Lesson 1: AUTOCAD2021: CREATING WINDOWS AND DOORS OPENING IN AUTOCAD.
In this video I explain how to create openings for the windows and doors in the 2d floor plan in autocad before placing the windows and doors elements to make the placement easy and also techniques for speeding up the operation were displayed.
Lecture 2 Lesson 2: AUTOCAD2021: HOW TO CREATE LAYERS IN AUTOCAD.
This video explains how to setup layers for your drafting in AutoCAD, the right setup for your work. A good drafting culture in AutoCAD is to use layer right, to provide detail information for people that want to access your AutoCAD file, like structural engineer, MEP etc.
Lecture 2 Lesson 1: AUTOCAD2021: HOW TO CREATE WALLS IN AUTOCAD.
This video explains how to create walls following the already sketch design in jpg format that was import into AutoCAD. In this video, the right and standard of producing wall in AutoCAD is explained.
New lessons will be put tomorrow on how to create walls of our the plan we sketched in the last lesson, follow this link to join our interactive WhatsApp group.
Learn how to design 2d floor plans on AutoCAD, this course is brought to you free of charge from the stable of CadMe. This course will be taught in details and will also be practical oriented, as we'll be designing a 4 bedroom Duplex.
Who should take this course: If your in a building construction industry, this course is for you.
You will learn: 1. Creation of floor plans 2. Adding furniture and sanitary appliances to your plans 3. Annotation of your drawing (Adding text and dimensions) 4. Roof plans design 5. Drawing roof elevations 6. Drawing building elevations. 7. Drawing building sections. 8. Setting up the plotting/printing parameters. 9. Plotting/printing the work drawings.
Vidoe lessons will be uploaded every 2 days starting from Monday 31st August, 2020
Do well to subscribe to[b]CadMe[/b] on YouTube and turn on your notification.
privaldo: Exactly, I keep asking myself what was going on in Pep's mind when he made his selections.
Now KDB is playing a free role, Jesus is MIA only sterling and Cancello they attack with KDB supplying, the way dem rush sterling, imagine if there's someone that can explore that loop hole like Mahrez or Bernardo.
I just pray City won't let me chop another bantering.
ayamsuperstar: Guardiola got his tactics wrong... Why play KDB at the wings...when u av wingers on the bench .this wil spell doom for City in dis match
Fernadinho is not meant to start this match The front 3 should be Mahrez Jesus Sterling Midfield: Phoden Rodri De Bruyne The back is reasonable enough. When I see some selection, I wonder if it's actually Pep that made it.
OvisFranko: A university engineering graduate is a Graduate Member automatically. You can pay to get the Certificate.(GNSE) After 4 years of Post-Graduation from the University,you can apply for Corporate Membership (MNSE)
sweetmichael007: You didn't click the right domain.don't come here and say it a scam when it not
I know what I'm saying. Most of those courses the agency is offering is also free on edx, what they did is just to redirect you to edx from their website. And when you get to edx, you will still have to pay to get certified, so tell me what's the benefit of enrolling through the agency?
This is a scam, and I'm sure this agency will collect a lot of money from government for this program. How will you call this free training, and redirect me to an online school, and I will still have to pay for the certificate?
nextstep: This project is becoming traumatizing: I'm broke, heavily indebted, demoralized; I've taken to drink, I'm having sleepless nights, and I'm very short tempered; I have more bad dreams than usual, and can't focus on anything. We're not due to finish this project till December, no tenants, no new business leads, and still plan to sink 2M before completion. I must admit that I have also contemplated demolishing the whole thing and vowing never to do anything worthwhile again, especially not in Delta state.
I'm only able to write this after spending 1 week feeling dejected, then slightly recovering my spirits. This post is a quick summary of all the things that went wrong with this build.
In summary, we ended up settling in May 2016 for 1.8M to buy the land again (already paid 1.8M to first owner, youths, etc). Long story short, the land tussle was between two ancient gentlemen, and the argument went back 20+ years. You don't realize that as you spend 30k here, 10k there, 70k another place to mobilize police, transport and lodging for a lawyer; 50k for security; 10k for informants; 10k in fuel going up and down; it adds up to a lot. Lesson learned: try to engage with all aggrieved parties immediately and leave police out of your business.
Some memorable events:
2015-11-18 The building was brutally vandalized with all walls almost entirely broken. Spent almost 400k on police, security, lawyers, to fight whoever was responsible, to repair, and to buy more materials that were damaged. 2015-11-23 Plumber cut into decking concrete and rebar. Had to re-inforce and recast that section. 2015-12-02 Temporary staircase put on wrong side (engineer assumed door was in wrong place). Had to spend time and money to fix this, break open the wall that was supposed to have the door, and to demolish and recreate a new temporary staircase 2016-01-12 Some youths and old man show up and chase off workers with cutlass. This happens periodically for several months. 2016-01-14 Panels arrive, doors fabricated, but had to be left outside for 3 weeks because downstairs was not completed. Paid almost 50k for security because of existing land tussle. 2016-03-17 Temporary staircase pushed off by our land tussle guy, and bamboo damaged. Spent money to restore it. 2016-04-07 Temporary zinc and wood structure inside building to protect decking. 90k materials and labour. Ultimately, this fails to keep decking dry. 2016-06-10 Panels removed because of extensive leaking. Specialized labour to disconnect and delicately move it cost 60k. Of course it will cost again to put them back. 2016-06-11 New roof begun, but only 90% complete before I have to return to base in Ilorin. Suspect sabotage. 2016-06-16 LGA men show up, halt work, take 120k of materials from site, insist that 240k must be paid before we can finish the roof.
This is all I can remember, but I will tally cost overruns here: 1800k - land 400k - police issues/security 200k - misc mistakes by personnel 150k - roof mistakes 240k - 2nd payment to LGA (didn't get a receipt the 1st time)
So, in addition to the reasonable costs of building (which includes land, tax, youths, materials, labour, transport), the overruns caused by all our issues is about 2.8M
This is enough to make me sick and weak at the knees. This is a very heavy price to pay for my inexperience, and my desire to help move Nigeria forward. Sometimes I wish I had just used this money to just start an import business, or some other low-risk business but I had high hopes. I pray to learn from these mistakes and pray that in the coming years, I will smile about this episode in my life.
As of 2016-06-27, heavy rains enter building and decking is heavily soaked. The rain is damaging the walls and water is dripping unto the materials and batteries below. No money for 2 months so we just siddon look. The irony is that I could have left the leaking roof alone, saved my money, and still have the same situation. July is going to be absolutely awful as the rains play havoc with this building.
Wow. I stumbled upon this thread, and I have to say it's engaging and educative. I like the way you pitched your ideas and went on to do some experiments. I say may God bless you abundantly, and continue to increase your knowledge.
One of the problem we have in this part of the world is lack of adventure or experimentation, we don't want to fail (including me), but we also lack the materials that won't let us fail, or reduce the rate of failure, which is proper documentation or research works (not some theoretical jargons we have piled up in our universities). This your work has really changed my view about renewable energy.
Some of the challenges you encountered are the reason why our country still remain the same, something like this you are doing should be able to get funded by technology schools or FG, and again you should have protection of the government, why should you have to buy land twice?
Please I will like to know what's the out come of the Project, the problems encountered, how they were solved.
duality: How do you save the udemy courses on telegram.
Search for Udemy, and some Udemy coupon channels will come up, check the file section of each channel, and you might find some relevant complete Udemy courses that have been uploaded, so you can save them (saving is like chatting with yourself, click on the course and forward it to yourself, or in some other telegram api, you will see option like "send to cloud", still the same thing), you can also repeat this process for lynda courses too.
I use telegram as a cloud storage, I have many lynda, Udemy, pluralsight courses saved on my telegram, many channels to download music, app, movies, books, software, etc. I just like that app.
saydfact: this calculation is for 600m2 of concrete using 1:2:4 and thickness of 150mm
CEMENT = 570 bags
SAND = 64 tonnes
GRANITE = 160 tonnes
this calculation is for 600m2 of concrete using 1:2:4 and thickness of 100mm
CEMENT = 380 bags
SAND = 43 tonnes
GRANITE = 106 tonnes
Goodluck
Hello boss. I still jam you for here again. Lol.
I'm a young engineer, and most of the jobs I've taken is company job, and the major role is quality assurance. So I always have problem with this calculation of materials needed to produce concrete.
My problem is this: Using the 1:2:4, you calculated 380bags of cements, 43 tonnes of sand and 106 tonnes of granite.
1: 2: 4 means, for 1 bag of cement, we will put 4 head pan of sand, and 8 head pan of granite. I was told that 5 tonnes of sand contains 20 wheel barrow, and 1 wheel barrow is 4 hp of sand, approximately 5 tonnes contains 80hp of sands. So we can therefore say 4hp is equal to 0.25 tonnes. Same calculation for granite too, that 5 tonnes of granite contain 20 wheel barrow, since granite is twice that of sand, 8hp of granite equals 0.5 tonnes.
Using this information with 1:2:4, it means 1bag of cement to 0.25 tonnes of sand to 0.5 tonnes of granite => 1:0.25:0.5
Since we calculated 380 bags of cement, if we use it to multiply this ratio : Sand = 380 × 0.25 = 95 tonnes Granite = 380 × 0.5 =190 tonnes
Which is quite different from your calculation. I will like you to enlighten me more on this.
saydfact: Morning and thanks for following my threads. No1. Thickness of Reinforcement is 12mm or 16mm (if you have offcuts on site)
No2. Thickness is 100mm but width is 150mm or 225mm depending on the width of the block used.
You're mistaken width for thickness...
Regards
Okay I get your point now, your thickness means height, so may I ask why you used height of 100mm, because if you do insitu lintel, you give it the height of the of the hollow block that will chain with it?
I want to say a very big thank you to you. I went through the whole thread and it's educative.
My question is about the precast lintel. 1. What's the details of the reinforcements in it? 2. I read where you replied someone that the thickness of the lintel is 100mm, but the wall it'd bridge is 225mm, is it the plastering that will make up for the rest the lintel thickness?
Patrioticman007: What a world, FG needs to pump $1 billion dollars into Health sector from our foreign reserve immediately to cushion the effects of Aunty Coro. A stitch in time saves nine.