PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 11:39pm On Oct 15, 2024
Can one do POP before doors and windows are installed?
AutosRe: 2015 GLK350 Full Option Toks by MDDarah84(m): 2:58am On Oct 13, 2024
[quote author=Osshenry post=132401766]Yes[/quote

How much?]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 6:03pm On Aug 16, 2024
dapotemi:
I actually think he's rather a SMALL MAN!!!
You don't fight your customer in a public..What I would have expected is simple sorry to the customer, we would do better next time..Just one line and case is close..The rest of us here will take the battle if the clients continue to malign him...Luckily, he has not been accused of scam; just poor customer care and that is EVIDENT even from his response here...To climb ladder hard o, to fall yakata na ABC...
In his line of biz, you will meet all sort of customer ; the impatience, the not so good, the knuckle head, even outright werey client but you have a responsibility to MANAGE them all, and sometimes when you fail because of your own imperfection, you maintain your CALM and DECORUM and not acting like a tout..
A client bought an item worth 200k only from us last week and returned it after 72 hours that she doesn't like it and ask for a refund! The report got to my desk for approval, and I spoke to the client and she was saying rubbish so I rejected it! Later my boss called me and advice that I should approve, not because the client was right but because we have a NAME to protect and we can afford to refund! We made over 5 billion worth of sales last month and it was our highest figure ever, and we are still celebrating . Why allow this '200k' to spoil our joy? I learnt a valuable lesson that moment..The Yorubas here will remember that popular saying " ONIYANGI MA BA TEMI JE, ASO ALA NI MO WO!!! Do better oga.
That's quite an irony bro.

To add to your experience,my contractor ordered for a load of sharp sand to complete a job . Unfortunately the sand delivered was not good enough.He had delivered about 10 that was great.I was furious but when I called the driver, immediately he picked my call ,he said I am sorry for the poor quality Sir.I can tell you,I got weak and was speechless.He told me he won't make such a mistake again that his boys messed up.
It was top notch and wouldn't hesitate to contact him next time.

In this world,a lot has stooped to conquer.A customer is still the king of your business.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 8:29am On Aug 16, 2024
money121:
Imran roofing....you are not a scammer
Just incase you still need my whatsapp number
08085310359
Always Active cool For Serious Buyer Only
And if you care to know much about roofing join my Tiktok Live


Ire oo cool
You are doing well big man....keep it up
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 9:03pm On Aug 15, 2024
erico2k2:
I watched your tiktok video I must say it was embarasing.My ho 3st opinion is for you to take it down.The customer is always the. Boss.I have personally bought roofing materis that includes all 5hks accessary you mentioned so I u derstand what you are saying about the time it takes.No my advice is 5his.this time you tool to post that video would have been bettter spent at gently and calmly explaining the process of the folding and bending of ridges and ridge caps.You had a BEST customer right there cos he paid in full upfront all U had to do was deliver.He paid smoonthly but you did not deli er smoon.You sir are not a 5hief or scammer or a bad person but your customer service is lacking.U need to spend time to improve and upgrade.
My 2 cent.I come in peace.
Absolutely on point..Imran roofing....you are not a scammer but from my little chats with you on Whatsapp,your customer service needs a lot of improvement.I deleted your number immediately I read your response to my chat.

Cheers!
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 8:55pm On Aug 15, 2024
justcallmenuel:
Good day everyone, this is what transpired btw me and money121. After someone on nairaland (his brother) recommended me to him that he sells roofing sheets, I decided to give him a try, chatted this guy and sent him pictures of the type of roof I wanted, he gave me his price, and I told him I will back get back to him.. 3 days ago i texted him on WhatsApp and told him I will be coming on Wednesday which was yesterday, he said ok no problem. Yesterday morning which was Wednesday, I chatted him up for directions, he sent it.. got to the bus stop which he said me and my roofer should wait for him by 11:08am, I came to the bus stop and pick us and took us to the factory of his Oga (not his own) I didn’t mind. We sat there, discussed and and finalized the whole thing, I made payment (4.8m) by exactly 11:50am. After making that payment, this guy changed. He kept on lying to me that the driver that will come and carry my goods is coming that I should chill which I did. By 3:10pm I went inside to call him cos I was already angry and tired and needed to go home.. the tout started shouting at me and was asking me “which time did I made payment “? And even started insulting me. Just imagine! I got furious and the owner of the factory came out and was calming me down. The owner of the factory ( an igbo man) asked him, why will you be talking to a customer like that? He kept shouting and shouting till all his colleagues came out, that was when I knew that I fell into the wrong hand… imagine this guy (money121) telling my roofer that he shouldn’t count the roof tiles well and he (my roofer) should go and tell me it’s complete when it’s not.. I saw hell yesterday from the hands of this guy (money121) and yesterday is the last time I will do any business with any online vendor.


Hello house, +234 805 943 1517 (IDE roofing ) this is the contact of the real owner of the factory.
Oh,

The IDE roofing guy is a wonderful guy.He has done a lot for me without a penny even though I am yet to buy a single sheet from his company.I am not sure he's on this platform but I recommend him to anyone
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 8:16pm On Aug 04, 2024
[quote author=Philipok post=131302102]We are nw available for ur neat and quality artwork design,09058432795[/quote

At what stage of the building do I need this ?
I am doing roofing this week?
PropertiesRe: My 3 Bedroom Ensuite Bungalow by MDDarah84(op): 7:13am On Jul 12, 2024
A clearer one

PropertiesRe: My 3 Bedroom Ensuite Bungalow by MDDarah84(op): 7:09am On Jul 12, 2024
The floor plan

PropertiesMy 3 Bedroom Ensuite Bungalow by MDDarah84(op): 12:53am On Jul 12, 2024
People of God, please help look at this estimate from my handler to construct a 3 bedroom ensuite bungalow...blockworks from foundation till the end
ESTIMATE FOR ROD WORK

(1) 12MM 40 LENTS × ₦10,000 = ₦400,000

(2) 10mm 30lent × ₦8000 = ₦240,000

(3) 8mm 40 × ₦5500 = ₦220,000

(4) band wires ₦40,000

(5) TRANSPORT ₦20,000

(6) WORKMANSHIP = #155,000

BRICKLAYING WORK

1, 5000 6 inches block at #600 per block = 5000 x #600 = #3,000,000

2, cement, Block settings 150 bags x7800 #1,170,000

3, cement for blinding 30 bags x 7800 = #234,000

4, cement for volume and lintels 50 bags x7800 #390,000

6, sharp sand 5 loads of 10 tyres = #750,000

8, Digging and clearing = 100,000

9, setting out = 50, 000

10, blinding = 60,000

11, block setting to Dpc = 175,000

12, back filling, rammed and casting of Dpc = 250,000

13, block setting, lintels, and columns to finish = 850,000


15, plastering= 700,000

16, 49 tons of granite with transportation= 708, 000

17, literate for filling four loads = 280,000

18, High polisterine mesh 4 bundles at #162,000

TOTAL = #9,050,000
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 11:09pm On Jul 09, 2024
MDDarah84:
People of God, please help look at this estimate from my handler to construct a 3 bedroom ensuite bungalow...blockworks from foundation till the end
ESTIMATE FOR ROD WORK

(1) 12MM 40 LENTS × ₦10,000 = ₦400,000

(2) 10mm 30lent × ₦8000 = ₦240,000

(3) 8mm 40 × ₦5500 = ₦220,000

(4) band wires ₦40,000

(5) TRANSPORT ₦20,000

(6) WORKMANSHIP = #155,000

BRICKLAYING WORK

1, 5000 6 inches block at #600 per block = 5000 x #600 = #3,000,000

2, cement, Block settings 150 bags x7800 #1,170,000

3, cement for blinding 30 bags x 7800 = #234,000

4, cement for volume and lintels 50 bags x7800 #390,000

6, sharp sand 5 loads of 10 tyres = #750,000

8, Digging and clearing = 100,000

9, setting out = 50, 000

10, blinding = 60,000

11, block setting to Dpc = 175,000

12, back filling, rammed and casting of Dpc = 250,000

13, block setting, lintels, and columns to finish = 850,000


15, plastering= 700,000

16, 49 tons of granite with transportation= 708, 000

17, literate for filling four loads = 280,000

18, High polisterine mesh 4 bundles at #162,000

TOTAL = #9,050,000
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 5:53pm On Jul 09, 2024
People of God, please help look at this estimate from my handler to construct a 3 bedroom ensuite bungalow...blockworks from foundation till the end
ESTIMATE FOR ROD WORK

(1) 12MM 40 LENTS × ₦10,000 = ₦400,000

(2) 10mm 30lent × ₦8000 = ₦240,000

(3) 8mm 40 × ₦5500 = ₦220,000

(4) band wires ₦40,000

(5) TRANSPORT ₦20,000

(6) WORKMANSHIP = #155,000

BRICKLAYING WORK

1, 5000 6 inches block at #600 per block = 5000 x #600 = #3,000,000

2, cement, Block settings 150 bags x7800 #1,170,000

3, cement for blinding 30 bags x 7800 = #234,000

4, cement for volume and lintels 50 bags x7800 #390,000

6, sharp sand 5 loads of 10 tyres = #750,000

8, Digging and clearing = 100,000

9, setting out = 50, 000

10, blinding = 60,000

11, block setting to Dpc = 175,000

12, back filling, rammed and casting of Dpc = 250,000

13, block setting, lintels, and columns to finish = 850,000


15, plastering= 700,000

16, 49 tons of granite with transportation= 708, 000

17, literate for filling four loads = 280,000

18, High polisterine mesh 4 bundles at #162,000

TOTAL = #9,050,000
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 9:10pm On Jul 05, 2024
MDDarah84:
Please how many.bags of cement can I budget for the DPC(German floor) for a 3 bedroom ensuite bungalow?...260sqm.

Thank you
Please
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 3:27pm On Jul 05, 2024
Please how many.bags of cement can I budget for the DPC(German floor) for a 3 bedroom ensuite bungalow?...260sqm.

Thank you
PropertiesRe: Can #20m Build This House? by MDDarah84(op): 5:27am On Jul 05, 2024
Please how many.bags of cement can I budget for the DPC(German floor) for this 3 bedroom ensuite bungalow?...260sqm.

Thank you
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 9:15am On Jun 25, 2024
Please do you mean Stone coated roofing sheets do leaks? Or do you mean longpan aluminum roofing sheets is better?
quote author=money121 post=130636062]
Tell your engr that the building will leak till kingdom come[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 2:26pm On Jun 12, 2024
I need your advice my bosses.

quote author=MDDarah84 post=130436039]Please what are the likely disadvantages of using 6 inches cement blocks instead of 9 inches for a 3 bedroom bungalow?

Thank you[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 12:51pm On Jun 12, 2024
Please what are the likely disadvantages of using 6 inches cement blocks instead of 9 inches for a 3 bedroom bungalow?

Thank you
PropertiesRe: Can #20m Build This House? by MDDarah84(op): 7:05pm On May 27, 2024
My electrical contractor just gave me #3m quote plus his Service charge.

uote author=Tallesty1 post=130167897]I am sure you don use eye commot how much electrical work alone go commot from that money.

That is the first thing I did.[/quote]
PropertiesRe: Can #20m Build This House? by MDDarah84(op): 6:57am On May 27, 2024
Do you mean like using not too standard materials?

quote author=Ynix post=130159982]

It's possible depending on construction materials[/quote]
PropertiesRe: Can #20m Build This House? by MDDarah84(op): 8:42pm On May 26, 2024
dawnomike:
Woth the current inflation... The answer is No
So how much should I be budgeting? It is a 3 bedroom bungalow
PropertiesRe: Can #20m Build This House? by MDDarah84(op): 8:41pm On May 26, 2024
Puss360:
Bungalow, with 4 bedroom, yes it can build
It is a 3 bedroom bungalow
PropertiesCan #20m Build This House? by MDDarah84(op): 8:21pm On May 26, 2024
Hello my people,
Please can #20m build this house? Fencing is not part of it as the land is fenced already.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 3:26pm On May 25, 2024
Please can one build during this rainy season between August and November? Any thing to be worried about during this period?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 3:18pm On May 25, 2024
Okay,thanks bro

quote author=saydfact post=130127087]

Let me list 20 things that wld cost more than 1m while building this.

1. Foundation
2. German Floor
3. Blockwork
4. Parapet
5. Roofing (roof covering)
6. Carcass and ceiling
7. Window and doors
8. Ironmongery
9. Electrical /Plumbing piping
10. Electrical wires
11. Electrical/plumbing fittings
12. Plastering
13. Screeding / painting
14. Tiles only
15. Bricklayer Workmanship
16. Carpenter/ Iron Bender /Tiler workmanship
17. Furnitures (wardrobe and kitchen cabinet)
18. Fence work
19. Septic tank and soak away
20. Compound work


If all the above cost only 1m, then you've already spent 20m but some of the items above eg Electrical wires, roof, septic tank, etc cost more than 1 million.

Answer: 20 million can't build this sir.[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 2:13pm On May 24, 2024
Hello bosses,

Please can #20m complete this structure with the interior design?

Thank you

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 6:04pm On Mar 17, 2024
saydfact:
Might not be
Tilers charge btw 750 - 1000 these days.

The amount depends on his quality of work.

Just negotiate to what you can afford.

Goodluck
Okay thank you
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 4:37pm On Mar 16, 2024
Help me,
My tiler is charging me #900 per square meter.
Is this not overcharging please?

Project is in Ondo state
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 11:16pm On Feb 11, 2024
Adedward:
for the windows, I will advise u to use casement windows, the advantages is far far better than sliding window,and the differences in money is not much now, thanks
Okay boss..... Thank you
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 1:20pm On Feb 11, 2024
saydfact:
Ie 2 bedroom flat x3.

102 bags is about 35 bags per flat.... I don't think it's too much, except the 2 bedroom flats are not big ones (maybe if you share the floor plan).

For plumbing - MINUS THE FITTINGS, sink, WC ETC budget about 200k per flat for the pipe works up to Septic tank/soak away or just budget about 100k per flat if its just for the interior to allow plastering (again is a guess without seeing the floor plan and could be wrong).


Tiling can't be calculated without seeing the plan

Casement is always better EXCEPT WHEN COST IS AN ISSUE..... then sliding is acceptable.

Goodluck.
Thanks for this response bro.

Can you avail me your email so I can reach you please?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 8:01am On Feb 11, 2024
MDDarah84:
Hi bosses,

Please I have a line of 3 units of 2bedroom flats under construction.I am about doing the plastering and flooring and the bricklayer requested for 102 bags of cement..my questions are as follows please;

1..Is the 102 bags not too much?

2.. considering that I am still going to tile the whole floor and the bathroom and kitchen walls,what's the effect on the number of bags of cement stated above?

3..How much should I budget for tiling (tiles and service charge)

4..how much should I budget for plumbing with the service charge.

5.The person monitoring the building advise I use sliding windows,is that not old fashioned.House is for rental purposes.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by MDDarah84(m): 11:09pm On Feb 10, 2024
Hi bosses,

Please I have a line of 3 units of 2bedroom flats under construction.I am about doing the plastering and flooring and the bricklayer requested for 102 bags of cement..my questions are as follows please;

1..Is the 102 bags not too much?

2.. considering that I am still going to tile the whole floor and the bathroom and kitchen walls,what's the effect on the number of bags of cement stated above?

3..How much should I budget for tiling (tiles and service charge)

4..how much should I budget for plumbing with the service charge.

5.The person monitoring the building advise I use sliding windows,is that not old fashioned.House is for rental purposes.