Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 11:14am On May 02, 2021 |
topsy23: Thanks chief |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 5:18pm On May 02, 2021 |
rotecch77: Hope these bags were bought when they were sold at 3k |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by mufutau55(m): 5:22pm On May 02, 2021 |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:31pm On May 02, 2021 |
folmus: Infact, it’s terrible, we bought 3300,3500 and 3700 so far |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:33pm On May 02, 2021 |
mufutau55: Baba Hajji Thank so much , I really appreciate sir. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:38pm On May 03, 2021 |
Super structure loading...... |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 4:40pm On May 04, 2021 |
rotecch77: Oga o! I was told 3800 in Sagamu |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 8:40pm On May 04, 2021 |
folmus:No be lie o I bought @3800 in Epe/Awoyaya expressway also |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:20am On May 07, 2021 |
Super structure block work update coming soon |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 12:59pm On May 10, 2021 |
New week new stage of work.... super structure block work. Skilled labour on site -15nos Unskilled labour- 8 nos Supervisor-3 Project manager -1 We have only 3days to take the block work to lintel level .. Watch out
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:32pm On May 10, 2021 |
Just day 1 2000 pcs of 9” block off.. Well done guys. Closing time 4:50pm Total cost: stayed tuned
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:33pm On May 10, 2021 |
More
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by bixton(m): 9:16pm On May 10, 2021 |
rotecch77: You used 15 people to run off 2000 blocks...... Are you paying by counting or per days' job arrangement?? |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:23pm On May 10, 2021 |
bixton: Could you believed I run both system for them. I arranged them into 3 group and the rest is history 2 Likes |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by ArcToyin(m): 4:24pm On May 11, 2021 |
Am always fascinated with your mortar. What is the mixing ratio? |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 4:38pm On May 11, 2021 |
ArcToyin:Thanks chief We do 1:6 in most cases 1 Like |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 5:02pm On May 11, 2021 |
rotecch77: Oga rotecch77, what's the appropriate ratio for concrete work? |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:34pm On May 11, 2021 |
folmus: We have many on this I.e 1:2:4 , 1:3:5 etc 1 Like
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:50pm On May 11, 2021 |
More
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:26am On May 12, 2021 |
“Tell us your mind and let’s modify it and bring it to reality” @ Arbo contractor Ltd and Rotech building concept. Both registered with CAC .... we are there for you. Building drawing Construction Renovation Mini estate rd Mechanical service Elect service Finishings I.e tiling, pop,painting etc 08066619493. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:59pm On May 13, 2021 |
Happy eid Mubarak to all our Muslim clients and followers |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:19am On May 15, 2021 |
Lintel for all the doors and window loading.... |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 7:47am On May 15, 2021 |
rotecch77: Thanks |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by folmus: 7:48am On May 15, 2021 |
rotecch77: Looking forward. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:09pm On May 17, 2021 |
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 7:30pm On May 17, 2021 |
Progress update
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by dudufemi(m): 7:01am On May 18, 2021 |
We done sir... Are you moulding the block by yourself or you are buying the block?. |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 6:29pm On May 18, 2021 |
dudufemi: The client operates block industry, so he supplied all the blocks needed. Site updates pics Columns formwork almost finished.... about 65 columns just in 7 hours
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:41pm On May 19, 2021 |
Watch out for more pics update |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 9:17pm On May 20, 2021 |
Casting of the columns done...65nos All done in 7 hours Now of workers -14 Cements used 50 bags Cost 3800 per bag. In other news I went round Benin city yesterday to check cost of materials for our new project “ CONSTRUCTION OF 6 FLATS “ Guess what 9” hollow block sold for N350 per one. Cement 4000 per bag. 1 Like
|
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(m): 5:41pm On May 21, 2021 |
Round chain lintel loading ...... |
Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by beehorla: 4:55pm On May 22, 2021 |
Well done sir, jst a quick one, u don't show On ur reinforcement works for d over-site concrete before casting or no reinforcement was done? And wat is d dept of ur excavation. |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)
Top Lies Told By Real Estate Agents / THE FLOURISH APARTMENTS AND TERRACES, ORCHID ROAD BY CHEVRON LEKKI. / What's The Alternative To Asbestos Ceiling In Nigeria?
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 21 |