PropertiesRe: My Five (5) Bedroom Bungalow - The Building Process by micbjrex(m): 7:40pm On Mar 30, 2015
thank you century106......appreciated
PropertiesRe: My Five (5) Bedroom Bungalow - The Building Process by micbjrex(m): 12:11pm On Mar 29, 2015
@century106......how many trips of 7.5 ton sand did you use from foundation to level ( leave out the trips for moulding)?
PropertiesRe: My Five (5) Bedroom Bungalow - The Building Process by micbjrex(m): 4:52am On Mar 29, 2015
century106:
I will get back to you on number of trips of sharp sand - need to consult my expense log book.

A total of 162 bags of cement and 5 trips of gravel was used from foundation, to block work, lintel, 3 courses on top of lintel for internal walls and 2 courses for outer walls and for casting of German flooring. A total of 21 + 2 (on the plot) trips of sharp sand was used for block work and block molding, I will get back to you on the number trips for just block work, lintel and German floor.

I molded 169 bags of cement; 28 blocks per bag for 6" solid and 32 blocks on the average for 5" solid block - I was after strong and solid blocks not quantity. You can mold up to 40 blocks per bag for 5" if you want, people do that. So about 5,200 blocks were made, I have about 150 left. So the building consumed 5,000 -- 5,100 blocks from foundation to roofing...

Thanks for your prayers. May my God bless you
. Century106......please give the trips of sand and trips of gravel in tonne (trips of 5 or 10 ton)
PropertiesRe: My Five (5) Bedroom Bungalow - The Building Process by micbjrex(m): 8:25pm On Mar 28, 2015
@century106...thank you for the cost update. Congrats and may our good Lord bless you more to complete your project. Please how many blocks, bags of cement, tons of sharp sand, tons of gravel did you use from foundation to 2/3 blocks after lintel? Please just exclude the materials for moulding of the blocks. Thanks
PropertiesRe: My Five (5) Bedroom Bungalow - The Building Process by micbjrex(m): 8:28am On Mar 27, 2015
Hello bro. Can you share the materials plus labor costs of the project? Thanks
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 10:07pm On Mar 26, 2015
Thank you but what about materials for doors and window
From your post, I understand that I will need 20 rods for the longitudinal pillars, 15 links.....i dont get that part, please help break that down in layman's term, 12 bags of cement, 1 ton sand, 3 ton gravel

then for the 2 arcs, i need 3 rods, 2 bags of cement, 1 bar of Y8 rod, then use from the above sand and gravel.

please, help do the math for pillar base mat and doors and windows too..thanks
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 6:28pm On Mar 26, 2015
Thanks my oga....hope your going going...you re doing a good job. please bro, pls help calculate the ton of sand, ton of gravel, 12mm iron, rings, cement to construct 15 pillars (height of about 15 coaches of 6 inch block), 21 windows (11 nos of 1800mm, 3 nos 0f 1500mm, 2 nos of 1200mm, 5 nos of 900mm.

19 doors [17 nos of 900mm, 2 nos of 1200mm]
2 arcs of 2400mm.

thanks
PropertiesRe: The Construction Of 14 Class Room At Emuhoa Community Rivers State by micbjrex(m): 11:15pm On Mar 25, 2015
Thanks for this info. Is the trip of sand 5 ton or 10 ton? I want to ask you how many trips of 5 ton sharp sand can set (not mould) 5000 blocks? Thanks
PropertiesRe: Hardwood For House Roofing 2x2, 2x3, 2x4, 2x6, 1x12, 3x4 call 08182481552 by micbjrex(m): 3:49pm On Mar 16, 2015
HsLBroker:
2x2x12 = 280pcs x N300 = N84, 000
2x3x12 = 200pcs x N400 = N80, 000
2x4x12 = 350pcs x N500 = N175, 000
3x4x12 = 38pcs x N800 = N30, 400

2 bags of 3 inches Anti rust nail @ N5, 500 x 2 = N11, 000

2 bags of 4inches Anti rust nail @ N5, 500 x 2 = N11, 000

Oja Agba 2 dozens @ N1500 per dozens = N3, 000

Transport is N30, 000

Workmanship is N140, 000

Total is N561, 400 (for each building)

Note: for the two buildings, we would multiply it by 2, that will be N1, 122, 800

Regards
Rabii Adeniyi
08182481552, 08088574969
Hello sir. Thank you. You did not give a quote for 1x12x12 woods and it is one structure of size 21.425m x 10.400m
PropertiesRe: Hardwood For House Roofing 2x2, 2x3, 2x4, 2x6, 1x12, 3x4 call 08182481552 by micbjrex(m): 9:56pm On Mar 12, 2015
i will be using longspan aluminium 0.45. ceiling logging will be for pvc. thanks
PropertiesRe: Hardwood For House Roofing 2x2, 2x3, 2x4, 2x6, 1x12, 3x4 call 08182481552 by micbjrex(m): 4:02pm On Mar 12, 2015
Hello bro. I want roof a twins flat of 3 bedrooms each of size 21.425m x 10.400m. what quantity of woods, nails, ojaagba, labour will do the job?
Take into consideration outhangs of 1.2m on each side of the structure and roof height of 10ft. Thank you
Christianity EtcRe: Have You Praised Him Yet, Today? by micbjrex(m): 9:30pm On Feb 27, 2015
God, you alone are worthy and awesome to be praised. May your name be glorified. If I don't praise you I am an ingrate. Thank you Lord.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 4:50am On Feb 20, 2015
Tmex:
. The prices are as follows,
5 tonnes of sharp sand .................8000.
5 tonnes of gravel .........................17000
9 inches blocks...............................140
6 inches blocks...............................130
5 tonnes of soft sand.....................8000
5 tonnes of plastering sand ..........8000
Elephant cement .......................... 1850

we will be glad to hear from you soon.
. What about 5 ton of laterite? You can drop your email and phone numbers.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 3:37pm On Feb 19, 2015
@tmex.......are you a supplier? Where are u located in Ibadan?
PropertiesRe: Do You Have Problems With Supply Of Building Materials ??? by micbjrex(m): 9:52pm On Feb 18, 2015
How much is the following in Ibadan. 5 ton of sharp sand, 5 ton gravel, 5 ton granite, 5 ton granite, 9 inch block, 6 inch block, 5 ton soft sand, 5 ton plastering sand, 12mm iron rod, elephant cement. Thank you
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 7:00pm On Feb 18, 2015
How much is the following in Ibadan. 5 ton of sharp sand, 5 ton gravel, 5 ton granite, 5 ton granite, 9 inch block, 6 inch block, 5 ton soft sand, 5 ton plastering sand, 12mm iron rod, elephant cement. Thank you
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 10:09am On Feb 18, 2015
bettercreature:
You will need about 45bags of cement,2 sands and 5gravels,there must be ark or beam you didnt write that
. I wrote arc instead of ark. Thanks
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 8:45am On Feb 18, 2015
Thanks...i want to know if galvanized zinc is good for roofing. if okay, how much will it cost of roof a building size of 21.425mx10.325m?
PropertiesRe: how much will it cost me to Roof a 3 bedroom building by micbjrex(m): 10:43pm On Feb 17, 2015
@op.....what is the size of your 3 bedroom bungalow? Is galvanized zinc better than aluminium? What is the thickness of the zinc? How many do you have in a bundle and what is d size of each? Thank you so much
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 12:36am On Feb 17, 2015
@bettercreature. Thank you. For 2 nos of 1200mm windows, 2 nos of 2700 window, 6 nos of 600mm window, 12 nos of 1800mm window, 18 nos of 900mm door, 2 nos of 1200mm door, and 2 nos of 2700mm arc, 2 nos of 2000mm arc, 6 pillars. Please how many trips of sand and gravel and bags of cement will I need. Thanks
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 7:04pm On Feb 16, 2015
I want to do coping on my fence of 100ft x 50ft since the rain season is near. Please how much should I be looking to spend in terms of irons, woods, cement, hanger rods for barbed wire, 3 inch rods, barbed wire bundles, carpenter, mason, fixing of barbed wire. Thanks
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 1:11am On Feb 16, 2015
Thank you all. Somebody pointed out in one of the posts above that I possibly want to go cheaper. Nope I am not. I just put this thread up to learn a lot from all those that have built a similar structure before. And since I am not home now it is not out of place to double check the quote I have got. Thank you all. Please keep the teaching coming.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 8:13pm On Feb 15, 2015
Wow......thank you all for your contributions. Please teach me more so I will handle my workers. But the issue now is I am not currently in naija to see things for myself.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 2:35pm On Feb 15, 2015
@bettercreature. Thank you. Please continue the teaching. I appreciate it. What are d sizes of the soakaways?
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 8:36am On Feb 15, 2015
Hello sirs, I am so much grateful for your help. The building is just a bungalow of 2 nos of 3 bedrooms attached together. No suspended decking. I actually wanted to know if what his quote says is what I need or I will need more. For example, he wants me to budget 5500 blocks and 85 bags of cements to set to them. He said he will set/ chalk on top of each about 50 blocks with a bag of cement.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 6:16am On Feb 15, 2015
Thank you sir. What about setting of 5000 to 5500 blocks for structure? 6 Pillars and all lintels? Blinding? How many cement, sand and gravel needed? Thank you
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 2:28am On Feb 15, 2015
Thank you for the analysis. I tried to ask the mason how he will do the DPC with 30 bags of cement. He said the dpc will be 4 inch thick and will use 4 trips of 5 ton sand (20 tons) and 2 trips of 5 ton gravel/granite (10 tons). Assuming 30 bags, how many trips of sand and granite will i need for dpc?
For casting of foundation, if 20 bags..how many trips of sand and granite is needed?
For 8 pillars, beams, baskets, lintels, how many trips of sand and granite is needed?
For setting 5500 blocks, how many trips of sand and granite is needed?

Thank you
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 1:05am On Feb 15, 2015
@abdulwastecx...thank you...your suggestion is well noted. So how many pillars will be okay for a bungalow of size 21.425m x 11.525m? Also please help me scrutinize the quote.
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 10:53pm On Feb 14, 2015
@CityNG. Thank you. So I can put the balcony on either end. But please help check the quote. Is it reasonable?
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 10:41pm On Feb 14, 2015
@seunlayi....thank you...but how cheaper can I go in terms of materials and labor?
@CityNG...Thank you. where can I place the balcony on the plan?
PropertiesRe: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 8:34pm On Feb 14, 2015
I recently got the quote below for all the works from foundation to level. please help scritinize it. Thank you all.

PropertiesCost Of Building Twins Flat Of 3 Bedrooms In Ibadan by micbjrex(op): 8:21pm On Feb 14, 2015
Hello everyone,
I will need your help in helping to analyse what quantity of materials I will need to build a twins flat of 3 bedrooms of the size in the file below in terms of quantity of blocks, cement, sand, rods (12mm), rings, binding wire, granite I will need to do my foundation about 3-4 coaches, german floor 4 inch thickness, and the superstructure from german floor to level (2 blocks after). The structure will have 15 pillars. what about labor for welder, carpenter, and mason? The site is in Ibadan, soil strong and land, table flat. Thank you for helping with your expertise. I will post a quote I got soon.

1 2 3 4 5 6 (of 6 pages)