Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by somehow: 10:30am On Aug 23, 2022
Came out very nice.

Now I know where to look going forward!

Good job engr.
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:51pm On Aug 23, 2022
somehow:
Came out very nice.

Now I know where to look going forward!

Good job engr.
Thanks chief
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 6:05am On Sep 03, 2022
We are replicating this to one of the kitchen exits door

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by redgem(f): 2:47pm On Oct 07, 2022
rotecch77:
Rooms door…. Still working on it
These are wooden doors?
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:45pm On Oct 07, 2022
redgem:
These are wooden doors?
Yes
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 2:15pm On Oct 10, 2022
Rotecch is FRAUDULENT; INCOMPETENT AND A BIG LIAR

If u check my previous posts, I give positive review to contractors/artisan/sellers here and I also expose the fraudulent/incompetent ones especially after recurrent private discussion

This thread ought to have been opened weeks ago when an incompetency in one aspects of the work he did for me showed up …… but he begged me not to go online that he would fix which he did partially but I finished it privately myself without complaining further

Now, another issue about the roofing of the house he built has been a major and recurrent issue since the roof was installed 3 months ago despite paying him millions for this

The roof leaked recurrently, I had called his attention to it several times , his roofer has been to site more than 5 times to fix this roof but it kept leaking at different sites

I got an independent review on this roof job and I was told he did not use a good roof materials and enough wood to support the roof despite paying him several millions for roofing . One of his roofing staff carelessly confirmed the cause of this recurrent roof leakages in the presence of my supervisor, in one of their various visits to fix the roof .

I drew Rotecch attention to the root of this recurrent roof leakages …initially he argued as usual but later sent his roofer to go inspect and rectify issue . Rotecch also bought additional 2 by 2 wood to support the roof ( because my POP man on NL also confirmed lack of wood support to even hold POP)

Rotecch now went on, to proffer a solution, after recurrent roof leakages, that I should tell my tiler to lay tiles around the edges (parapet) of the roof area ( hidden roof) so that water will not leak/soak at the edges or spread to the middle of roof

I told him it is better for him to get his tiler to do that and I will pay them adequately because the roof already had issues and I do not want him to start passing blame unto my tiler afterwards. Rotecch refused saying his tiler were not in town and it will be months before they are back to town so I had no other choice to use mine ….. I couldn’t wait for months because it was raining and First floor roof POP
needed to start too

Now the roof edge ( Parapet) tiling is done as advised by Rotecch; the POP has started on the first floor . Rain fell and this same roof is still leaking in multiple places …. The roof that had been fixed by ROTECCH more than 5 times …. He collected over 2 million naira for this roof

My site supervisor notified him about this immediately, he said he would send his roofer to inspect in 3 days time. I , personally, notified Rotecch and plead that 3 days time in a rainy season is too long, that this rainwater is damaging the underlying POP … he did not care… at least he has collected his money

Now, after 3days, his roofer came there, inspected the roof, took some pictures/video and left the site .. As expected, Rotecch said damage was done by both tiler and POP installation…. I said how ?? …. He showed me a pic that looks like a damage in the middle of the roof FAR from the edges ( parapet) where the tiler worked, he said tiler stepped there . I said no, tiler NEVER went there… all there work was at parapet place ..

How did POP people cause leaking roof ?? Rotecch said the design I chose for that underlying room was too heavy thereby causing a damage on the roof …. Hmmm, thinking am an idiot or first time landlord… Note it is same POP man ( on NL) that I have been using since and he never said anything about heavy. Still cannot connect the leakage of ROOF and POP

Rotecch, I know u don’t care if my POP get damaged or roof leaked but I will be using your balance to rectify all the damages caused by your INCOMPETENCY …… and if u want us to discuss other fraud, malpractices and incompetency on my site here ranging from electricals…. Structural etc U can start it . I will expose u all
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 3:10pm On Oct 10, 2022
It’s very good as you are here now.
I will reply fully when amless busy
People will now see who is a father of fraud star btw me and you.

I have all my pics, chart, vedio evidence to back up all my point.

You think you can say bad thing against me bcs am just trying to take things easy with you since all this while.

This time around am ready for you fully and exposed your fraudulent act.

Almost all people that work with you know that you are liar and non straight forward man.

You have push me to wall and I have turned back to you now.
You think you are wise Abii
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 3:47pm On Oct 10, 2022
rotecch77:
It’s very good as you are here now.
I will reply fully when amless busy
People will now see who is a father of fraud star btw me and you.

I have all my pics, chart, vedio evidence to back up all my point.

You think you can say bad thing against me bcs am just trying to take things easy with you since all this while.



This time around am ready for you fully and exposed your fraudulent act.

Almost all people that work with you know that you are liar and non straight forward man.

You have push me to wall and I have turned back to you now.
You think you are wise Abii
SHOW YOUR EVIDENCES THIEF, OLE!! GLORIFIED BRICKLAYER!!!
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 3:52pm On Oct 10, 2022
rotecch77:
It’s very good as you are here now.
I will reply fully when amless busy
People will now see who is a father of fraud star btw me and you.

I have all my pics, chart, vedio evidence to back up all my point.

You think you can say bad thing against me bcs am just trying to take things easy with you since all this while.



This time around am ready for you fully and exposed your fraudulent act.

Almost all people that work with you know that you are liar and non straight forward man.

You have push me to wall and I have turned back to you now.
You think you are wise Abii
SHOW YOUR EVIDENCES THIEF! , OLE!! … and GLORIFIED BRICKLAYER forming civil engineer/builder!!!
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 3:52pm On Oct 10, 2022
akinola98:
SHOW YOUR EVIDENCES THIEF, OLE!! GLORIFIED BRICKLAYER!!!
If you call me bad name as you used to say on our chart I will not go that line with you.. you know why?
Elders and wise people will understand.

People will see the evidence soon.

I know you have it but bcs of bad mind to label me bad person here will not allow you to post it.

But you have called for it and people shall see it here.

Am a little busy now
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 4:11pm On Oct 10, 2022
rotecch77:
If you call me bad name as you used to say on our chart I will not go that line with you.. you know why?
Elders and wise people will understand.

People will see the evidence soon.

I know you have it but bcs of bad mind to label me bad person here will not allow you to post it.

But you have called for it and people shall see it here.

Am a little busy now
Who is labelling you bad name huh
I am saying it the way it is …. SHIOOR!!
U think u are a big boss here so no one will believe me huh

Am I the first person on NL that is calling u out for your incompetency, lying or fraudulent act huh

Instead of u to defend the allegations against u …. U are calling a client that paid u over 30million for shitty job a fraud in the UK … �…., A lot of people know me on NL, who has worked with me and still working my project presently …. And we are cool

Be focus ……Defend the allegations against u … and let d police catch me if indeed am fraudulent…. At least u too collected part of the money … OLE!!
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 4:23pm On Oct 10, 2022
akinola98:
Who is labelling you bad name huh
I am saying it the way it is …. SHIOOR!!
U think u are a big boss here so no one will believe me huh

Am I the first person on NL that is calling u out for your incompetency, lying or fraudulent act huh

Instead of u to defend the allegations against u …. U are calling a client that paid u over 30million for shitty job a fraud in the UK … �…., A lot of people know me on NL, who has worked with me and still working my project presently …. And we are cool

Be focus ……Defend the allegations against u … and let d police catch me if indeed am fraudulent…. At least u too collected part of the money … OLE!!
You called me many bad names, do you think I will be happy with you.
Am not joking with you.. you have pushed me to wall and I have turned back to hot you back.
If you are truly doctor I believed you should be attending to patient by now… Uk time.

But For the sake of good client I will just pause to call you names for now ( unless you don’t stop to call me bad names) so that good and well cool headed cleint will not see me as arrogant fellow

As I said pics coming soon to back up my claim … when my head is cool.

You get it.
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 5:22pm On Oct 10, 2022
rotecch77:
You called me many bad names, do you think I will be happy with you.
Am not joking with you.. you have pushed me to wall and I have turned back to hot you back.
If you are truly doctor I believed you should be attending to patient by now… Uk time.

But For the sake of good client I will just pause to call you names for now ( unless you don’t stop to call me bad names) so that good and well cool headed cleint will not see me as arrogant fellow

As I said pics coming soon to back up my claim … when my head is cool.

You get it.
Be focus! Defend the allegations against u

My profession is not in question here

It is your FRAUDULENT ACT; INCOMPETENCY AND LYING that is in question

I am not one of your disciples/worshippers here …. I was your client that is VERY DISSATISFIED and I will say it out the way it is

PEOPLE, DON’T BE DECEIVED BY THE HOUSES HE POSTS HERE ….he goes back begging the CLIENT not to expose him after his ACTS ….. based on my experience with him

…. At least, you not the only person I have worked with on NAIRALAND…. in fact, all my workers/subcontractors presently are from nairaland and no issue with them
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 10:44pm On Oct 10, 2022
Good evening to all members here.
First of foremost I will like mr Akinola ( my cleint ) to define what is fraudulent. If he can’t, then a well learned person should help him out.

Let’s go straight to the matter.
Few months back he called me to complain about the roof we did that it’s leaking, I quickly called my roofer and Carpenter to move to site to check.
Here is what they met.
1 A small leakage at passage ( caused by a plank which looks bend) immediately this was changed and the leakage stoped till this moment.

2. A leakage in wall is edges area caused by the nature of the flat roof he know this that it usually occurred on flat roof which I have told him from beginning that suck area do need . Felt, tiles or aluminum which said he know and there is plan to tiled the area. ( that is not a leakage roof issue)

Another day he called again that there is a leakage again but serous one after heavy rain.quickly my men rush to site to check but it was discovered that the said area is WATER TANK AREA
I said ok I message him immediately that the tank area needs to be covered back and move the tank downward. ( actually I advised him to let’s place tank there before but due the flat roof section the tank was placed it didn’t work out)
To my surprise my cleint said I’m the one to foot the bill which cost about 100k plus to covered the tank area. I did it all in name of reputation and member on Nairaland … sisi he didn’t pay ..

Rotech the good fool man trying to pleased human being.( I called my sef fool here)

Fast forward to another 2-3 weeks again another message of leakage.. GOD why naa
My men rush down to site again BUT this time around it’s the Entrance posh … thank God the site supervisor and some workers are there and everyone saw it clearly that the Window design guys and some workers he engaged messed up with the roof of this verander porch ( bcs the place is not leaking since day one, until this men work there .. they messed up with the roof .. BUT guest WHAT my cleint said I should do it free again I said NEVER I will not do it but at the end of the day
… ( Rotech come again with his idea to please human being foolish me again)
I did it ooo my cleint did pay penny for it.. another ABOUt 30k again.
Going to 200k spent on what I don’t collect money for plus my old balance still with him which is 250k going to 450k now

Lastly
Before this time there was a day we argue about additional work which I said I will not do he started calling me a STUPID MAN not only once oo until I warned him use such language for me.
And I told him I will not do the said additional work but at the end of the day I still do it oo NO ADDITIONAL FEE . Then when I said he will go to nairaland I told him what he want he said I should do it works free ok I did it I move on ( he claimed I beg him here not to go to nairaland .. mr Akinola post your prove here where I beg yo.)

See at time if vendor or contractor try to settle matter amicably it’s not bcs the said person is timid oo … so get that straight to your head.

Since the last time we did this area, that is about 3weeks now nobody called to complains

Lastly this last Friday he called again roof again… what happens again … God this man will not kill me with what I don’t know about.
Well o told him my roofer will show up on Monday, today .. boom by 7:30 my roofer was on site , he did the checking on the said area he discovered that the tiler he gave work ( the cleint l) have messed up with the roof while tiling the parapet inner section.
Immediately he send me pics and video amd I called his supervisor to come over to see it but the man was too far to the site at that time. But sent him the pics and video amd he see it clearly that the cause it not from our end.
More so my roofer spoke with the pop guy( we know this guy in one of site in Benin we worked with the pop contractor) he tell my roofer that he told his oga that the design the cleint choose for those upper roof is too heave which can cause damage to the plank now or later but he said his oga look for another person to do the design and he only focused on another work there …. To him such heavy designs is good where the prop is steel.
This also has a little effect on the roof but not major as that of the messed up area by the TILER’s

Check for some pics where the workers the cleint hire messed up with the roof which caused the leakage

When I told him that I will never do it this time around he rush down here to complain

Make una help me out ooo

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 10:50pm On Oct 10, 2022
That was the diff occasion when those he hired messed up with the roof

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 10:56pm On Oct 10, 2022
This when we did the roof … initially

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by Henix(m): 11:03pm On Oct 10, 2022
[quote author=rotecch77[/quote]From the picture, it's quite obvious that the tiler mashed recklessly on the roof while working, which will definitely result to leakage

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by Henix(m): 11:10pm On Oct 10, 2022
From ur picture, it's also obvious that u economized wood while roofing the house, which will definitely affect POP work and the longevity of the roof

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by Henix(m): 11:16pm On Oct 10, 2022
rotecch77:
That was the diff occasion when those he hired messed up with the roof
It's obvious
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98:
rotecch77:
Good evening to all members here.
First of foremost I will like mr Akinola ( my cleint ) to define what is fraudulent. If he can’t, then a well learned person should help him out.

Let’s go straight to the matter.
Few months back he called me to complain about the roof we did that it’s leaking, I quickly called my roofer and Carpenter to move to site to check.
Here is what they met.
1 A small leakage at passage ( caused by a plank which looks bend) immediately this was changed and the leakage stoped till this moment.

2. A leakage in wall is edges area caused by the nature of the flat roof he know this that it usually occurred on flat roof which I have told him from beginning that suck area do need . Felt, tiles or aluminum which said he know and there is plan to tiled the area. ( that is not a leakage roof issue)

Another day he called again that there is a leakage again but serous one after heavy rain.quickly my men rush to site to check but it was discovered that the said area is WATER TANK AREA
I said ok I message him immediately that the tank area needs to be covered back and move the tank downward. ( actually I advised him to let’s place tank there before but due the flat roof section the tank was placed it didn’t work out)
To my surprise my cleint said I’m the one to foot the bill which cost about 100k plus to covered the tank area. I did it all in name of reputation and member on Nairaland … sisi he didn’t pay ..

Rotech the good fool man trying to pleased human being.( I called my sef fool here)

Fast forward to another 2-3 weeks again another message of leakage.. GOD why naa
My men rush down to site again BUT this time around it’s the Entrance posh … thank God the site supervisor and some workers are there and everyone saw it clearly that the Window design guys and some workers he engaged messed up with the roof of this verander porch ( bcs the place is not leaking since day one, until this men work there .. they messed up with the roof .. BUT guest WHAT my cleint said I should do it free again I said NEVER I will not do it but at the end of the day
… ( Rotech come again with his idea to please human being foolish me again)
I did it ooo my cleint did pay penny for it.. another ABOUt 30k again.
Going to 200k spent on what I don’t collect money for plus my old balance still with him which is 250k going to 450k now

Lastly
Before this time there was a day we argue about additional work which I said I will not do he started calling me a STUPID MAN not only once oo until I warned him use such language for me.
And I told him I will not do the said additional work but at the end of the day I still do it oo NO ADDITIONAL FEE . Then when I said he will go to nairaland I told him what he want he said I should do it works free ok I did it I move on ( he claimed I beg him here not to go to nairaland .. mr Akinola post your prove here where I beg yo.)

See at time if vendor or contractor try to settle matter amicably it’s not bcs the said person is timid oo … so get that straight to your head.

Since the last time we did this area, that is about 3weeks now nobody called to complains

Lastly this last Friday he called again roof again… what happens again … God this man will not kill me with what I don’t know about.
Well o told him my roofer will show up on Monday, today .. boom by 7:30 my roofer was on site , he did the checking on the said area he discovered that the tiler he gave work ( the cleint l) have messed up with the roof while tiling the parapet inner section.
Immediately he send me pics and video amd I called his supervisor to come over to see it but the man was too far to the site at that time. But sent him the pics and video amd he see it clearly that the cause it not from our end.
More so my roofer spoke with the pop guy( we know this guy in one of site in Benin we worked with the pop contractor) he tell my roofer that he told his oga that the design the cleint choose for those upper roof is too heave which can cause damage to the plank now or later but he said his oga look for another person to do the design and he only focused on another work there …. To him such heavy designs is good where the prop is steel.
This also has a little effect on the roof but not major as that of the messed up area by the TILER’s

Check for some pics where the workers the cleint hire messed up with the roof which caused the leakage

When I told him that I will never do it this time around he rush down here to complain

Make una help me out ooo
All you said does not make sense and have not negate the facts that u are FRAUDULENT; INCOMPETENT AND BIG LIAR . U are just perambulating instead of defending the allegations

YOU are fraudulent because you collected money from me and u bought substandard materials to site … and the few good ones u bought, u did not buy enough until other artisan insisted u must get more .. like the 2 by 2 woods u later bought for roof support when POP insisted …. Secondly u collected money from me FOR SOME JOBS u never executed till date like the roof gutter, drain u promised to do but never done till date. YOU also collected money for a lot of electrical things u did not do until the present electrician caught u and I complained but u were begging

YOU are an incompetent because several of works are shitty in which I have to get other artisans to come and correct ….. Thank GOD I insisted I was not giving u the finishings to handle for me

YOU ARE A BIG LIAR …. Because u lied all your throughout this project , collecting more money at almost every stage despite that we signed a contract at the beginning of this carcass delivery….. NOW, because I REFUSED U FINISHING JOB ON SITE … U STARTED HATING OTHER WORKERS ON SITE AND PUTTING YOUR INCOMPETENCY/BLAME ON THEM… THINKING THEY TOOK YOUR JOB …. HABA!!! NA ONLY U GO CHOP ….. GREEDY BRICKLAYER!!!!!!

YES, I owe u a balance of 250k on your works which I told u I would hold unto until am sure that all the works u did is alright because I knew, at a stage u might refuse to come and fix ur job so I will use your balance to do it

REMEMBER, u also owe me 500k for the rain gutter and drain u promised to do after plastering which till now … u have not done

See screenshots of when he promised to do rain gutter and drain after plastering but till now nothing …. U think u will fraud me and go free huh? U WILL REGRET!!!!!

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op):
Another lies busted here.
The rain gutter was done last month see prove
Or is this not your site ? But why can’t you ask your site supervisor

Chief lier
Uk fraduaster …self acclaimed doctor.

I have the full video
You are one owing me which is very clear in our record
Send me my money 450k plus

I don’t have your time again to reply you.
Bye

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 2:48pm On Oct 11, 2022
rotecch77:
Another lies busted here.
The rain gutter was done last month see prove
Or is this not your site ? But why can’t you ask your site supervisor

Chief lier
Uk fraduaster …self acclaimed doctor.

I have the full video
You are one owing me which is very clear in our record
Send me my money 450k plus

I don’t have your time again to reply you.
Bye
Ohh u quickly went to my site to fit this without telling me , after putting pressure on you for weeks to do the needful and even threatening to arrest u with police and….. expose u on NAIRALAND …. Good!! … my threats worked …. I will confirm with my site supervisor if u did a good job before I talk further on this

God saved u oh … because I have already arranged the police to carry u on Friday and detain u till Monday for your fraudulent act

BY THE WAY …. Don’t go to my site again … NEVER!! …. If u try it again behind me …. I swear u will regret it . … THIS IS THE SECOND TIME AM TELLING YOU NOT TO TRESPASS ON MY PROPERTY

OLE! BARAWO!! THIEF!!!!
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 2:56pm On Oct 11, 2022
akinola98:
Ohh u quickly went to my site to fit this without telling me , after putting pressure on you for weeks to do the needful and even threatening to arrest u with police and….. expose u on NAIRALAND …. Good!! … my threats worked …. I will confirm with my site supervisor if u did a good job before I talk further on this

God saved u oh … because I have already arranged the police to carry u on Friday and detain u till Monday for your fraudulent act

BY THE WAY …. Don’t go to my site again … NEVER!! …. If u try it again behind me …. I swear u will regret it . … THIS IS THE SECOND TIME AM TELLING YOU NOT TO TRESPASS ON MY PROPERTY

OLE! BARAWO!! THIEF!!!!
See this man ooo
You said I quickly ran to site to do it … you are very funny man Olohun
Where is the message of treat from you that you want to arrest me. Very funny you … post the message here to show your claim.
After I have busted you you are now looking for a way to defend your lies

You no get shame at all full of lies everyday.
You didn’t what Uk immigrate at all with all this your lies.

The pipes was on site since day 1 we took the roof Aluminium to site then was fixed last month with prove.
All workers including your site supervisor saw it
Pay me my balance before I report you to police
Shameless man

Continue exposing your self more more
I said again post the treat message here and the day to show your prove

You said I should not visit your site, is there any day I visited your site after I left there ?

Pay me my money
Chief fraudsters
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 4:32pm On Oct 11, 2022
rotecch77:
See this man ooo
You said I quickly ran to site to do it … you are very funny man Olohun
Where is the message of treat from you that you want to arrest me. Very funny you … post the message here to show your claim.
After I have busted you you are now looking for a way to defend your lies

You no get shame at all full of lies everyday.
You didn’t what Uk immigrate at all with all this your lies.

The pipes was on site since day 1 we took the roof Aluminium to site then was fixed last month with prove.
All workers including your site supervisor saw it
Pay me my balance before I report you to police
Shameless man

Continue exposing your self more more
I said again post the treat message here and the day to show your prove

You said I should not visit your site, is there any day I visited your site after I left there ?

Pay me my money
Chief fraudsters
U collected over 500k from me for roof gutter and drain several weeks ago …. After much pressure asking u do the job …. u refused …. I threatened to arrest u with Police … u quickly rushed to do it behind me ….SO MY THREATS WORKED ….. GOD SAVED U … u would have been in JAIL THIS FRIDAY . ….. why u go rush do am huh ……. U and ur family for beg POLICE TIRE …. FRAUDULENT BRICKLAYER!!!

FOR THE SECOND TIME …..NEVER U TRESPASS ON MY PROPERTY AGAIN …. I UNDERSTAND U ARE DIABOLICAL!!!!! ….,, but my GOD PASS U �
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by akinola98: 10:02pm On Oct 11, 2022
BABA BRICKLAYER!!!

You have not even addressed what brought me to NL ….. instead u are focusing on your other incompetencies …. Address the bad roof work

This is what �I said about the bad job on the roofing …. Another worker on site confirming it …see screenshot below ….. Substandard roof materials and not enough wood support for roof …. After collecting millions of naira from me ….. U THINK U ARE SMART huh…….,IT IS CALLED FRAUD !!!!

OLE!! BARAWO!!! THIEF!!!!

Thank God you acknowledged that you bought more woods for roof support when d POP guy and myself complained and insisted…. And I did mention this in my earlier post too

I even added the falling PILLAR u did for in the screenshot below �…. Thank GOD a real engineer came to my rescue

Don’t let me expose all your incompetences here …. U may be arrested for impersonating civil engineer/builder…..

Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 11:43am On Oct 13, 2022
Interior work still in progress here
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by somehow:
rotecch77:
Interior work still in progress here
Engr. How are you today?
Please sort with the above client. I decided not to say anything on the general room but you need to sort with the client.

The biggest currency in the world is reputation, it can pave way in the wilderness.

What makes a man is not the lack of obstacles and issues, it's how he's able to come out of them better off.

It's not about winning the argument, it's about coming out of it a better person.
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 3:14pm On Oct 13, 2022
somehow:
Engr. How are you today?
Please sort with the above client. I decided not to say anything on the general room but you need to sort with the client.

The biggest currency in the world is reputation, it can pave way in the wilderness.

What makes a man is not the lack of obstacles and issues, it's now he's able to come out of them better off.

It's not about winning the argument, it's about coming out of it a better person.
Thanks so much sir
We learn everyday bcs nobody is perfect … but one thing is sure I will not collect money and ran away never, this is my 9yrs on nairaland as registered member plus 2 yrs as guest then. ..11yrs still counting by the special grace of God
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by somehow: 3:29pm On Oct 13, 2022
rotecch77:
Thanks so much sir
We learn everyday bcs nobody is perfect … but one thing is sure I will not collect money and ran away never, this is my 9yrs on nairaland as registered member plus 2 yrs as guest then. ..11yrs still counting by the special grace of God
I know you never ran away and haven't shown to be such a person so far but somethings outside money can ruin people's reputation and business.

Just do your best and try to clear issues before they become big before people start linking you with known criminals on the construction thread.

I wish you God's speed sir.
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 3:47pm On Oct 13, 2022
Good afternoon sir/ ma I really appreciated you all both that gives good remark about my ability here and off here and those that says negative things about me .. still I appreciated you all
It’s not easy to get this money so also it’s not easy to manage a good name in construction industry in Nigeria without any small or big problem at times, bcs so many things attached to this profession and others profession as well.

But all in all I appreciated and also apologize to everyone here including my cleint MR Akins
Thank you all

Don’t mind My English bcs I don’t speak queen English.
Thanks once again
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 3:47pm On Oct 13, 2022
somehow:
I know you never ran away and haven't shown to be such a person so far but somethings outside money can ruin people's reputation and business.

Just do your best and try to clear issues before they become big before people start linking you with known criminals on the construction thread.

I wish you God's speed sir.
Thanks sir
Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by lancoalase: 5:46pm On Oct 13, 2022
I just want to express my experience with Rotech. I knew him via Nairaland when I was building my house 6 years ago. I bought all my plumbing materials from him then. To me, he was a honest and Trustworthy individual. I' m based in UK, and I have to transferred money directly into his account. On numerous occasion, I even asked him to inspect some jobs done to ascertain the quality for me without paying him a penny. I was a bit surprised when I was reading the issues, he's having with another person. I am not defending him, but just sharing my own personal experience I had with him. Thanks
1 2 3 ... 14 15 16 17 18 19 20 Reply

Construction Of 3bdrs Cottage structure By Rotecch.HOUSE! 4nos Of 3bedroom Flat With 2mini Flat@ Gbagada Ifako, 70m,CofO ,12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE234

Can ₦2M Finish The Construction Of A 2-Bedroom Flat?Construction Journal | Browne Mews By NexthomeWho Owns The Property Wife Or Husband (photo)