And today, Decking works has began. Carpentry works is gonna go on for about 3 - 5 Days of which the welders are on stand by to start up their own work with Decking beam reinforcements once the decking floor is prepared by the Carpenters.
|
We have procured planks and wood for the decking works as well. Planks here are sold 2,300 and we got about 480 pcs of it in total including for staircase and beams as well as Decking floor. We also bought 2x3x12 Woods for props preparation
|
TopazandDiamond:Pls I don't get your question right. Kindly clarify. |
Good evening people. See how far we have come on this project. We are doing the compound flooring. Stamped concrete. Grey and Black color.
|
Arrival of bamboo for Decking purposes. We are at Day 25 Now since we started works on this site. Because of the height of the building. We have about 450 bamboo here. Long ones at that. One good thing I would say I got here better than Lagos.
|
Final blocks leveling before Decking. We have a height of 3.15m before Decking beam.
|
More pictures from the building leveling and Lintel concrete works. We normally do concrete works on Colum a day ahead before we do Lintel. This is to ensure good workability of the concrete on the columns we are doing at a time.
|
We are done with Lintel works and now leveling the building on preparation for Decking works. Pictures speaks below.
|
kopell:Absolutely correct sir. From day one of this project. We bought reinforcement for the project from foundation to Decking. We would have done same for cement if not for the estate rule that states that big trailer of 30 Tons and above can't come in to the estate. Buying matetisis down helps wage against inflation and it's importance can't be overemphasized especially as Nigerian market is fluctuating up and up. Not even up and down. With respect to quality. We don't joke with that. It's the bedrock to our project success while at the speed to which we carry out our task. We pay attention to the core areas of the projects which are the concrete works. Also for projects such as this, we estimated blocks for 420 per one. Upon getting to the location we discovered that their normal blocks were sold for 450 naira per one. Which is even above our budget. But guess what, they had another blocks. Made of stone Dust, and it's sold for 500 naira per one. In a bit to ensure quality, that's what my team and I went for at no additional cost to the client because we want to achieve quality. However, we have contigency plan provided that we are working with in this regard. Alot more I would be staring as the project proceeds. |
Timtol:Thanks brother |
Concrete works on Lintel and columns. Our routine is usually Colum first and that's what we are doing below... Good properly mixed concrete mixture of sand, granite, cement and Water
|
Plumbing materials arriving at site now... We and the installation ongoing simultaneously
|
Keep following up with us always here |
Here is about today.
|
ArcToyin:16mm it's selling between 8800 - 9,500 between local and TMT 12mm between - 4700 - 5100 in similar fashion 10mm between 3,500 - 3,900 respectively. Bamboo is around 750 - 850 depending on the location and proximity to your site. |
Colin's and beams form work.
|
More site Update. Prparijg for Lintel formwork and reinforcements.
|
ArcToyin:Good morning Thanks for your comment Kindly let me know the particular materials you need their prices so I can write them for you. |
More site updates coming today |
The blocks works are at Lintel in some areas now. We are doing the volume form work simultaneously
|
We are making progress
|
Block works rising
|
We are using stone Dust vibrated blocks. The best in the area though more expensive than the regular blocks.
|
We have commenced block setting. Ground floor lay out done. And work commences
|
More Views from the concrete Slab work for foundation... We used a total of 130 Bags of Cement for this Slab concrete work.
|
More picture update
|
We finally did the concrete work on the foundation today too... We are at Day - 15
|
More compacting pictures
|
Update on the compacting and membrane application
|
We are done with foundation back filling and filling... And have equally compacted. See follow up pictures.
|
Happy New Month
|
Happy New Month
|