Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED (4003 Views)

Showroom For Exotic And Bespoke Metal Works/fabrication For Your Housing Project / Two-Storey Building Collapses In Zaria, Four People Dead (Photos) / Candle Fire Burns Two-storey Building In Lagos, A Tenant Dead (2) (3) (4)

(1) (2) (3) (Reply) (Go Down)

Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 10:31am On Jun 17, 2021
To the glory of God, I have been made a part of an ongoing project in Enugu. The project is being handled by our own engineer Spyder880.

I'm to do the iron works needed in the building. They include standing tank, exterior doors,stair rails, and balcony rails. I will still be constructing a rolling gate at the said site but that will be later though.

Here's the link to the project https://www.nairaland.com/6173835/enugu-hilltop-6-flats-2

2 Likes

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by spyder880(m): 10:36am On Jun 17, 2021
michlins:
To the glory of God, I have been made a part of an ongoing project in Enugu. The project is being handled by our own engineer Spyder880.

I'm to do the iron works needed in the building. They include standing tank, exterior doors,stair rails, and balcony rails. I will still be constructing a rolling gate at the said site but that will be later though.

Here's the link to the project https://www.nairaland.com/6173835/enugu-hilltop-6-flats-2

You're welcome to the Coal City once again, we appreciate your good works.

1 Like

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 10:38am On Jun 17, 2021
Details of the job are

25ft tank stand for six(6) 500 gallons of water. The materials to be used are:

6 by 3 H channel

3 by 1½ H channel

2" angle iron.

The rest of the materials are

1" by 4ft foundation bolt

10mm base plate.
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 10:42am On Jun 17, 2021
I was mobilized on Wednesday and we're moving to site right now with materials for the standing tank.

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 8:53pm On Jun 17, 2021
Moved around town and familiarized myself with my new environment. Checked out the welders around to see how they work and get friendly with them.

I might be needing their help. Something about working on site is that your tools might fail and you need to fix it. You will be needing a local help to do such

4 Likes

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 8:58pm On Jun 17, 2021
The materials on site

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:22pm On Jun 18, 2021
Today,we dug the foundations. By tomorrow,we start casting it.

Enugu soil is the toughest I have seen. Everywhere is stone pebbles

2 Likes

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 3:22pm On Jun 19, 2021
We left the foundation uncompleted yesterday cause the soil there is the hardest anywhere I have worked.

Today, my workers completed it and asked that I let them go home to rest. It wasn't funny at all.

On Monday, work will start on the doors and the casting of the foundation as everything is set for it

2 Likes

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by folmus: 3:40pm On Jun 19, 2021
following!
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by Martini101(m): 6:56pm On Jun 19, 2021
michlins:
Today,we dug the foundations. By tomorrow,we start casting it.

Enugu soil is the toughest I have seen. Everywhere is stone pebbles
Welcome to Enugu. You should engage @spyder880 for consultation �����

1 Like

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:28pm On Jun 19, 2021
Martini101:

Welcome to Enugu. You should engage @spyder880 for consultation �����
I was with him yesterday and today on site.


Man is so down to earth

3 Likes

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:28pm On Jun 19, 2021
folmus:
following!
you're welcome
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:30pm On Jun 19, 2021
The foundation. It's actually deeper than this. Took this picture earlier today.

The hole is almost 5ft deep

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by Martini101(m): 7:48pm On Jun 19, 2021
michlins:
I was with him yesterday and today on site.


Man is so down to earth

An average Enugu man is down to earth, talk more of a full blooded one like Syder. Una weldone.

1 Like

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:01pm On Jun 19, 2021
Martini101:


An average Enugu man is down to earth, talk more of a full blooded one like Syder. Una weldone.
well over here, you can't be rich and humble
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 12:11pm On Jun 21, 2021
Currently moving materials for the doors to workshop

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 12:13pm On Jun 21, 2021
More photos

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 12:14pm On Jun 21, 2021
I will be doing a total of twenty two (22) doors.

Seventeen (17) will be 4ft wide while five (5) will be 3ft doors
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:21pm On Jun 21, 2021
During the course of today, my workers have been able to cut the pipes for the doors. They were able to frame some of them too

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:23pm On Jun 21, 2021
Close up view of the welding. My workers are good at what they do.


We took delivery of the pan for the doors after the client made his choice

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 11:04am On Jun 22, 2021
The day started bright and work has already started


We're still taking delivery of various materials

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 11:59am On Jun 22, 2021
The remaining materials just arrived

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 5:27pm On Jun 22, 2021
Work on the rails

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 7:12am On Jun 23, 2021
Work was completed on the bigger sized doors. The accompanying smaller ones is what's next

1 Like

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by Tripitaka: 8:35pm On Jun 23, 2021
.
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:16pm On Jun 24, 2021
Tripitaka:
Please what's the best price you can do for the most affordable iron door? 9 pieces. Location is Nnewi too
my best offer for the doors is 30,000 for 5" frame and 32,000 for 9" frames.

The materials I intend to use are

1.5mm 3 by 1½

18 gauge design pan


18 gauge frame
Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:20pm On Jun 24, 2021
I went back to Enugu to start work on the standing tank.

The pictures are how we started today and where we ended

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:22pm On Jun 24, 2021
To ensure that the tank stand is straight thereby ensuring that it can handle the intended weight, I measure and plum it all

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:25pm On Jun 24, 2021
By end of work today, the foundation was completed

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:26pm On Jun 24, 2021
Meanwhile work is still ongoing on the doors and rails in Nnewi

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 9:29pm On Jun 24, 2021
The doors are completed and awaiting the 9" frames for the hanging.

Starting tomorrow, the frames will be ready and my workers will start hanging them

1 Like

Re: Construction Of Metal Works On A Two Storey Building In Enugu. COMPLETED by michlins(m): 3:32pm On Jun 25, 2021
We're currently moving on to the finishing stage of the doors.

(1) (2) (3) (Reply)

Stunning 4 Bedroom Duplex To Let In Cooperative Villa Estate Ajah(1yr Rent) Pics / Do you desire a genuine property in Lagos with C of O at an affordable price? / Four Flats For Sale In Magodo Isheri (pix Attached)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.