reinforcement tomorrow as soon as we lay our membrane.

Photo view showing the front of the building entrance and the cantilevers

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 4:54am On Sep 23, 2023
mufutau55:
Very good progress. Kerp up the good work Sir.

Hajji M.
Thanks sir.
We appreciate your followup
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 7:17pm On Sep 18, 2023
We are making progress
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 5:59pm On Sep 17, 2023
More Decking work update today.
We have worked non stop from day one we started work here till now.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 5:57pm On Sep 17, 2023
Adedward:
well done,
Thank you.
PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:39pm On Sep 16, 2023
We are making progress.
Decking floor about - 85% Completed.
Would be finally completed 100% by tomorrow. Then staircase and the temporary step for concrete works will be done ASAP.

Meanwhile, our welders have started preparing the decking beams accordingly.

Our style of execution and precision.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 12:03pm On Sep 16, 2023
Keep following up with us.
We are working back to back.

Sitting room and Dinning area Decking formation ongoing now.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 6:05am On Sep 16, 2023
More pictures of the decking formation.

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 1:11pm On Sep 15, 2023
Our work progress today is impressive.

PropertiesRe: 8 Bedroom Duplex Construction - Lakowe Golf � by Dennis3D(op): 3:34am On Sep 15, 2023
Some of the main Duplex Kitchen Views.
See how lovely if finally came out...

Everything is lovely. The kitchen has so many accessories.

Microwave
Oven
Sensored Heat extractor
Dustin
Elevator Kitchen top
Cooker top
Double fridge session
Pantry
Water heater
Plate racks etc

PropertiesRe: 5 Bedroom Duplex - Ibadan Project by Dennis3D(op): 3:31am On Sep 15, 2023
We are making progress.
Keep following up with us.